7 CSR 10-24.030
Procedures for Solicitations and Receipt of Proposals
PURPOSE: This rule lists procedures appropriate for solicitation and receipt of proposals, provides for oral presentations during the
procurement process and restricts team
changes.
PUBLISHER’S NOTE: The secretary of state
has determined that the publication of the
entire text of the material which is incorporated by reference as a portion of this rule would
be unduly cumbersome or expensive. This
material as incorporated by reference in this
rule shall be maintained by the agency at its
headquarters and shall be made available to
the public for inspection and copying at no
more than the actual cost of reproduction.
This note applies only to the reference material. The entire text of the rule is printed here.
(1) In addition to the public notice set forth in
section 227.107.18, RSMo, the commission
may use additional procedures deemed appropriate for the solicitation and receipt of proposals and information, including the following:
(A) Exchanges with industry before receipt
of proposals;
(B) Request for Qualification (RFQ),
Request for Proposal (RFP) and contract format;
(C) Solicitation schedules;
(D) Lists of forms, documents, exhibits,
and other attachments;
(E) Representations and instructions;
(F) Handling proposals and information;
and
(G) Submission, modification, revisions
and withdrawal of proposals.
(2) All responses to the RFQ will be evaluated by the pre-qualification review/short listing team, which is comprised of the following
Missouri Department of Transportation
(MoDOT) staff or their designated representative: chief engineer, chief financial officer,
assistant chief engineer, financial services
director, one (1) or more district engineer(s),
project manager for the given project, state
construction and materials engineer, state
bridge engineer, and the state design engineer.
An external partner(s) may be asked to act as
an observer to the pre-qualification/short listing process.
(3) Use of Oral Presentations During the Procurement Process.
(A) Oral presentations as a substitute for
portions of a written proposal may be used in
streamlining the source selection process. Oral
presentations may occur at any time in the
acquisition process and comply with any
appropriate federal procurement integrity
standards contained in 23 CFR 636.111. Title
23 CFR section 636.111 is incorporated by
reference into and made a part of this rule as
published by the United States Superintendent
of Documents, 732 N Capitol Street NW,
Washington, D.C. 20402-0001, website:
http://bookstore.gpo.gov on January 1, 2012.
This rule does not incorporate any subsequent
amendments or additions to the Code of Federal Regulations in 23 CFR 636.111.
(B) Oral presentations may augment written
information. The commission or MoDOT will
maintain a record of oral presentations to document what information was relied upon in
making the source selection decision. The
commission will decide the appropriate
method and level of detail for the record (e.g.,
videotaping, audio tape recording, written
record, contracting agency notes, copies of
proposer briefing slides, or presentation
notes). A copy of the record will be placed in
the contract file and may be provided to proposers upon request.
(4) Restrictions on a proposer’s team changes
after the proposer’s response to an RFQ
where the proposer’s qualifications are a
major factor in the selection of the successful
design-builder, such as team member switching (adding or switching team members), is
discouraged after submission of response to
an RFQ. However, the commission may use
its discretion in reviewing team changes or
team enhancement requests on a case-by-case
basis. Any specific project rules related to
changes in team members or changes in personnel within teams will be explicitly stated
in a project solicitation.
AUTHORITY: sections 226.020, 226.030,
and 227.107, RSMo 2016.* Emergency rule
filed Oct. 17, 2005, effective Oct. 27, 2005,
expired April 25, 2006. Original rule filed
Aug. 15, 2005, effective Feb. 28, 2006.
Amended: Filed Dec. 5, 2017, effective July
30, 2018.
*Original authority: 226.020, RSMo 1939; 226.030,
RSMo 1939, amended 1965, 2003, 2004, 2009; and
227.107, RSMo 2002, 2007, 2009, 2011, 2016.