No. 20-82
204.051.3, RSMo 1978, does not allow the issuance of general permits as contemplated under 40 122.59. Section 204.051.3 does allow the issuance of general permits as provided in Clean Water Commission regulation 10 20-6.010. Sections 204.006 to 204.141, RSMo 1978, provide adequate authority to enforce any general permit issued pursuant to state law.
Cite as Mo. Op. Att'y Gen. No. 20-82
CLEAN WATER COMMISSION:
WATER POLLUTION:
PERMITS:
NATURAL RESOURCES, DEPARTMENT OF:
Section 204.051.3, RSMo
1978, does not allow the
issuance of general permits
as contemplated under 40
CFR 122.59.
Section 204.051.3
does allow the issuance of general permits as provided in Clean Water
Commission regulation 10 CSR 20-6.010.
Sections 204.006 to 204.141,
RSMo 1978, provide adequate authority to enforce any general permit
issued pursuant to state law.
March 4, 1982
Mr. Fred Lafser, Director
Department of Natural Resources
1915 Southridge Plaza
Jefferson City, Missouri 65101
Dear Mr. Lafser:
OPINION NO. 20
Fl LED
This is in response to your request for our opinion as follows:
Does the state have adequate legal authority
to issue and enforce general permits pursuant
to 40 CFR 122.59?
Section 122.59 of Title 40 of the Code of Federal Regula-
tions (CFR) provides for the issuance of general permits under
the National Pollutant Discharge Elimination System (NPDES)
permit program.
The original concept of an NPDES permit was that
it would be issued, after application, for an individual pollutant
source.
40 CFR 122.4, 122.53.
Certain public notice and comment
procedures attend the issuance of an NPDES permit.
See generally,
40 CFR 124.10-15.
In Opinion No. 255- 1974 (copy attached), we
held that Sections 204.006 to 204.141, RSMo 1978 (the Missouri
Clean Water Law), provide adequate authority to issue and enforce
permits in Missouri which meet the requirements under federal law
for a state-run NPDES individual permit program.
-
The general permit program, as embodied in the federal
regulations, contemplates a departure from the procedures which
are a precondition to issuance of the individual NPDES permit.
As we understand it, a general permit may be issued for storm
sewers, or for a category of sources which involve substantially
similar operations, discharge the same types of wastes, and
Mr. Fred Lafser, Director
require the same types of effluent limitations, operating con-
ditions and monitoring.
40 CFR 122.59(a)(2).
The general permit
is to be written to cover all such sources in a given geographi-
cal area.
Id.
Provision is made for requiring an individual
permit for a-source, even if within the specified category and
georgraphical area, under certain conditions which need not be
discussed here.
40 CFR 122.59(b)(2).
The procedural prerequisites for the issuance of a general
permit are the same as for issuance of individual permits.
40
CFR 122.59(b)(l).
However, these prerequisites are not triggered
by an application for a permit, as is the case with individual
permits, as no application is required for inclusion in a general
permit.
40 CFR 122.53(a).
Instead, it appears that the adminis-
trative agency initiates the issuance of a general permit on its
own motion.
Once the procedural prerequisites, such as public
notice and opportunity -for hearing, are satisfied and the permit
is issued, new sources appear to be automatically included in the
permit.
Existing sources with individual permits need only
request that the individual permit be revoked.
Upon revocation
the source automatically becomes subject to the general permit.
40 CFR 122.59(b)(2)(v).
Once a general permit has been issued,
public notice is not given each time a source becomes subject to
the general permit.
The statutory standards and prerequisites for issuance of
permits under the Missouri Clean Water Law are found in sub-
sections 2 and 3 of Section 204.051, RSMo l978.
We believe that
these subsections· control the question of whether general NPDES
permits may be issued under Missouri law.
Section 204.051 pro-
vides, in relevant part:
2.
It shall be unlawful for any person to
build, erect, alter, replace, operate, use or
maintain any water contaminant or point source
in this state that is subject to standards, rules
or regulations promulgated pursuant to the provisions
of sections 204.006 to 204.141 unless he holds a
permit from the [clean water] commission, subject
to such exceptions as the commission may prescribe by
rule or regulation.
~ •
3.
Every proposed water contaminant or
point source • • • shall make application to
-2-
Mr. Fred Lafser, Director
the [director] 1 for a permit at least thirty
days prior to the initiation of construction
or installation or establishment.
Every water
contaminant or point source in existence when
regulations or sections 204.006 to 204.141 be-
come effective shall make application to the
[director] for a permit within sixty days after
the regulations or sections 204.006 to 204.141
become effective, whichever shall be earlier.
The [director] shall promptly investigate each
application, which investigation shall include
such hearings and notice, and consideration of
such comments and recommendations as required
by sections 204.006 to 204.141 and any federal
water pollution control act.
If he determines
that the source meets or will meet the require-
ments of sect-ions 204.006 to 204.141 and the
regulations promulgated pursuant thereto, he
shall issue a permit with such conditions as
he deems necessary to insure that the source
will meet the requirements of sections 204.006
to 204.141 and any federal water pollution con-
trol act as it applies to sources in this state.
If the [director] determines that the source
does not meet or will not meet the requirements
of either act and the regulations pursuant there-
to, he shall deny the permit und~r the applicable
act and issue any notices required by sections
204.006 to 206.141 and any federal water pollution
control act.
*
*
*
1sections 204.006 to 204.141, as adopted in 1973, refer to
the executive secretary of the Clean Water Commission.
In Opinion
No. 235 -1974, we held that the position of executive secretary
of the Clean Water Commission was abol~shed by adoption of the
Omnibus State Reorganization Act of 1974, Senate Bill No. 1,
First Extraordinary Session, 77th General Assembly.
We further
held in that opinion that the director of the Department of __ c
Natural Resources was required under the Reorganization Act to
cause the policies of the Clean Water Commission to be executed,
and therefore assumed the responsibilities of the executive
secretary.
In Opinion No. 156 -
1976, we held that the respon-
sibility for issuing permits under Section 204.051 rests with the
director of the Department of Natural Resources.
We shall, in
this opinion, refer to the director of the Department of Natural
Resources, rather than the executive secretary.
-3-
Mr. Fred Lafser, Director
We note that subsection 3 provides that every proposed
source "shall make application" for a permit at least thirty days
prior to commencement of construction.
With respect to sources
in existence at the time the statute became effective, subsection
3 provides that every source "shall make application" within
sixty days after the effective date.
Subsection 3 goes on to
require the director to promptly investigate each application,
and requires the director to determine whether the source meets
or will meet the requirements of Sections 204.0~to 204.141, the
requirements of any federal water pollution control act, and the
requirements of regulations promulgated under the state and
federal statutes, prior to issuing or denying the permit.
The
director is expressly told to issue the permit if the source will
meet the requirements of the statutes and regulations, and to
deny the permit if the source will not meet those requirements.
We believe that Section 204.051.3 must be read to require
that a permit be issued only after an application is made for the
permit, and the director undertakes the specified investigation
and makes the required determinations concerning the ability of
the source to meet state and federal law.
We believe it clear
that the investigation and determinations must be made with
respect to each individual source.
It is our opinion that the
director may not utilize a general permit system as contemplated
by 40 CFR 122.59, because such a system would be contrary to
Section 204.051.3.
We are cognizant of the provision in Section 204.051.2 that
the Clean Water Commission may by regulation exempt sources or
classes of sources from the requirement to obtain a permit.
We read that provision to empower the Commission to waive per-
mitting entirely, if it so chooses, but not to waive the appli-
cation and determinations required by subsection 3, if a permit
is required.
We believe it clear from the arrangement of sub-
sections 2 and 3, and the language used therein, that the legis-
lature intended that certain prerequisites to the issuance of a
permit would apply, if a permit were required by the Commission.
Otherwise, we believe that the legislature would have expressly
empowered the Commission, in subsection 3, to waive such of those
prerequisites as it deemed appropriate, as the legislature did in
subsection 2 with regard to the question of whether a permit
would be required.
We are aware that the Clean Water Commission has recently
adopted amendments to its permitting regulation, 10 CSR 20-6.010,
to provide for the issuance of so-called general permits in
certain circumstances.
See 10 CSR 20-6.010(14).
We note that
-4-
Mr. Fred Lafser, Director
unlike the federal regulations, the Commission's permit regula-
tion does not excuse the source from making a specific applica-
tion for inclusion in the general permit.
Subsection (l)(A) of
10 CSR 20-6.010 provides that all persons who operate, use or
maintain sources must apply to the director for the permits re-
quired by the Clean Water Law~ with certain exceptions not rele-
vant to this discussion.
Section (14) of the rule, which
·
~uthorizes general permits, does not exempt the source operator
from making an application for inclusion in a general permit.
Therefore, we read 10 CSR 20-6.010 to require that any operator
of a source who wishes the source to be included in a general
permit must apply to the director for such inclusion.
We are also aware that you have interpreted 10 CSR 20-6.010
to require the director, in proposing the issuance of a general
permit, to delineate the category of sources which will be
subject to the permit so that only sources which meet or will
meet the requirements of state and federal law applicable to
those sources will be includable in the general permit.
After
issuance of the general permit, we understand it is your in-
tention to determine, upon receipt of an application for in-
clusion in the general permit, whether the particular source
falls within the parameters of the specified category.
We are of the opinion that the ~ssuance of general permits
pursuant to 10 CSR 20-6.010, if carried out as described above,
will meet the requirements of Section 204~051.3.
Unlike the
federal scheme, the state system does contemplate an application
with regard to each source, and a determination with regard to
each source that it meets or will meet the requirements of the
statutes and regulations.
The determination will be made before
any source can be included in the general permit.
This, we
believe, satisfies the pre-issuance determination requirements of
Section 204.051.3.
Your opinion request also references authority to enforce
the general permits, once issued.
As a general permit would be
issued pursuant to Section 204.051, the same as with an individual
permit, the general permit would be enforced in the same way as
an individual permit.
In Opinion No. 255 -
1974, we held, a~
Section 11 thereof, that Sections 204.006 to 204.141 contain
adequate authority to enforce permits to the degree required by
the federal statute and regulations.
Therefore, what was said in
Opinion No. 255 - 1974 is applicable to your question.
Sections
204.006 to 204.141 do contain adequate authority to enforce
general permits issued under Section 204.051 and 10 CSR 20-6.010.
-5-
Mr. Fred Lafser, Director
Your opinion request does not ask, nor do we answer, whether
regulation 10 CSR 20-6.010 meets the minimum requirements of
40 CFR 122.59, so as to authorize the director to issue general
permits under federal law.
However, it is clear that the re-
quirement under the state statute and regulation that an appli-
cation be made for inclusion of a source in a general permit is
not grounds for disapproval of the state's general permit program.
40 CFR 123.2(k) provides that with respect to the NPDES program,
the states are not precluded from adopting a program which is
more stringent or more extensive than the federal program.
We
view the individual application requirement of the state's general
permit system to fall within the scope of 40 CFR 123.2(k).
Conclusion
It is our opinion that state law, specifically Section
204.051.3, RSMo 1978, does not allow the issuance of general
permits as contemplated under federal regulation 40 CFR 122.59.
However, it is our opinion that Section 204.051.3 does allow the
issuance of general permits as provided in Clean Water Commission
regulation 10 CSR 20-6.010, as that regulation is interpreted by
the director of the Department of Natural Resources.
It is our
further opinion that Sections 204.006 to 204.141, RSMo 1978,
provide adequate authority to enforce any general permit issued
pursuant to state law.
This opinion, which I hereby approve, was prepared by my
assistant, Dan Summers.
Enclosures:
Opinion No. 235 -
1974
Opinion No. 255 -
1974
Opinion No. 156 -
1976