R 324.407
R 324.407 Drilling mud pits.
Cite as Mich. Admin. Code R 324.407
Rule 407. (1) The supervisor shall prohibit the use of a drilling mud pit if it is determined
that the mud pit causes waste.
(2) Drill cuttings, muds, and fluids shall be confined by a pit, tank, or container which is
of proper size and construction and which is located as approved by the supervisor or
authorized representative of the supervisor.
(3) Only tanks shall be utilized while drilling a well that is located in an area zoned
residential before January 8, 1993. The supervisor may grant an exception if the applicant
or permittee makes a request for an exception as part of the written application for a permit.
The supervisor may grant an exception if an applicant or permittee satisfactorily
demonstrates that a municipal water system is utilized or required to be utilized.
(4) Drilling mud pits shall be located and plotted as instructed by the supervisor. Before
construction of the mud pit, a permittee shall demonstrate to the supervisor or authorized
representative of the supervisor that there is not less than 4 feet of vertical isolation between
the bottom of the pit and the uppermost groundwater level. The bottom of the liner shall
not be installed within the observed groundwater level as determined while excavating the
pit. If groundwater is encountered during or before construction of the pit, then the
permittee shall select 1 of the following options and obtain the approval for the option from
the supervisor or authorized representative of the supervisor:
(a) The pit shall be designed and constructed so the bottom of the pit is not less than 4
feet above the groundwater level.
(b) The pit shall be designed and constructed so the bottom of the pit is above the
groundwater level, but less than 4 feet above the groundwater level, and during
encapsulation the pit contents shall be solidified using a method approved by the
supervisor.
(c) The pit shall be relocated at the well site as approved by the supervisor or authorized
representative of the supervisor.
(d) Tanks shall be used, and drilling muds disposed of, at an approved off-site location.
(5) Drilling mud pits shall be constructed as instructed by the supervisor and shall be in
compliance with both of the following minimum requirements:
(a) Pits shall be constructed with rounded corners and side slopes of not less than 20
degrees measured from the vertical.
(b) The bottom and sides of the pit shall be free of objects that could penetrate the liner.
(6) Drilling mud pits shall be lined as instructed by the supervisor and shall be in
compliance with all of the following minimum requirements:
(a) Pits shall be lined with 20-mil virgin polyvinyl chloride liners as approved by the
supervisor or with other liners that meet or exceed the 20-mil virgin polyvinyl chloride
liner requirement.
(b) Ample liner material shall be installed in a manner to allow for sags and material
loading to reduce stress on the liner and allow for a minimum 10-foot flat apron on all
sides, including enough liner material to underlay the drilling mud tank, salt washer, and
shale shaker.
(c) The bottom of the lined pit shall be weighted with earthen material or water before
anchoring the ends of the liner on the surface or placing drilling muds in the pit.
(d) Ripping, tearing, puncturing, or other destruction of a liner that may cause loss of
fluids is prohibited.
(e) Liner field seams are prohibited, except for liner field seams that result from failures
in the liner due to abrasion or accidental perforation, which shall be immediately repaired
in the field using the manufacturer's recommended procedures.
(7) Drilling mud pits shall be utilized as instructed by the supervisor and shall be in
compliance with all of the following minimum requirements:
(a) Solid salt cuttings shall not be released to inground drilling mud pits. Solid salt cuttings
obtained while drilling below the base of the Detroit River Anhydrite to the top of the
Amherstburg formation and while drilling through the formations in the Salina Group shall
be collected in a container at the shale shaker and either diverted to a device that will result
in the dissolving of the solid salt cuttings and the proper disposal of the resultant brine
pursuant to R 324.703 or removed from the drilling site to a licensed disposal facility.
(b) Twenty-four months after the effective date of these rules, only the following may be
placed in a lined pit:
(i) Water-based drilling muds generated or utilized while drilling above the base of the
Detroit River Anhydrite.
(ii) Drilling fluids generated or utilized while drilling above the base of the Detroit River
Anhydrite.
(iii) Cuttings obtained while drilling above the base of the Detroit River Anhydrite.
(iv) Cuttings and the solid fraction of drilling muds generated or utilized while drilling
below the base of the Detroit River Anhydrite, other than drill cuttings prohibited by
subdivision (a) of this subrule, if the cuttings and the solid fraction of drilling muds do not
contain free liquids as determined by the United States environmental protection agency,
paint filter liquids test, method 9095, September 1986 edition, which is adopted by
reference in these rules. Copies are available for inspection at the Lansing office of the
office of oil, gas, and minerals of the department of environmental quality. Copies may be
obtained without charge as of the time of adoption of these rules from the Michigan
Department of Environmental Quality, Office of Oil, Gas, and Minerals, P.O. Box 30256,
Lansing, Michigan 48909, or from the United States Environmental Protection Agency,
Office of Research and Development, 26 West Martin Luther King Boulevard, Cincinnati,
Ohio 45268. A permittee shall provide the necessary equipment at the site of the drilling
rig to perform the paint filter liquids test.
(v) Water-based drilling muds and entrained cuttings, other than drill cuttings prohibited
by subdivision (a) of this subrule, which are generated or utilized while drilling below the
base of the Detroit River Anhydrite, which contain weighting materials or lost circulation
materials, and which cannot reasonably be treated to eliminate free liquids as determined
by the paint filter liquids test identified in paragraph (iv) of this subdivision, if approved
by the supervisor or authorized representative of the supervisor.
(vi) Native soils.
(vii) Cementing materials.
(viii) Stiffening or solidification materials approved by the supervisor.
(c) During the initial 24 months after the effective date of these rules, only the following
may be placed in a lined pit:
(i) Water-based drilling muds.
(ii) Drilling fluids.
(iii) Cuttings that are not prohibited by subdivision (a) of this subrule.
(iv) Native soils.
(v) Cementing materials.
(vi) Stiffening or solidification materials approved by the supervisor.
(d) Machine oil, refuse, completion and test fluids, liquid hydrocarbons, or other materials
may not be placed in a lined pit.
(e) A permittee of a well shall, before encapsulation, test the fluids and cuttings remaining
in the pit to determine the concentrations of benzene, ethylbenzene, toluene, and xylene
and provide certification to the supervisor or authorized representative of the supervisor of
the test results, except that a permittee is not required to test the fluids and cuttings
remaining in the pit for benzene, ethylbenzene, toluene, and xylene if the well was drilled
with water from a source approved by the supervisor and if, during the drilling operation,
liquid hydrocarbons were not encountered.
(8) If a drilling mud pit is not closed immediately after reaching drilling completion, then
a permittee of a well shall fence the perimeter of the drilling mud pit as soon as practical
after drilling completion, but not later than 30 days after drilling completion, to prevent
public access.
(9) A permittee of a well shall close a drilling mud pit as instructed by the supervisor and
be in compliance with all of the following minimum requirements:
(a) All free liquids above the solids in the pit shall be removed to the maximum extent
practical and disposed of in an approved disposal well or used in a manner approved by the
supervisor.
(b) All drilling mud pits shall be stiffened before encapsulation, except as provided in
subrule (4)(b) of this rule. Earthen materials shall be mixed with the pit contents to stiffen
the pit contents sufficiently to provide physical stability and support for the pit cover. An
alternative pit stiffening process approved by the supervisor may be used at the option of a
permittee or if required by the supervisor.
(c) The drilling mud pit shall be carefully encapsulated and buried as soon as practical
after drilling completion, but not more than 6 months after drilling completion.
(d) Apron edges of the liner shall be folded over the pit proper.
(e) The drilling mud pit shall be totally covered with a separate piece of material that
meets or exceeds the specifications of a 20-mil virgin polyvinyl chloride cover as approved
by the supervisor. The cover shall extend beyond the outer edges of the pit to cover and
entirely encapsulate the pit and shall be sloped to provide surface drainage away from the
pit.
(f) The drilling mud pit shall be buried not less than 4 feet below the original ground grade
level.