R 324.411
R 324.411 Cementing.
Cite as Mich. Admin. Code R 324.411
Rule 411. Well casing shall be cemented by the pump and plug method or by a method
approved by the supervisor and allowed to set undisturbed at static balance with the casing
in tension, with surface pressure released, and with no backflow until the tail-in slurry
reaches 500 psi compressive strength, but for not less than 12 hours; however, if backflow
occurs, then the surface pressure shall not be released. The cement mixture shall be of a
composition and volume approved by the supervisor or authorized representative of the
supervisor. The casing shall be pressure-tested before the cement plugs are drilled or the
casing perforated. The pressure at the top of the cement shall be equal to the expected
operating pressure of the well; however, the test pressure shall not exceed the API
specification for hydrostatic test pressure for new casing, API specification 5CT,
specification for casing and tubing, July 2011, ninth edition, which is adopted by reference
in these rules. Copies are available for inspection at the Lansing office of the office of oil,
gas, and minerals of the department of environmental quality. Copies may be obtained from
the Michigan Department of Environmental Quality, Office of Oil, Gas, and Minerals, P.O.
Box 30256, Lansing, Michigan 48909, at a cost as of the time of adoption of these rules of
$237.00 each, and from the American Petroleum Institute, 1220 L Street NW, Washington,
DC 20005, at a cost as of the time of adoption of these rules of $237.00 each.