R 325.10710b
R 325.10710b Monitoring requirements for water quality parameters.
Cite as Mich. Admin. Code R 325.10710b
Rule 710b. (1) The requirements of this rule are summarized in table 1 of this rule. The
following community and nontransient noncommunity water supplies, which are
considered "water supplies" or "supplies" in this rule, shall monitor for water quality
parameters in addition to lead and copper under this rule:
(a) Large water supplies.
(b) Small and medium size water supplies that exceed the lead or copper action level or
have optimal corrosion control treatment installed.
(2) Sample collection methods provisions are as follows:
(a) Tap samples shall be representative of water quality throughout the distribution
system taking all of the following factors into account:
(i) The number of persons served.
(ii) The different sources of water.
(iii) The different treatment methods employed by the supply.
(iv) Seasonal variability. Tap sampling under this subdivision is not required to be
conducted at taps targeted for lead and copper sampling under R 325.10710a(1)(b).
Samples collected at the entry point or points to the distribution system shall be from
locations that are representative of each source after treatment. If a supply draws water
from more than 1 source and the sources are combined before distribution, the supply shall
sample at an entry point to the distribution system during periods of normal operating
conditions, for example, when water is representative of all sources being used.
(3) The number of samples a supply is required to collect are as follows:
(a) A supply shall collect 2 tap samples for applicable water quality parameters during
each monitoring period specified in subrules (4) to (7) of this rule from the following
number of sites:
Supply Size
(Number of People Served)
Number of Sites for
Water Quality Parameters
More than 100,000
25
10,001 to 100,000
10
3,301 to 10,000
3
501 to 3,300
2
101 to 500
1
Fewer than 101
1
(b) Except as provided in subrule (5)(c) of this rule, a water supply shall collect 2 samples
for each applicable water quality parameter at each entry point to the distribution system
during each monitoring period specified in subrule (4) of this rule. During each monitoring
period specified in subrules (5) to (7) of this rule, a supply shall collect 1 sample for each
applicable water quality parameter at each entry point to the distribution system.
(4) A large water supply shall measure the applicable water quality parameters, at the
locations specified in the following subdivisions at taps and at each entry point to the
distribution system during each 6-month monitoring period specified in R
325.10710a(4)(a). A small or medium size water supply shall measure the applicable water
quality parameters at the locations specified in the following subdivisions during each 6-
month monitoring period, as specified in R 325.10710a(4)(a), that the supply exceeds the
lead or copper action level or if optimal corrosion control treatment is installed:
(a) At taps, a water supply shall measure each of the following:
(i) pH.
(ii) Alkalinity.
(iii) Orthophosphate, when an inhibitor containing a phosphate compound is used.
(iv) Silica, when an inhibitor containing a silicate compound is used.
(v) Calcium.
(vi) Conductivity.
(vii) Water temperature.
(viii) Sulfate.
(ix) Chloride.
(b) At each entry point to the distribution system, a water supply shall measure each of
the applicable parameters that are listed in subdivision (a) of this subrule.
(5) A large water supply that installs optimal corrosion control treatment under R
325.10604f(2)(d)(iii) shall measure the water quality parameters at the locations and
frequencies specified in this subrule during each 6-month monitoring period specified in R
325.10710a(4)(b)(i). A small or medium size water supply that installs optimal corrosion
control treatment shall measure the water quality parameters at the locations specified in
the
following
during
each
6-month
monitoring
period,
as
specified
in
R 325.10710a(4)(b)(ii):
(a) At taps, 2 samples for each of the following:
(i) pH.
(ii) Alkalinity.
(iii) Orthophosphate, when an inhibitor containing a phosphate compound is used.
(iv) Silica, when an inhibitor containing a silicate compound is used.
(v) Calcium, when calcium carbonate stabilization is used as part of the corrosion
control.
(vi) Sulfate.
(vii) Chloride.
(b) Except as provided in subdivision (c) of this subrule, at each entry point to the
distribution system, at least 1 sample at least every 2 weeks for each of the following:
(i) pH.
(ii) When alkalinity is adjusted as part of optimal corrosion control, a reading of the
dosage rate of the chemical used to adjust alkalinity and a reading of the alkalinity
concentration.
(iii) When a corrosion inhibitor is used as part of optimal corrosion control, a reading
of the dosage rate of the inhibitor used and a reading of the concentration of orthophosphate
or silica, whichever is applicable.
(iv) Sulfate.
(v) Chloride.
(c) A ground water supply may limit entry point sampling described in subdivision (b)
of this subrule to those entry points that are representative of water quality and treatment
conditions throughout the system. If water from untreated ground water sources mixes with
water from treated ground water sources, the supply shall monitor for water quality
parameters both at representative entry points receiving treatment and representative entry
points receiving no treatment. Before the start of the monitoring under this subdivision, the
supply shall provide to the department written information identifying the selected entry
points and documentation, including information on seasonal variability, sufficient to
demonstrate that the sites are representative of water quality and treatment conditions
throughout the system.
(6) After the department specifies the values for applicable water quality control
parameters reflecting optimal corrosion control treatment under R 325.10604f(3)(f), water
supplies shall measure the applicable water quality parameters under subrule (5) of this
rule and determine compliance with the requirement of R 325.10604f(3)(g) every 6 months
with the first 6-month period to begin on either January 1 or July 1, whichever comes first,
after the department specifies the optimal values under R 325.10604f(3)(f). Compliance
with department designated optimal water quality parameter values shall be determined as
specified under R 325.10604f(3)(g).
(7) Reduced monitoring provisions are as follows:
(a) A supply that maintains the range of values for the water quality parameters reflecting
optimal corrosion control treatment during each of 2 consecutive 6-month monitoring
periods under subrule (6) of this rule shall continue monitoring applicable water quality
parameters at the locations and frequencies specified in subrule (5) of this rule. The supply
may reduce the number of sites from which it monitors during each 6-month monitoring
period to the following:
Supply Size
(Number of People Served)
Reduced Number of Sites
For Water Quality Parameters
More than 100,000
10
10,001 to 100,000
7
3,301 to 10,000
3
501 to 3,300
2
101 to 500
1
Fewer than 101
1
(b) A water supply that maintains the range of values for the water quality parameters
reflecting optimal corrosion control treatment specified by the department under R
325.10604f(3)(f) during 3 consecutive years of monitoring specified in this subdivision
may reduce the frequency with which it collects the number of tap samples for applicable
water quality parameters specified in subdivision (a) of this subrule from every 6 months
to annually. This sampling begins during the calendar year immediately following the end
of the monitoring period in which the third consecutive year of 6-month monitoring occurs.
(c) A water supply that conducts sampling annually shall collect the samples evenly
throughout the year to reflect seasonal variability.
(d) A water supply subject to the reduced monitoring frequency that fails to operate at
or above the minimum value or within the range of values for the water quality parameters
specified by the department for more than 9 days in a 6-month period specified in R
325.10604f(3)(g) shall resume distribution system tap water sampling under the number
and frequency requirements specified in subrule (6) of this rule. The supply may resume
annual monitoring for water quality parameters at the tap at the reduced number of sites
specified in subdivision (a) of this subrule after it has completed 2 subsequent consecutive
6-month rounds of monitoring that meet the criteria of that subdivision.
(8) The results of monitoring conducted in addition to the minimum requirements of this
rule shall be considered in determining the concentrations of water quality parameters.
(9) Table 1 of this rule reads as follows:
Table 1 Summary of Monitoring Requirements for Water Quality Parameters - Lead,
Copper, Corrosion Control1
Monitoring
Period
Parameters
Location
Frequency
Initial monitoring
pH, alkalinity,
orthophosphate or
silica 2, calcium,
conductivity,
temperature, sulfate,
chloride
Taps and at entry
point or points to
distribution system
6 months
After installation
of corrosion control
pH, alkalinity,
orthophosphate or
silica 2, calcium 3
Taps
Every 6 months
pH, alkalinity
dosage rate and
concentration (if
alkalinity adjusted as
part of corrosion
control), inhibitor
dosage rate and
inhibitor residual 4,
sulfate, chloride
Entry point or
points to distribution
system5
At least every 2
weeks
After department
specifies parameter
values for optimal
corrosion control
pH, alkalinity,
orthophosphate or
silica 2, calcium 3
Taps
Every 6 months
pH, alkalinity
dosage rate and
concentration (if
alkalinity adjusted as
part of corrosion
control), inhibitor
dosage rate and
inhibitor residual 4,
sulfate, chloride
Entry point or
points to distribution
system5
At least every 2
weeks
Reduced
monitoring
pH, alkalinity,
orthophosphate or
silica 2, calcium 3
Taps
Every 6 months
annually 6 at a
reduced number of
sites
pH, alkalinity
dosage rate and
concentration (if
alkalinity adjusted
control), inhibitor
dosage rate and
inhibitor residual 4,
sulfate, chloride
Entry point or
points to distribution
system5
At least every 2
weeks
1 Table is for illustrative purposes; consult the text of this part for precise regulatory
requirements.
2 Orthophosphate shall be measured when an inhibitor containing a phosphate compound
is used. Silica shall be measured when an inhibitor containing silicate compound is used.
3 Calcium shall be measured when calcium carbonate stabilization is used as part of
corrosion control.
4 Inhibitor dosage rates and inhibitor residual concentrations (orthophosphate or silica)
shall be measured when an inhibitor is used.
5 Ground water supplies may limit monitoring to representative locations throughout the
system.
6 Water supplies may reduce frequency of monitoring for water quality parameters at the
tap from every 6 months to annually if they have maintained the range of values for water
quality parameters reflecting optimal corrosion control during 3 consecutive years of
monitoring.