R 324.808
R 324.808 Class II well operational testing requirements.
Cite as Mich. Admin. Code R 324.808
Rule 808. (1) A permittee of a Class II well shall provide for a pressure test that meets the
requirement of subrule (2) of this rule, by a qualified person, to determine the mechanical
integrity of the tubing, casing, and packer.
(2) The annulus between the innermost casing and the tubing above the packer shall be
tested at least once each 5 years at a pressure of not less than 300 psig. A satisfactory test
shall have a pressure change of not more than 5% over a period of 30 minutes. The
difference in pressure between the testing pressure and the tubing pressure shall not be less
than 100 psig at the time of the test. At least 5 days before the test, the permittee shall notify
the supervisor or authorized representative of the supervisor of the date and time of the test.
This subrule applies to all Class II wells, including those with approved temporary
abandonment status.
(3) Within 14 days after the test, the permittee shall, on a form prescribed by the
supervisor, submit a report of each mechanical integrity test to the supervisor or authorized
representative of the supervisor. The report shall contain supporting data including, but not
limited to, gauge calibration data, pressure recordings and charts, tubing size, packer type,
and packer depth. Prior to an issuance of an authorization to inject, the supervisor or
authorized representative shall have witnessed the test or received the test data, reviewed
the test data, and determined that the permittee has demonstrated the well has mechanical
integrity.
(4) For a Class II well that has not been utilized for its intended purpose for a period of
greater than 2 years, the permittee shall, prior to resuming injection, demonstrate
mechanical integrity for the well and receive authorization to resume injection from the
supervisor or authorized representative of the supervisor.