10 CSR 20-3.010
Penalty Assessment Protocol
PURPOSE: This rule establishes the procedures for assessment of administrative penalties.
(1) General Provisions.
(A) Pursuant to sections 644.076 and
644.079, RSMo, and in addition to any other
remedy provided by law, upon determination
by the department that a provision of sections
644.006–644.141, RSMo, or a standard, limitation, order or rule promulgated, or a term
or condition of any permit has been violated,
the director may issue an order assessing an
administrative penalty upon the violator. The
amount of the administrative penalty will be
determined according to sections (3) through
(7) of this rule. In no event may the total
penalty assessed per day of violation exceed
the statutory maximum specified in section
644.076, RSMo.
(B) An administrative penalty shall not be
imposed until the department has sought to
resolve the violations through conference,
conciliation and persuasion and shall not be
imposed for minor violations. If the violation
is resolved through conference, conciliation
and persuasion, no administrative penalty
shall be assessed unless the violation has
caused, or had the potential to cause, a risk
to human health or to the environment, or has
caused or has potential to cause pollution, or
was knowingly committed, or is not a minor
violation.
(C) An order assessing an administrative
penalty shall be served upon the operator,
owner, or appropriate representative through
United States Postal Service certified mail,
return receipt requested, a private courier or
messenger service which provides verification of delivery or by hand delivery to the
operator’s or owner’s residence or place of
business. An order assessing an administrative penalty shall be considered served if verified receipt is made by the operator, owner,
or appropriate representative. A refusal to
accept, or a rejection of certified mail, private courier or messenger service delivery or
by hand delivery of an order assessing an
administrative penalty constitutes service of
the order.
(D) The director may at any time withdraw
without prejudice any administrative penalty
order.
(E) An order assessing an administrative
penalty shall describe the nature of the violation(s), the amount of the administrative
penalty being assessed and the basis of the
penalty calculation.
(F) Administrative penalties may be
assessed for each day that a specific violation
exists, including all days between separate
observations or reports which indicate that an
operator or owner is not complying with a
particular statutory or regulatory provision if
the director finds that, based on all relevant
facts and circumstances, including that
offered by the violator, the violation continued unabated during that time.
(2) Definitions.
(A) Definitions for key words used in this
rule may be found in section 644.016,
RSMo, in 10 CSR 20-2.010 and 10 CSR 206.300.
(B) Additional definitions specific to this
rule are as follows:
1. Conference, conciliation and persuasion—A process of verbal or written communications, including but not limited to meetings, reports, correspondence or telephone
conferences between authorized representatives of the department and the alleged violator. The process shall, at minimum, consist
of one offer to meet with the alleged violator
tendered by the department. During any such
meeting, the department and the alleged violator shall negotiate in good faith to eliminate
the alleged violation and shall attempt to
agree upon a plan to achieve compliance;
2. Economic benefit—Any monetary
gain which accrues to a violator as a result of
noncompliance;
3. Extent of deviation—Deviation from
the provisions of sections 644.006–644.141,
RSMo or its corresponding regulations,
rules, standards, limitations, orders or permits related to the degree to which the violation departs from or prevents the attainment
of the intended purpose of the specific statutory or regulatory requirement;
4.
Gravity-based
assessment—The
degree of seriousness of a violation, taking
into consideration the risk to human health
and the environment posed by the violation
and considering the extent of deviation from
sections 644.006–644.141, RSMo;
5. Major facility—Means any facility or
activity requiring a Missouri State Operating
Permit (MSOP) and classified as such by the
director in concurrence with the United
States Environmental Protection Agency
(USEPA);
6. Multi-day violation—A violation
which has occurred on or continued for two
(2) or more consecutive or non-consecutive
days;
7. Multiple violation penalty—The sum
of
individual
administrative
penalties
assessed where two (2) or more violations are
included in the same enforcement action;
8. Significant noncompliance—Violation
of one (1) or more provisions of sections
644.006–644.141, RSMo, or corresponding
standards, limitations, orders or rules, or a
term or condition of any permit which meets
one (1) or more of the following criteria:
A. Violation of permit effluent limits
which the department must report to the
USEPA, or would have to report if the facility was subject to noncompliance reporting
requirements;
B. An unauthorized bypass;
C. An unpermitted discharge;
D. A pass through of pollutants which
causes or has the potential to cause a violation of Water Quality Standards, 10 CSR 207.031;
E. Failure of a municipal wastewater
treatment facility to implement its approved
pretreatment program, including failure to
enforce industrial pretreatment requirements
as required in the approved program;
F. Violations of any compliance
schedule milestone by ninety (90) days or
more from the date specified in an enforcement order or a permit;
G. Failure of the permittee to provide
reports within thirty (30) days from the due
date specified in an enforcement order or a
permit;
H. Violations of narrative requirements in permit which is of substantial concern to the regulatory agency; and
I. Any other violation or group of
permit violations which the director considers to be of substantial concern.
(3) Determination of Penalties. The amount
of an administrative penalty will involve the
application of a gravity-based assessment
under subsection (3)(A) and may involve
additional factors for multiple violations
under subsection (3)(B), multi-day violations
under subsection (3)(C) and economic benefit resulting from noncompliance under subsection (3)(D). The resulting administrative
penalty may be further adjusted as specified
under subsection (3)(E).
(A) Gravity-Based Assessment. The gravity-based assessment is determined by evaluating the potential for harm posed by the violation and the extent to which the violation
deviates from the requirements of the
Missouri Clean Water Law.
1. Potential for harm. The potential for
harm posed by a violation is based on the risk
to human health, safety, or the environment
or to the purposes of implementing the
Missouri Clean Water Law and associated
rules or permits.
A. The assessment of the potential for
harm resulting from a violation will be based
on the risk of adverse effects upon humans or
the environment from exposure to water contaminants as a result of a violator’s noncompliance. The potential for harm will be
expressed as a point total and evaluated by
adding together the points assessed for criteria contained in the following categories.
Receiving Water Characteristics and
Sensitivity
Facility and Water Contaminant
Characteristics
Concentrated Animal Feeding Operation/
Animal Feeding Operation (according to size
as designated by 10 CSR 20-6.300(1)).
AG-Chem Secondary Contaminant
Industrial Facilities and Wastewaters
Current average daily flow if known or can be
readily estimated; if not, the design flow or
approximation of it. (If the violation was due
to a bypass, then the volume bypassed per day
or an estimate of that volume.)
Process Wastewater Flows
Sludge Handling Facilities (Domestic and
Industrial)
Current average daily sludge production
quantity if known or can be readily estimated; if not, the design sludge production or
approximation of it. (If the violation was due
to a bypass, then the amount bypassed per
day or an estimate of that amount.)
Sludge Handling Facilities
Storm Water Flows
Land Disturbance
Site Specific Industrial Storm Water
General Industrial Storm Water
Cooling Water Only Flows
Domestic Wastewater Facilities
Current average daily flow if known or can be
estimated; if not, design flow. (If the violation was due to a bypass, then the volume
bypassed or an estimate of that volume.)
*The points assessed may be reduced if the
permittee can demonstrate that the portion of
sewer system that is bypassing serves primarily residential areas with little or no categorical industries.
Effects of Water Contaminant Discharges
2. Extent of deviation. The extent of
deviation may range from slight to total disregard of the requirements of the Missouri
Clean Water Law and associated rules and/or
permits. The assessment will reflect this
range and will be evaluated according to the
degrees of severity. The extent of deviation
will be expressed as a point total and evaluated by adding together the points assessed for
criteria contained in the following categories:
Points
Assessed
Potential for Harm
25
Drinking water lakes (Class L1), and cold water
sport fishery streams designated in 10 CSR 207.031, groundwaters and losing streams and/or
waters listed as impaired on the current Missouri
303(d) list where the violation involved a
contaminant responsible for the waters listing
25
Critical aquatic habitats which support populations
of plant or animal species designated by the
federal government as threatened or endangered;
if in a stream, includes the main stem and
tributaries for a distance of one (1) mile upstream
of the critical habitat area
15
Outstanding national and state resource waters as
designated in 10 CSR 20-7.031
10
All other Class L2, L3, P, P1 and C waters and
metropolitan no-discharge streams as designated in
0
All other waters and unclassified streams
Points Assessed
Potential for Harm
30
Class IA - >20,000 A.U.
25
Class IA - 7,000 to 20,000 A.U.
20
Class IB
15
Class IC
10
Class II
5
Other
Points Assessed
Potential for Harm
Product
10
Liquid pesticides or fertilizers
5
Dry pesticides or fertilizers
Total On-site Tank/Tanks Capacity
10
>40,000 gallons
5
<40,000 gallons
0
No on-site storage
Points Assessed
Potential for Harm
30
> 1 million gal/day
20
500,000 to <1 million gal/day
15
100,000 to <500,000 gal/day
10
25,000 to <100,000 gal/day
5
< 25,000 gal/day
Points Assessed
Potential for Harm
30
>50,000 dry lbs/day
20
5,000–50,000 dry lbs/day
15
1,000–5,000 dry lbs/day
10
500–1,000 dry lbs/day
5
<500 dry lbs/day
Points Assessed
Potential for Harm
30
>100 acres
20
50 to <100 acres
15
20 to <50 acres
10
5 to <20 acres
5
<5 acres
Points Assessed
Potential for Harm
30
>1 million gal/day
20
500,000 to <1 million gal/day
15
100,000 to <500,000 gal/day
10
25,000 to <100,000 gal/day
5
<25,000 gal/day
Points Assessed
Potential for Harm
5
All categories of general
Points Assessed
Potential for Harm
10
>5 million gallons/day
5
<5 million gallons/day
Points Assessed
Potential for Harm
30
>50 million gal/day
25
1 million to 50 million gal/day
20
500,000 to 1 million gal/day
15
100,000 to 500,000 gal/day
10
25,000 to 100,000 gal/day
5
<25,000 gal/day
10*
Pretreatment program is/should
be in effect (in addition to
previously listed items)
Points Assessed
Potential for Harm
30
Discharge has harmful effect on animal or aquatic
life as evidenced by fish kills, creates an immediate
or persistent threat to public health or results in
impairment of any beneficial uses contained in the
Water Quality Standards, 10 CSR 20-7.031(1)(C)
30
Discharge causes violation of Cave Resources Act
sections 578.200–578.225
20
Discharge causes visible contamination of a surface
water or a violation of any general or specific
criteria described in 10 CSR 20-7.031
15
Discharge reduces water quality below existing
levels but does not prevent maintenance of beneficial
uses described in the Water Quality Standards, 10
CSR 20-7.031(1)(C)
10
Discharge causes a public nuisance (for example:
taste, odor)
5
Discharge does not comply with the effluent
limitations, but produces no readily apparent impact
on watercourse
5
A water contaminant was placed, caused or
permitted to be placed in a location where it is
reasonably certain to cause pollution
Organizational Capability and
Sophistication
Facility Compliance Status
Facility Responsiveness
Regulatory Compliance Characteristics
3. Gravity-based penalty assessment
matrix. The matrix that follows will be used
to determine the gravity-based assessment
portion of the administrative penalty.
Potential for harm and extent of deviation
form the axes of the matrix. The penalty
range selected may be adopted to the circumstances of a particular violation.
4. Base penalty determination. The final
penalty calculated shall not exceed the
amounts established in section 644.076,
RSMo.
A. The penalty assessment will be
determined by selecting the appropriate cell
from the gravity-based assessment matrix.
Potential for harm and extent of deviation
form the two (2) axes of the matrix. The
matrix is composed of nine (9) cells, each of
which contains a monetary penalty range and
a midpoint.
Extent of Deviation
B. The matrix cell appropriate for a
specific penalty assessment will be determined by identifying the appropriate category (for example, major, moderate, minor) for
both the potential for harm and the extent of
deviation. This results in the penalty being
set at the midpoint of the range in the selected matrix cell.
(B) Multiple Violation Penalty. Penalties
for multiple violations may be determined
when a violation is independent of or substantially different from any other violation.
The director may order a separate administrative penalty for that violation as set forth in
this rule.
(C) Multi-Day Penalty. Penalties for
multi-day violations may be determined when
the director concludes that a violation(s) has
continued or occurred for multiple consecutive or nonconsecutive days. Multi-day
penalty assessments will be determined by
using the Gravity-Based Assessment Matrix
in paragraph (3)(A)3. The director may seek
penalties for each day of noncompliance, not
to exceed the amount of civil penalty specified in section 644.076, RSMo.
(D) Economic Benefit. Any economic
benefits, including delayed and avoided costs
that have accrued to the violator as a result of
noncompliance, will be added to the penalty
amount. Determination will be made by the
department using an economic benefit formula that provides a reasonable estimate of the
economic
benefit
of
noncompliance.
Economic benefit may be excluded from the
administrative penalty if any one (1) of the
following occur:
1. The economic benefit is an insignificant amount;
2. There are compelling public concerns
that would not be served by taking a case
through administrative appeal or circuit court
litigation; or
3. It is unlikely that the department
would be able to recover the economic benefit in litigation based on the particular case.
Points Assessed
Extent of Deviation
30
Major discharger (municipal, industrial,
federal) or Class IA Concentrated Animal
Feeding Operation
25
Non-major industrial facility with more than
50 corporate employees
20
Non-major federal and state construction
grant-state revolving fund funded facility
15
Non-major, nonconstruction-grant or state
revolving fund funded facility, Class IB and
IC concentrated animal feeding operation, or
Missouri Public Service Commission
regulated facility
10
All other facilities
Points Assessed
Extent of Deviation
25
Facility in noncompliance more than
67% of time during a period of at
least three (3) consecutive months
15
Noncompliance with one (1) or more
requirements followed by periodic
returns to compliance
5
Infrequent problem (long periods of
compliance; noncompliance less than
20% of time; includes spills and
short-term discharge events)
Points Assessed
Extent of Deviation
30
Demonstrated recalcitrance by owner
or operator, or failure to comply until
a lawsuit was filed
20
Lack of attention and concern until
formal administrative enforcement
action has been initiated or referral to
the U. S. Attorney, U.S. Department
of Justice, Office of the Attorney
General or the county prosecutor for
civil or criminal actions
10
Violations continued after responsible
party had been clearly informed on at
least three (3) separate occasions of
the noncompliance and the need to
correct it
0
Other
Points Assessed
Extent of Deviation
25
Failure to meet schedule of compliance or attain
final limits contained in an abatement order, court
order, consent decree or settlement agreement.
20
Discharge without an MSOP permit or operation
without required permit for Class I CAFOs.
15
Discharge fails whole effluent toxicity testing (WET)
requirement specified in the operating permit.
15
Significant noncompliance with effluent limits.
10
Failure to meet schedule of compliance or special
conditions in an MSOP permit.
10
Violations of effluent limits that do not meet the
definition of significant noncompliance.
10
Failure to submit Discharge Monitoring Reports
(DMRs) or other reports required by the operating
permit or letter of approval.
10
Failure to employ or retain a certified operator if
required to do so.
10
Discharge without a required Storm Water Permit.
10
Failure to install and maintain erosion control
measures.
5
Failure to develop and implement a required Storm
Water Pollution Prevention Plan.
5
Construction without a construction permit or letter
of approval for construction, or failure to construct
in accordance to plans and specifications.
5
Failure to comply with subdivision regulations.
5
Failure to comply with MSOP standard conditions
not previously specified, including failure to provide
proper operation and maintenance and perform inplant testing.
5
Failure to meet regulatory compliance date.
Potential for Harm
Extent of Deviation
Major–51 or more points
101 or more points
Moderate–26 to 50 points
46 to 100 points
Minor–0 to 25 points
0 to 45 points
Potential
for Harm
Gravity
Major
Moderate
Minor
Major (Range)
(Midpoint)
$8,501–$10,000
$9,250.50
$7,501–$8,500
$8,000.50
$6,501–$7,500
$7,000.50
Moderate (Range)
(Midpoint)
$5,501–$6,500
$6,000.50
$4,501–$5,500
$5,000.50
$3,501–$4,500
$4,000.50
Minor (Range)
(Midpoint)
$2,501–$3,500
$3,000.50
$1,501–$2,500
$2,000.50
$0–$1,500
$750
(E) Adjustments. The department may add
to or subtract from the total amount of the
penalty after consideration of the following
adjustments:
1. Recalculation of penalty amount.
After the issuance of an order by the director,
if new information about a violation becomes
available which indicates that the original
penalty calculation may have been incorrect,
the department may recalculate the penalty;
2. Good faith efforts to comply. The
department may adjust a penalty amount
downward if good faith efforts have been adequately documented by the violator. Good
faith efforts include, but are not limited to,
documentation that the violator has reported
noncompliance or instituted measures to remedy the violation prior to detection by the
department. However, good faith efforts to
achieve compliance after agency detection are
assumed and are not grounds for decreasing
the penalty amount;
3. Culpability. In cases of heightened
culpability, the penalty may be increased, at
the department’s discretion, within the ranges
of the matrix. Likewise, in cases where there
is a demonstrable absence of culpability, the
department may decrease the penalty. Lack of
knowledge of the Missouri Clean Water Law
and any associated rule and/or permit shall
not be a basis of decreased culpability. The
following criteria will be used to determine
culpability:
A. How much control the violator had
over the events constituting the violation;
B. The foreseeability of the events
constituting the violation;
C. Whether the violator took reasonable precautions against the events constituting the violation;
D. Whether the violator knew or
should have known of the hazards associated
with the conduct; and
E. Whether the violator knew or
should have known of the legal requirement
which was violated. This criteria shall be
used only to increase a penalty, not to
decrease it.
4. History of noncompliance. Where
there has been a history of noncompliance
with the Missouri Clean Water Law or any
associated rule or permit to a degree deemed
significant due to frequency, similarity or
seriousness of past violations, and considering the violator’s response to previous
enforcement actions, the department may
increase the administrative penalty. No
downward adjustment is allowed because of
this factor;
5. Ability to pay. When a violator has
adequately documented that payment of all or
a portion of the penalty will preclude the violator from achieving compliance or from carrying out important remedial measures, the
department may take one (1) of the following
actions:
A. Waive any portion or all of the
administrative penalty; or
B. Negotiate a delayed payment
schedule, installment plan or replace upfront
penalties with stipulated penalties; and
6. Other adjustment factors. This rule
allows for other penalty adjustments based on
fairness and equity not mentioned in this rule
which may arise on a case-by-case basis.
(4) Proceeds from Administrative Penalties.
The proceeds from any administrative penalty assessed in accordance with this rule shall
be paid to the county treasurer of the county
in which the violation(s) occurred for the use
and benefit of the county schools within that
county.
(5) Natural Resource Damages. Nothing in
this rule shall be construed as satisfying any
claim by the state or federal government for
natural resource damages.
AUTHORITY: sections 644.026, RSMo Supp.
1998 and 644.079, RSMo 1994.* Original
rule filed June 8, 1973, effective June 18,
1973. Rescinded: Filed Oct. 12, 1979, effective July 10, 1980. Readopted: Filed Dec. 31,
1991, effective Aug. 6, 1992. Rescinded and
readopted: Filed April 15, 1999, effective
March 30, 2000.
*Original authority: 644.026, RSMo 1972, amended
1973, 1987, 1993, 1995; and 644.079, RSMo 1991,
amended1993.