Minn. R. 7852.2300

LAND REQUIREMENTS

Last amended: 1988Year: 2026Length: 83 wordsOfficial source
For the proposed pipeline, the applicant shall provide the following information: A. permanent right-of-way length, average width, and estimated acreage; B. temporary right-of-way (workspace) length, estimated width, and estimated acreage; C. estimated range of minimum trench or ditch dimensions including bottom width, top width, depth, and cubic yards of dirt excavated; D. minimum depth of cover for state and federal requirements; and E. rights-of-way sharing or paralleling: type of facility in the right-of-way, and the estimated length, width, and acreage of the right-of-way.
Minn. R. 7852.2300: LAND REQUIREMENTS | Justis AI