R 336.2817
R 336.2817 Public participation.
Cite as Mich. Admin. Code R 336.2817
Rule 1817. (1) The department shall notify all applicants within a specified time period as
to the completeness of the application or any deficiency in the application or information
submitted. If there is a deficiency, then the date of receipt of the application shall be the
date on which the department received all required information.
(2) Within 120 days after receipt of a technically complete application, the department
shall do all of the following:
(a) Make a preliminary determination whether construction should be approved, approved
with conditions, or disapproved.
(b) Make available in at least 1 location in each region in which the proposed major source
would be constructed a copy of all materials the applicant submitted, a copy of the
preliminary determination, and a copy or summary of other materials, if any, considered in
making the preliminary determination.
(c) Notify the public, by advertisement in a newspaper of general circulation in each region
in which the proposed major source would be constructed, of the application, the
preliminary determination, the degree of increment consumption that is expected from the
major source or major modification, and of the opportunity for comment at a public hearing
as well as written public comment.
(d) Send a copy of the notice of public comment to the applicant, to the United States
environmental protection agency, and to officials and agencies having cognizance over the
location where the proposed construction would occur. The notice shall also be sent to any
other state or local air pollution control agencies; the chief executives of the city and county
where the major source would be located; any comprehensive regional land use planning
agency; and any state, federal land manager, or Indian governing body whose lands may
be affected by emissions from the major source or major modification.
(e) Provide opportunity for a public hearing for interested persons to appear and submit
written or oral comments on the air quality impact of the major source, alternatives to it,
the control technology required, and other appropriate considerations.
(f) Consider all written comments submitted within a time specified in the notice of public
comment and all comments received at any public hearing in making a final decision on
the approvability of the application. The department shall make all comments available
for public inspection in the same locations where the department made available
preconstruction information relating to the proposed major source or major modification.
(g) Make a final determination whether construction should be approved, approved with
conditions, or disapproved.
(h) Notify the applicant in writing of the final determination and make the notification
available for public inspection at the same location where the department made available
preconstruction information and public comments relating to the major source.