R 336.1911
R 336.1911 Malfunction abatement plans.
Cite as Mich. Admin. Code R 336.1911
Rule 911. (1) Upon request of the department, a person responsible for the operation of a
source of an air contaminant shall prepare a malfunction abatement plan to prevent, detect,
and correct malfunctions or equipment failures resulting in emissions exceeding any
applicable emission limitation.
(2) A malfunction abatement plan required by subrule (1) of this rule shall be in writing and
shall, at a minimum, specify all of the following:
(a) A complete preventative maintenance program, including identification of the
supervisory personnel responsible for overseeing the inspection, maintenance, and repair of
air-cleaning devices, a description of the items or conditions that shall be inspected, the
frequency of the inspections or repairs, and an identification of the major replacement parts
that shall be maintained in inventory for quick replacement.
(b) An identification of the source and air-cleaning device operating variables that shall be
monitored to detect a malfunction or failure, the normal operating range of these variables,
and a description of the method of monitoring or surveillance procedures.
(c) A description of the corrective procedures or operational changes that shall be taken in
the event of a malfunction or failure to achieve compliance with the applicable emission
limits.
(3) A malfunction abatement plan required by subrule (1) of this rule shall be submitted to
the department and shall be subject to review and approval by the department. If, in the
opinion of the department, the plan does not adequately carry out the objectives as set forth
in subrules (1) and (2) of this rule, then the department may disapprove the plan, state its
reasons for disapproval, and order the preparation of an amended plan within the time period
specified in the order. If, within the time period specified in the order, an amended plan is
submitted which, in the opinion of the department, fails to meet the objective, then the
department, on its own initiative, may amend the plan to cause it to meet the objective.
(4) Within 180 days after the department approves a malfunction abatement plan, a person
responsible for the preparation of a malfunction abatement plan shall implement the
malfunction abatement plan required by subrule (1) of this rule.