R 325.1637
R 325.1637 Construction of bedrock wells.
Cite as Mich. Admin. Code R 325.1637
Rule 137. (1) Where bedrock is encountered within 25 feet of the ground surface, an
oversized borehole shall be drilled and the permanent casing shall be grouted with neat
cement for a minimum depth of 25 feet.
(2) In an area where a well can be developed only in fractured, jointed, or cavernous
bedrock, the casing may terminate in the formation if there is not less than 25 feet of soil
above the bedrock, if there is no record of the bedrock containing contaminated water, and
if geologic conditions offer no natural direct surface or near surface water inlets into the
bedrock aquifer. Where there is less overburden and deeper strata will not produce potable
water, the well owner shall obtain written approval from the health officer for water
treatment and well construction features that are necessary to provide a safe supply.
(3) Hydraulic fracturing of bedrock is not permitted without the prior written approval of
the health officer.