10 CSR 22-2.050
Issuing First Permit
PURPOSE: This rule describes the procedure
for issuing the first permit to a dam and
reservoir owner for a particular dam and
reservoir.
(1) A permit will be issued or a letter will be
sent to the owner with comments within
forty-five (45) days after the receipt of a
properly prepared application or after the
completion of any hearings or record period
conducted by the council in connection with
the application, whichever is later. The council, upon hearing the recommendations of the
chief engineer, shall approve or deny the permit application.
(2) A permit will be issued if a complete and
proper application has been submitted and
the dam and reservoir comply with the law.
(A) A registration permit may be denied if
it is determined that the owner has not complied with the experienced professional engineer’s or agency engineer’s inspection recommendations.
(B) A construction permit may be denied if
there is insufficient information to determine
that the proposed construction, alteration,
enlargement, reduction or removal of a dam
or reservoir would not endanger public safety, life or property or otherwise would comply with the law.
(C) A safety permit may be denied if it is
determined that there are violations of the
construction permit or the law.
(D) If revisions have been made which
vary substantially from the provisions of the
construction permit, the owner must show
that the revisions do not endanger public
safety, life or property before a safety permit
will be issued.
(3) Conditions contained in a construction
permit shall include that the construction
work must be under the responsible charge of
an experienced professional engineer and the
records be kept and made available as
required by the chief engineer including,
without limitation, for the foundation excavation and inspection and placement of backfill
in the core trench. It is not necessary for the
engineer in responsible charge to be on-site
continuously. During construction, the council or its delegate, the chief engineer, may
make periodic site inspections the purpose of
inspecting and securing conformity of construction with the approved plans and specifications and the owner shall permit, upon reasonable notice, the person entry upon its
property to make such inspections. The
owner may be required to perform, at its own
expense, reasonable work or tests as are necessary to provide sufficient information to
enable the council to determine that there is
conformity. Usually, testing will be limited to
verification of embankment compaction, concrete strengths and other similar requirements. It is expected that the tests will be
required where the owner’s inspection
records are lacking.
(4) Any significant modifications from a construction permit or approved plans makes the
permit void and requires the owner to obtain
a new permit. Significant modification to the
plans and specifications must be prepared by
an experienced professional engineer. The
council or its delegate will follow the same
evaluation procedures for the modifications
as used with issuance of the original construction permit. Special attention will be
given to these modification requests to provide a quick decision.
(5) The owner of a dam and reservoir that is
removed under a construction permit must
notify the council or its delegate when this
work is completed and in conformity with the
provisions of the construction permit. The
council or its delegate will then issue a final
approval to relieve the owner of the requirement to have a permit upon a showing that the
requirements of the law for removal have
been satisfied.
(6) Approval by the council for a construction
permit becomes invalid within one (1) year,
unless work on the construction has begun
within that period, except that the owner may
be excused from beginning work for a period
of time that the work is prevented by flood,
shortage of materials or regulation of government which cannot be met for reasons over
which the owner has no control or other causes beyond the owner’s control. The same
applies to construction of approved modifications contained in the conditions of a registration or safety permit for industrial water
retention dams unless the conditions specify a
different time schedule.
AUTHORITY: sections 236.400, 236.415,
236.435, 236.440 and 236.465, RSMo 1986
and 236.405, RSMo Supp. 1993.* Original
rule filed April 14, 1981, effective Aug. 13,
1981. Amended: Filed June 14, 1984, effective Jan. 1, 1985.
*Original authority: 236.400, 236.415, 236.435, 236.440
and 236.465, RSMo 1979 and 236.405, RSMo 1979,
amended 1993.