10 CSR 20-6.015
No-Discharge Operations and Land Applica
tion Requirements
PURPOSE: This rule sets forth the requirements for no-discharge
operations or operators seeking to perform land application of
domestic, non-domestic, or industrial wastewater, or to hold or
commingle such liquids or solids.
(1) Definitions.
(A) Definitions as set forth in the Missouri Clean Water Law
and 10 CSR 20-2.010 shall apply to those terms when used in
this regulation.
(B) Other applicable definitions are as follows:
1. No-discharge facility. A facility designed, constructed,
and operated to meet each of the following conditions:
A. To hold or irrigate, or otherwise manage without
discharge to surface or subsurface waters of the state all
process wastes and associated storm water flows except for
discharges that are caused by catastrophic and chronic storm
events;
B. Process wastes are not land applied during frozen,
snow-covered, or saturated soil conditions; and
C. Basins are sealed in accordance with 10 CSR 20-8 and
there are no subsurface releases in violation of 10 CSR 20-7.015
or section 577.155, RSMo.
2. Land application of wastewater or treatment residual
materials. A treatment methodology that uses soils, vegetation,
or agricultural commodities to manage and remove pollutants,
including nutrients, from wastewater or treatment residuals.
This rule does not apply to the underground injection of
wastewater or wastewater treatment residuals as regulated
under the federal Clean Water Act and 40 CFR Part 144.
A. Land application is only an appropriate treatment
option when the land application activity supports agricultural
practices or approved beneficial purposes and is appropriately
monitored and assessed.
B. Land application irrigates, spreads, places, knifes-in,
incorporates, or otherwise puts or distributes material that
appropriately, through best management practices, utilizes
and removes pollutants from wastewater and other process
wastes.
C. Land application must provide a benefit to the soils,
vegetation, or a specific agricultural commodity without
harmful impacts to public health and the environment.
(2) General.
(A) All persons who operate, use, or maintain water contam
inant sources, point sources, or operating locations for storage,
treatment or land application of process wastes which are op
erated so as not to discharge to waters of the state or will have
infrequent discharges shall apply for permits unless exempted
under section (3) of this rule.
(B) Nothing shall prevent the department from taking action
to ensure that the operations or activities listed in subsection
(A) do not discharge into waters of the state, including requir
ing permits for operations normally exempted under this rule.
Permits may be required where necessary to protect the envi
ronment, including the following:
1. To correct noncompliance;
2. To ensure when the department has determined that
construction or operating practices are not adequate, that the
facility will be operated in a no-discharge manner;
3. To require, by departmental determination from an
on-site visit, that construction and operating permits are
necessary for special operating controls or monitoring and
reporting of site-specific conditions such as groundwater
effects, surface runoff, waste or wastewater characteristics,
topography, geology, watershed factors, or land application
loading rates;
4. When an unauthorized discharge has occurred or has
the potential to occur;
5. When a discharge results in violation of water quality
standards under 10 CSR 20-7.031; or
6. Other relevant factors.
(3) Exemptions.
(A) De minimis exemption. For the purposes of this rule, a
de minimis source is a wastewater or process waste source, or
a facility for treatment or disposal of process wastes, that is
determined by the department to pose a negligible potential
impact on waters of the state, soils, crops, public health, or
the environment, even in the event of the malfunction of
wastewater treatment controls. Persons may apply to the
department for an exemption as a de minimis source for
operations that will not discharge or will have a negligible
impact on waters of the state, soils, crops, public health, or
the environment such as short duration, limited pollutant
events. The department shall make a written determination
on a case-by-case basis, and the department’s denial or
approval must itemize the relevant conditions, activities, and
materials. This determination shall consider the potential for
releases to surface water and groundwater of contaminants
in concentrations exceeding background water quality levels
or limitations in the water quality standards rule under 10 CSR
20 Chapter 7. Prior to approval, the department may require
sampling and test methods, as determined appropriate for the
proposed activity.
(B) The following are exempt from no-discharge and land
application permit requirements unless required under section
(2):
1. Nonpoint sources;
2. Land application of composts and mulches in normal
farming operations or horticulture operations provided that
the compost does not contain more than five percent (5%)
sewage sludge or industrial sludge, which may only come from
on-site processes;
3. Land application sites for beneficial use of water
treatment plant residues removed during the treatment of
drinking water supplies provided that aluminum or other
potentially phytotoxic compounds are not present in the
residuals in concentrations which would result in toxicity
to plants or animals or have harmful impacts on waters
of the state, human health, or the environment. The land
application of water treatment plant residuals removed during
the treatment of drinking water supplies not permitted under
the Missouri Clean Water Law must submit sampling data prior
to the material(s) being initially land applied and thereafter as
determined by the department. This exemption does not apply
to treatment or storage facilities;
4. No-discharge facilities for the handling, use, or disposal
of solid wastes that holds a valid permit issued under the
Missouri Solid Waste Management Law and regulations in
accordance with 10 CSR 80 or the Missouri Hazardous Waste
Management Law and regulations in accordance with 10 CSR
25;
5. Manure land application. Liquid manure from
a concentrated animal feeding operation (CAFO) surfaceapplied on land application fields not under the operational
control of the CAFO is exempt from permitting, but subject
to the setback requirements in section 640.760, RSMo, where
applicable. Requirements for CAFOs are contained in 10 CSR
20-6.300; other land application of manure from AFOs, or other
agricultural operations not designated as CAFOs, is exempt
from permitting;
6. No-discharge treatment works treating domestic sewage
with wastewater flows of three thousand gallons per day (3,000
gpd) or less;
7. Composting sites of less than two (2) acres when sludges
are less than five percent (5%) of the compost mix and from
which no storm water is discharged except during a chronic
or catastrophic storm event. Other storm water discharges are
regulated under 10 CSR 20-6.200;
8. Land application of products containing or derived from
sludges, biosolids or other process wastes when such products
are licensed under the Missouri Fertilizer Law, sections 266.291
through 266.351, RSMo, and regulations, commercially sold,
individually labelled do not exceed pollutant standards
for protection of public health and/or the environment as
established by the department, and are applied at agronomic
rates for agricultural purposes. To receive and maintain this
exemption, the manufacturer or distributor shall submit an
initial report to the department on the pollutant content of the
product, practices for material sampling to ensure accuracy
in labelling and packaging, and shall file annual reports as
determined necessary by the department;
9. Single family residences;
10. Internal plumbing and piping or other water diversion
or retention structures within a manufacturing or industrial
plant or mine, which are an integral part of the industrial
or manufacturing process or building or mining operation.
This exemption does not include lagoon, ponds, or earthen
impoundments which receive any process wastes;
11. Small scale pilot projects or demonstration projects for
beneficial use that do not exceed a period of one (1) year may
be exempted by written project approval from the permitting
authority. The department may extend the permit exemption
for up to one (1) additional year after review of the first year’s
results. A permit application shall be submitted at least ninety
(90) days prior to end of the demonstration period if the facility
intends to continue operation, unless otherwise exempted
under this rule or Chapter 6;
12. An operating permit is not required for non-discharging
wastewater or treatment residual holding structure(s) from
which all contents are hauled to a treatment or disposal facility
out of state or with a valid Missouri state operating permit
issued under the authority of the Missouri Clean Water Law
and regulations or Missouri Solid Waste Management Law
and regulations. The holding structure(s) must be designed to
10 CSR 20-8 applicable design standards. The originator must
have a written contract with the hauler;
13. Contract haulers are not required to have a permit
under this rule if all waste is hauled to a facility permitted
under a Missouri state operating permit or Missouri Solid
Waste Management Law and regulations;
14. Activities or operational thresholds that are specifically
exempted within a general permit;
15. The placement of uncontaminated soil, rock, sand,
gravel, concrete, cinder blocks, bricks, recycled asphaltic
pavement, and minimal amounts of wood and metal which are
removed by demolition or construction activities and used as
fill for construction projects, provided that placement of such
material does not violate water quality standards as stated in 10
CSR 20-7.031. Storm water discharges may be regulated under
10 CSR 20-6.200;
16. The placement of material, other than those listed in
paragraph (3)(B)15., which are exempt as clean fill or beneficial
use under the Missouri Solid Waste Management Law and
regulations, provided the material is not placed in contact
with surface or subsurface waters of the state. Storm water
discharges may be regulated under 10 CSR 20-6.200; and
17. Satellite collection systems that are properly operated
and maintained so that all wastewater is entirely contained
within the primary holding structures and emitted into a
treatment works treating domestic sewage, without releases,
leaks or spills into the environment or discharges into waters
of the state. Satellite collection systems—
A. May include piping or conveyance systems that may
be owned or maintained by a third party, and that collect
wastewater prior to emission into the treatment works treating
domestic sewage;
B. May include tanks, basins, pump stations, manholes
or access ports that may be owned, operated or maintained
by a third party, that collect, treat or hold wastewater prior to
emission into the treatment works treating domestic sewage;
and
C. Do not include collection systems, equipment, or
conveyances under the operational control of the treatment
works treating domestic sewage.
(4) Operating Permits. This rule does not apply to concentrated
animal feeding operations (CAFOs) subject to 10 CSR 20-6.300,
stormwater discharges subject to 10 CSR 20-6.200, activities
exempted in section (3), animal feeding operations not classified
as CAFOs, or other nonpoint sources. The requirements in this
rule apply to no-discharge facilities and activities and to land
application sites, including those at discharging facilities.
(A) Operating permit applications. This subsection
describes the application process and minimum application
requirements for no-discharge operations and land application
sites. Additional application requirements may be applicable
to a facility if additional operations are occurring.
1. The application shall include at a minimum the following
documentation:
A. Narrative operational summary. This shall describe
the no-discharge operations, types and sources of materials to
be managed or land-applied, storage plans, design capacity,
and operational capacity;
B. Adequate storage for management or land application
of wastewater, sludge, wastewater treatment residuals, and
process waste for the intended design flows and capacity;
C. A recent aerial or topographic map showing the
location of any intended storage structure(s), composting
area(s), and land application fields, including setbacks
established for—
(I) Treatment works treating domestic sewage, in 10
CSR 20-8.200; or
(II) Non-domestic wastewater and residuals, the
Missouri Industrial Nutrient Management Technical Standard
for Industrial Wastewater and Wastewater Treatment Residuals
(INMTS). The INMTS required by this rule, Edition 1.0, is
incorporated by reference herein as published by the
Department of Natural Resources, Division of Environmental
Quality, Water Protection Program, PO Box 176, Jefferson City,
MO 65102-0176, October 2025, and does not include any later
amendments or additions. The INMTS is available on the
department’s website.
D. Applications for land application from treatment
works treating domestic sewage must ensure land application
will meet the design and operational requirements in 10 CSR
20-8.200; biosolids must be land applied in accordance with
permit conditions;
E. Land Application Management Plan (LAMP) for all
fields to be used for land application of industrial wastewater,
industrial wastewater treatment residuals, or process waste,
excluding manure, CAFO operations, AFOs, and treatment
works treating domestic sewage. The LAMP must comply
with the requirements established in the INMTS, unless
otherwise approved by the department, typically for facilities
land applying wastewater that does not contain nutrients or
significant concentrations of other pollutants (e.g., treated
water for irrigation or non-metallic sediment from a quarry
settling basin). This subparagraph does not apply to biosolids
that are regulated under 40 CFR Part 503. Privately owned
operating locations managing a combination of domestic
wastewater or sludges and non-domestic wastewater or
sludges may be subject to this requirement at the department’s
discretion. Unless otherwise determined by the department,
the LAMP shall include at a minimum—
(I) Site-specific conservation practices or operational
management practices to prevent the direct runoff of land
applied material and to minimize impacts to stormwater;
(II) Site-specific map(s) with sensitive features and
setbacks;
(III) Field locations and field management plans used
to establish land application rates for pollutant removal;
(IV) Calculations, data, and methods to be used to
ensure appropriate management and removal of nutrients in
the applied material; and
(V) Records that will be maintained to document
implementation and management of the minimum elements
described within this subparagraph.
F. Applications must be submitted on forms established
by the department and must include information on potential
pollutants in the wastewater or wastewater treatment residuals
to be land applied.
(B) Minimum operating permit conditions.
1. There shall be no discharge or direct runoff of wastewater,
wastewater treatment residuals, or other domestic or industrial
wastes from the field as a result of the land application of these
materials, excluding agricultural stormwater discharges.
2. The permits shall include conditions containing limita
tions, monitoring, reporting, and other requirements to protect
soils, crops, surface waters, groundwater, public health, and
the environment. These conditions include but are not limited
to—
A. Sampling requirements, including parameters,
frequency, and numeric limitations if warranted;
B. Land application minimum best management
practices to appropriately conduct land application and
prevent runoff;
C. Application must cease immediately if plant stress
or phytotoxicity attributable to the application is observed,
with land application resuming after plant recovery with
land application rates reduced to prevent plant stress and
phytotoxicity;
D. Application is not allowed on frozen, snow-covered,
saturated soils;
E. Ponding of applied liquids is prohibited, except
temporary ponding that does not leave the application area
that absorbs into soil prior to the land applier leaving the
field, and except for agricultural purposes where hydrophytic
vegetation or crops are being established (such as rice);
F. Land application is an approved wastewater treatment
method for pollutants, like nutrients, that can be effectively
removed through soils, plants, and agronomic practices;
G. Land application is not allowed for the purposes
of disposal, for the application of hazardous wastes, or
for hazardous substances in amounts known to or having
the potential to cause phytotoxicity or negative health
or environmental impacts, or any other material deemed
unsuitable by the department;
H. Adequately protective permit conditions must be
established in land application areas where the Missouri
Geologic Survey had determined geohydrological sensitive
features are present; and
I. Incorporation of the INMTS.
3. A field permitted for the land application of industrial
wastewater or wastewater treatment residuals shall only be
incorporated into one (1) Missouri state operating permit.
(5) Excluding concentrated animal feeding operations
(CAFOs), animal feeding operations not classified as CAFOs
or other nonpoint sources, land application of non-domestic
wastewater must be conducted in accordance with the INMTS
or an approved LAMP. Land application shall also be conducted
in accordance with the following:
(A) Land application rates based on hydraulic, pollutant, and
nutrient loading rates;
(B) Specific numeric pollutant limits for select parameters;
(C) A minimum of annual soil sampling for nutrients and
appropriate parameters, as determined by the department,
frequency may be increased in accordance with the INMTS;
(D) Appropriate agricultural publications from the University
of Missouri Extension center or other pre-approved related
publications, to determine crop uptake and land application
rates;
(E) Setbacks, minimum distances from identified features;
and
(F) Established permit conditions protective of crops, soil and
other earthen material, waters of the state, human health, and
the environment.
(6) Specific requirements for commingled, offsite industrial
wastewater or wastewater treatment residuals stored in open
storage basins or open storage vessels. Volume is calculated
by adding all of the open structure(s) occurring on one (1)
operating location. Storage systems must, at a minimum—
(A) Meet the following buffer (setback) distances between
the open structure(s) and any public building or occupied
residence, other than a residence owned by the permittee, or
from which a written waiver agreement is provided:
1. For structures(s) totaling a capacity of more than two
and one-half million gallons (2.5 MG) but less than or equal to
five million gallons (5 MG), one thousand feet (1000'); or
2. For structure(s) totaling a capacity of more than five
million gallons (5 MG) but less than or equal to ten million
gallons (10 MG), two thousand feet (2000'); or
3. For structure(s) totaling a capacity of more than ten
million gallons (10 MG), three thousand five hundred feet
(3500'); or
4. Written waiver agreements shall be recorded with the
county recorder and filed in the chain of title for the property
of the landowner agreeing to the shorter buffer distance;
(B) Sampling, analysis, and reporting of results must be
conducted at least annually per 644.051, RSMo, with increased
frequency as determined necessary in accordance with the
INMTS for—
1. Metals, including arsenic, aluminum, barium, cadmium,
chromium, copper, lead, mercury, selenium, silver, and
thallium;
2. Pathogens, including E. coli, fecal coliform, and
salmonella;
3. Other pollutants as determined by the department; and
(C) For systems equal to or greater than two and onehalf million gallons (2.5 MG) storage capacity, groundwater
monitoring wells shall be required when, in the determination
of the division of Missouri Geological Survey, the storage
structures are located in proximity to geological feature(s) that
increase the likelihood of groundwater contamination.
(7) Groundwater monitoring and reporting requirements for
operations subject to subsection (6)(C) and any other operation
necessitating groundwater monitoring requirements as part of
an assessment of a discharge to groundwater.
(A) Definitions for this section are found in 10 CSR 20-2 and
10 CSR 80-2. If conflicting definitions occur, the more stringent
definition shall prevail.
(B) The permittee shall submit, unless exempted by the
department, the following two (2) reports, approved by the
department, which may be furnished concurrently, along with
any additional reports the department deems necessary:
1. A site characterization report (SCR) signed and sealed by
a geologist registered in Missouri; and
2. A groundwater monitoring sampling and analysis plan
(GMSAP).
(C) If the monitoring well network has already been
installed, the department will coordinate with the permittee
to determine if any additional wells are needed or may require
additional reports to determine effectiveness of the monitoring
well network.
(D) At a minimum, the following characteristics will be
described in the SCR:
1. Geologic materials;
2. Description of soil and bedrock to a depth adequate to
allow evaluation of water quality protection provided by the
soil and bedrock;
3. Groundwater elevation;
4. Proposed separation between the lowest point of the
lowest structure and the maximum water table elevation;
5. Proximity of the structure(s) to water supply wells or
surface water;
6. Rate and direction of groundwater flow in each relevant
hydrostratigraphic unit; and
7. Current and projected use of water resources in the
potential zone of influence of the point source(s).
(E) Groundwater monitoring wells shall be installed so that
the number, spacing, and depths of the wells, determined
based upon site-specific technical information, shall include a
thorough characterization of—
1. Aquifer thickness, groundwater flow rate, groundwater
flow direction, including seasonal and temporal fluctuations in
groundwater flow; and
2. Saturated and unsaturated geologic units and fill
materials overlying the uppermost aquifer, materials
comprising the uppermost aquifer, and materials comprising
the confining unit defining the lower boundary of the
uppermost aquifer, including but not limited to thicknesses,
stratigraphy, lithology, hydraulic conductivities, and porosities.
If the lower confining unit is one hundred feet (100') or more
below the top of the uppermost aquifer, borings verifying the
lower confining layer will not be required. The upper fifty feet
(50') of the uppermost aquifer will be characterized.
(F) Groundwater monitoring wells shall be capable of yielding
groundwater samples for analysis, effective monitoring of the
site, and consist of at least one (1) well installed hydraulically
upgradient, that is, in the direction of increasing static head
from the point source(s); and at least two (2) wells installed
hydraulically downgradient, that is, in the direction of
decreasing hydraulic head from the point source(s); more
wells may be required if determined necessary to adequately
assess potential groundwater impacts. The quantity of wells,
locations, and depths shall be sufficient to yield groundwater
samples that are—
1. Representative of background water quality in the
groundwater near the point source(s);
2. Capable of detecting any significant amounts of fluids
generated by the structure(s) that migrate from the point
source(s) to the groundwater;
3. Capable at a minimum of monitoring all saturated zones
down to and including the uppermost aquifer; and
4. Located from the point source(s) a maximum distance of
one hundred fifty meters (150 m) or four hundred ninety-two
feet (492').
(G) The design and installation of groundwater monitoring
well systems shall be observed, supervised, and certified by
a Missouri groundwater professional, and the monitoring
well system shall be approved by the department prior
to installation. Additional wells may be required by the
department at any time if the existing network is insufficient.
(H) The permittee shall determine the rate and direction
of groundwater flow each time groundwater is sampled.
Groundwater elevations in wells shall be measured within
a period of time short enough to avoid temporal variations
in groundwater flow which could preclude accurate
determination of groundwater flow direction.
(I) Sampling and reporting.
1. Each groundwater monitoring event must include
consistent sampling and analysis procedures that are designed
to ensure monitoring results provide an accurate representation
of groundwater quality at the monitoring wells. The monitoring
frequency will be determined by the department based on the
site-specific factors, in no case less than annually.
2. The permittee shall submit the GMSAP to the department
for approval. The GMSAP shall include procedures and
techniques for each monitoring event, including—
A. Monitoring well maintenance, if performed;
B. Monitoring well redevelopment, if performed;
C. Monitoring well depth measurement and hydraulic
levels;
D. Monitoring well purging and sampling utilizing
dedicated equipment, or the appropriate decontamination
procedures;
E. Equipment calibration;
F. Decontamination and field blanks;
G. Sample and duplicate sample collection;
H. Sample preservation;
I. Sample labeling;
J. Sample handling;
K. Field measurements;
L. Field documentation;
M. Chain of custody control;
N. Sample shipment;
O. Analytical procedures;
P. QA/QC control—field, samples, and laboratory.
3. The GMSAP shall include sampling and analytical
methods that are appropriate for groundwater sampling
and that accurately measure monitored constituents in
groundwater samples, as required by the department. The
plan shall include the anticipated parameters of concern for
the specific facility. Analysis shall be performed on unfiltered
samples (except for those occurring in the dissolved fraction,
e.g., hexavalent chromium) for all constituents listed in the
GMSAP.
4. Once approved, the GMSAP shall be followed by the
permittee and any deviation from the GMSAP requirements
shall be noted and submitted to the department with the
monitoring results.
5. Reports shall be furnished to the department at
intervals necessary to determine compliance with Missouri’s
Groundwater Water Quality Standards, in no case less than
annually.
(8) Closure of Waste Storage Structures.
(A) No-discharge facilities that cease operation, or plan to
close lagoons and other waste storage structures, shall comply
with 10 CSR 20-6.010(12) as well as the following requirements:
1. Facilities that are exempted from permits under this rule
and that cease operation shall either close the waste storage
structures in accordance with subsection (8)(B) of this rule or
continue to maintain all storage structures so that there is not
a discharge to waters of the state.
(B) Closure requirements. Lagoons and waste storage
structures shall be closed by removal and land application
of all wastewater and sludges, or in accordance with an
alternate closure plan approved by the department. The
removed wastewater and sludges shall be land applied in
accordance with the INMTS, department-approved LAMP, or
department-approved closure plan. After removal and proper
land application of wastewater and sludge, the earthen basins
may be—
1. Demolished by removing the berms, grading, and
revegetation of the site so as to provide erosion control; or
2. Left in place for future use as a farm pond or similar
uses or reserved for future use as a waste storage structure. To
prevent damage to the bottom seal due to drying and weed
growth, earthen basins shall be refilled with fresh water as
soon as possible, and water depths of three feet (3') or more
should be maintained.
AUTHORITY: section 644.026, RSMo 2016, and sections 644.041
and 644.051, RSMo Supp. 2025.* Original rule filed July 15, 1991,
effective Jan. 13, 1992. Amended: Filed June 1, 1995, effective Jan.
30, 1996. Amended: Filed Nov. 3, 1997, effective July 30, 1998.
Amended: Filed June 13, 2018, effective Feb. 28, 2019. Amended:
Filed July 14, 2025, effective Feb. 28, 2026.
*Original authority: 644.026, RSMo 1972, amended 1973, 1987, 1993, 1995, 2000, 2012,
2014; 644.041, RSMo 1972, amended 1973, 2024; and 644.051, RSMo 1972, amended
1973, 1982, 1990, 1999, 2000, 2002, 2006, 2011, 2012, 2013, 2014, 2015, 2023, 2024.