19 CSR 30-70.640
Project Notification for Industrial Lead Abatement Projects
PURPOSE: This rule delineates the procedure for filing an industrial lead abatement
project notification with the Missouri
Department of Health, Office of Lead
Licensing and Accreditation.
(1) Notification. Any person or entity conducting an industrial lead abatement project
shall submit a notification to the department
at least ten (10) business days prior to the
onset of the lead abatement project.
(A) The notification shall be mailed with a
check or money order made payable to the
Missouri Department of Health for the nonrefundable fee of twenty-five dollars ($25) to
the Missouri Department of Health, Attention: Fee Receipts, P.O. Box 570, Jefferson
City, MO 65102-0570.
(B) The notification form provided by the
department shall include the following:
1. The street address, city, state, zip
code and county of each location where
abatement will occur;
2. The name, address and telephone
number of the property owner;
3. An indication of the type of structure
being abated (i.e., bridge, superstructure or
other structure that is not a dwelling or childoccupied facility);
4. The date of the onset of the abatement
project;
5. The estimated completion date of the
abatement project;
6. The work days and hours of operation
that the abatement project will be conducted;
7. The name, address, telephone number and license number of the lead abatement
contractor;
0HGLD
&OHDUDQFH/HYHO
,QWHULRU)ORRUV
PJIW
3RUFK)ORRUV
PJIW
,QWHULRUZLQGRZVLOOV
PJIW
:LQGRZWURXJKV
PJIW
Media
Clearance Level
Bare soil (dwelling perimeter and yard)
2,000 ppm
Bare soil (small high contact areas,
such as sandboxes and gardens)
400 ppm
8. The name and license number of each
lead abatement supervisor;
9. The name and license number of each
lead abatement worker;
10.
The
type(s)
of
abatement
strategy(ies) that will be utilized (i.e., encapsulation, replacement, and/or removal); and
11. The signature of each lead abatement supervisor which certifies that all information provided in the project notification is
complete and true to the best of the supervisor’s knowledge.
(2) Emergency Notification. If the lead abatement contractor is unable to comply with the
ten (10)-day notification period in the event
of an emergency situation as defined in 19
CSR 30-70.600, the lead abatement contractor shall—
(A) Notify the Office of Lead Licensing
and Accreditation (OLLA) by telephone, facsimile, or electronic mail within twenty-four
(24) hours of the onset of the lead abatement
project; and
(B) Submit the written notification and
notification fee as prescribed in section (1) of
this regulation no more than five (5) business
days after the onset of the lead abatement project.
(3) Renotification. A renotification shall be
submitted to OLLA at least twenty-four (24)
hours prior to any changes from the original
project notification.
(A) A renotification form shall be mailed
to the Missouri Department of Health, Office
of Lead Licensing and Accreditation, P.O.
Box 570, Jefferson City, MO 65102-0570.
(B) The renotification form provided by the
department shall include the following:
1. The street address, city, state, zip
code and county of each location where
abatement will occur;
2. The name, address and telephone
number of the property owner;
3. An indication of the type of structure
being abated (i.e., bridge, superstructure or
other structure that is not a dwelling or childoccupied facility);
4. The license number of the lead abatement contractor;
5. A list of changes to the original notification which may include the following:
A. The date of the onset of the abatement project;
B. The estimated completion date of
the abatement project;
C. The work days and hours of operation that the abatement project will be conducted;
D. The name, address, telephone
number and license number of the lead
abatement contractor;
E. The name and license number of
each lead abatement supervisor;
F. The name and license number of
each lead abatement worker; and
G. The type(s) of abatement strategy(ies) that will be utilized (i.e., encapsulation, replacement, and/or removal); and
6. The signature of the lead abatement
supervisor which certifies that all information
provided in the project notification is complete and true to the best of the supervisor’s
knowledge.
AUTHORITY: sections 701.301, 701.309 and
701.312, RSMo Supp. 1998.* Emergency rule
filed Aug. 19, 1999, effective Aug. 30, 1999,
expired Feb. 25, 2000. Original rule filed
Aug. 19, 1999, effective Feb. 29, 2000.
*Original authority: 701.301, RSMo 1998; 701.309, RSMo
1998; and 701.312, RSMo 1993, amended 1998.