8 CSR 30-3.050
Posting of Prevailing Wage Rates
PURPOSE: This rule sets forth the requirements for the posting of prevailing wage rates
on public works projects subject to the
Prevailing Wage Law.
(1) Contractors and subcontractors engaged
in public works projects shall post the applicable hourly rate of wages (the prevailing
wage or the public works contracting minimum wage as provided in section 290.257,
excluding rates on projects for which the
engineer’s estimate or the bid accepted by the
public body for the total project cost is less
than seventy-five thousand dollars ($75,000))
in a dry, accessible place within the field
office at the site of the building or construction job. On public works projects for which
no field office is needed or established, such
as road construction, sewer lines, pipelines,
and the like, a contractor/subcontractor may
post the applicable hourly rates of wages at
the contractor/subcontractor’s local office or
batch plant, so long as the contractor/subcontractor provides a copy of the prevailing
hourly wage rates to any worker upon
request. Applicable hourly wage rates must
be posted and maintained in a clearly legible
condition for the duration of the public works
project as provided by law.
AUTHORITY: section 290.240, RSMo Supp.
2018.* Original rule filed Aug. 24, 1990,
effective April 29, 1991. Emergency amendment filed Nov. 21, 2018, effective Dec. 1,
2018, expired May 29, 2019. Amended: Filed
Nov. 21, 2018, effective July 30, 2019.
*Original authority: 290.240, RSMo 1957, amended
1969, 2018.