1 CSR 30-4.020
Facility Management
PURPOSE: This rule establishes standards
and procedures for management of buildings
or facilities under the operational direction of
the Division of Facilities Management,
Design and Construction.
(1) Energy Conservation.
(A) General. Under the direction of the
Division of Facilities Management, Design
and Construction, each facility should implement energy conservation programs and initiatives that have the goal of more efficient
use of energy and utilities. The program
should include active management, supervision, and tracking in order to assure that
energy conservation goals are achieved.
Revisions of operational practices and procedures should be incorporated to obtain
revised goals and/or projects as conditions
change or new requirements develop.
(B) Program Development.
1. New construction or alterations. New
construction or alterations to existing facilities shall require that all major elements and
systems which consume energy or utilities be
evaluated to economically minimize energy
use. Requirements shall be established for
designers of new facilities or alterations to
existing facilities to provide (at a minimum) a
summary of the examination and conclusions
which established the annual energy consumption, selection of each utility system,
and each major item of energy consuming
equipment. The energy conservation standards and criteria established by the director
or the American Society of Heating,
Refrigeration and Air Conditioning Engineers
(ASHRAE) in the most current edition or
Federal Energy Management Program
(FEMP) standards whichever is more stringent and has been established as the energy
standards and criteria for Missouri facilities.
These standards and criteria shall be utilized
in designing and selecting systems and equipment which consume utilities or energy.
2. Existing facilities.
A. Energy audit. The Division of
Facilities
Management,
Design
and
Construction should maintain energy information allowing for audits and benchmarking
of each facility to determine where and how
energy is used. The process should identify if
energy usage can be reduced by changes in
operating practices, equipment, or building
systems or physical conditions.
B. Implementation. Those changes
which can be made within current appropria-
tions should be made immediately. Changes
which require additional funding, for example, purchase of new equipment, energy saving capital improvements, should be implemented as soon as funds are available. Energy
conservation measures shall be implemented
which generate cumulative savings equal to
their cost within the number of years considered by industry standards to be cost effective.
(2) Facility Records.
(A) General. Each facility should maintain
the following records at the site:
1. As-built drawings reflecting current
status, including significant changes resulting
from construction or maintenance and repair
work.
2. Equipment manuals and manufacturers’ literature, along with operational and
maintenance logs.
3. A control diagram for each separate
control system identifying the equipment and
sequence of operation.
4. All warranties issued, which should
be periodically reviewed by the facility operations personnel.
(3) Maintenance Programs and Standards.
(A) Facility systems. The Division of
Facilities
Management,
Design
and
Construction is responsible for maintaining
assets and assisting state entities in meeting
their facility needs for the benefit of the public through preventive maintenance and repair
of the facility systems. The mission is to provide a superior workplace environment to
assure health and safety for state occupants
and their visitors and protect the state’s
investments in property assets.
(B) Planned Maintenance Program. An
effective planned maintenance program provides for maintaining facilities and equipment
in a safe and acceptable condition, promotes
effective use of facility maintenance personnel, establishes a basis for determining budget requirements and long-range planning,
and provides a means of evaluating the maintenance effort. The program includes inspections and/or evaluation of conditions or
requirements, establishment of priorities,
scheduling, servicing and operation of facility equipment, corrective work, and supervisory evaluation of the maintenance effort.
1. Inspection. Regular periodic condition assessment inspections of all facility elements and systems are essential for discovery
of deficiencies before they deteriorate into
major repair require ments. These assessments are to occur annually. Reports of deficiencies from facility occupants, or from preventative maintenance inspections, require
verification and technically qualified examination to determine the cause and extent of
the deficiency. Additional information may be
necessary to determine corrective action or
work, as well as to estimate the cost of materials, equipment, and labor for that action or
work.
(C) Preventative Maintenance. Preventative
maintenance will be accomplished on a regular schedule in order to substantially reduce
the scope and cost of corrective maintenance/repair, emergency repairs, downtime,
and overtime.
1. Inspection. Scheduled preventative
maintenance for a facility element, system or
equipment item should include inspection of
the items as often as necessary to meet or
exceed manufacturers’ recommendations.
The inspection may include, but is not limited to, conditions and appearance of materials, fastenings, seals, drive systems, lubrication, or other elements. Deficiencies should
be noted each time an item is serviced. A
work order system will be utilized to record
necessary work, accomplished work or conditions, or both, noted for each element. The
work order also serves to assure that no element is inadvertently omitted. Remarks
should be included on the work order providing specific information concerning noted
problems or deficiencies.
2. Minor Repairs. Normally, repair work
is not a part of the regular scheduled service.
However, when the individual performing the
servicing has the supplies and tools available,
and the repair can be accomplished quickly,
minor repairs can be performed during the
scheduled servicing. This repair work should
not be undertaken if it prevents completion of
the servicing schedule. A condition requiring
maintenance/repair discovered during scheduled servicing should be reported, so that
needed work can be evaluated and performed
as an emergency repair, if necessary, or as a
programmed maintenance item.
(D) Emergency Repair. Emergency work
may include some items previously programmed, but only to the extent necessary to
restore service, correct imminent hazards, or
prevent breakdowns. Because of the expense
of emergency work, the scope of emergency
work will be limited to the items that are necessary to correct the emergency condition. In
many instances, this will limit the work to
temporary repairs until a permanent solution
can be achieved. Completion of any remaining corrective work will be programmed to
provide the most cost-effective procedure.
(E) Repair versus Replacement. When
repairs are estimated to cost more than fifty
percent (50%) of the replacement cost of an
item or system, the decision for repair or
replacement should be supported by an analysis of the total cost of ownership. The total
cost of ownership includes installed cost,
operational cost, maintenance cost, salvage
value, and life cycle considerations. The
most economical method (repair or replacement) should be selected for programmed
repairs.
(F) Equipment. Each item of facility
equipment has a requirement for inspection
and servicing after a specific interval of operation. The goal of inspecting and servicing
equipment will be to maintain peak equipment efficiency during its expected life cycle
to minimize downtime and equipment failure.
Equipment preventive maintenance will be
scheduled and tracked through the appropriate software system.
(G) Backlog of Maintenance/Repair.
Facility managers are responsible for minimizing the maintenance/repair backlog
through preventative maintenance, conservation, and effective use of available resources.
1. Operations Budget Items. Minor
items in the backlog of maintenance/repair
work that can be accomplished by in-house
forces or with standing maintenance contracts
should be specifically identified and included
in the written justification for operations budget.
2. Capital Improvement Items. Major
items in the backlog of maintenance/repair
work should be specifically identified and
included in the Capital Improvement Budget.
(H) Plans and Specifications. All work that
involves the structural integrity of the facility,
life safety modifications, or major revisions
or major additions of elements in the utility
systems shall have plans and specifications
prepared under the supervision of a registered architect or registered professional
engineer. The professional is required to affix
a professional seal to those plans. These
plans and specifi cations shall comply with
the requirements, codes and standards listed
in 1 CSR 30-3.030. This requirement applies
to work performed by in-house personnel, as
well as by contract. Emergency work that
involves the facility structure, or major revisions or additions of elements or controls in
the utility systems, when time will not permit
preparation of plans and specifications, shall
be performed under the supervision of a registered architect or registered professional
engineer. Emergency work shall be documented and maintained as a part of the asbuilt drawings for the facility.
(I) Contracts. Maintenance and/or repair
may be accomplished through the use of inhouse personnel, through the use of individual contracts, or through the use of standing
contracts. Services, materials, equipment and
supplies for maintenance and/or repair will
be procured in accordance with the provisions of Chapter 8 or Chapter 34, RSMo, as
amended. Personnel are not authorized to
procure services, materials, equipment, or
supplies exceeding twenty-five thousand dollars ($25,000) in value unless specific authority has been delegated to the employee for
such procurement. Contracts exceeding twenty-five thousand dollars ($25,000) in value
will be handled by Division of Facilities
Management, Design and Construction contracts staff or by the Division of Purchasing,
as appropriate.
(J) The Division of Facilities Management,
Design and Construction uses software programs to track the maintenance and repairs
needed and performed at facilities statewide,
including to plan preventative maintenance
activities/functions, to create, track, maintain, and schedule work orders for maintenance personnel to perform facility repairs,
and to track maintenance inventory. Facility
managers are responsible for familiarizing
themselves with the software systems utilized
by the Division of Facilities Management,
Design and Construction and utilizing such
systems as directed.
(4) Facility Safety.
(A) Safety Inspections. Fire systems, elevators, backflow preventers, emergency lighting, fire extinguishers, public address systems, as well as other life safety systems will
be inspected according to all applicable local
and state codes and ordinances, and as set
forth herein.
(B) Emergency Planning. Preplanned
response to emergencies is essential for the
safety of personnel and for minimizing property damage. Therefore, plans for action in
the event of emergencies will be prepared and
include the following:
1. Actions and procedures to promote
protection and safety of personnel and to
minimize potential damage to property.
2. A listing of all current staff that are
Federal Emergency Management Agency/State
Emergency
Management
Agency
(FEMA/SEMA) certified staff members.
3. Designation of knowledgeable personnel to coordinate actions to minimize or
control potential damage.
4. Actions to be taken in the event of
fires or other emergencies in adjacent facilities or areas. Liaison to allow notification to
or from occupants in adjacent facilities will
be established.
5. Actions for appropriate operation of
electrical controls. This planning shall be
coordinated with local emergency agencies to
assure their awareness of these actions for
their own operations in an emergency.
(C) Evacuation Plans. Evacuation plans will
be established for each facility, and include
clearly marked routes, exits, and assembly
areas for occupants, one (1) designated
employee to ensure evacuation of the area,
designation of fire lanes in drives adjacent to
the facility, and actions to assure that these
lanes remain clear. Evacuation plans will be
posted in prominent locations throughout the
facility. A line drawing floor plan of a minimum eight and one-half inches by eleven
inches (8 1/2" × 11") size paper will be prepared for each floor to show evacuation
routes, and posted in prominent locations on
the corresponding floor.
(D) Coordination with Local Agencies and
SEMA. All emergency and evacuation plans
will be coordinated with local agencies for
fire and police protection and for disaster
planning to assure organized efforts by all
parties when action is necessary. Local agencies will be consulted in the development of
emergency plans for their recommended
responses. State facilities may be used for
shelter in cases of disasters. The use of state
facilities for shelter will be coordinated and
preplanned in the event other suitable local
facilities are not available. The Continuity of
Operations (COOP) and Continuity of
Government (COG) emergency preparedness
plan processes will be coordinated with the
State Emergency Management Agency
(SEMA) for all state entities to provide emergency contact information in the event of an
emergency declaration.
(E) Emergency Drills.
1. Fire Drills. At least once annually, in
addition to regular alarm system tests, a fire
drill will be held. All personnel shall evacuate the facility by designated routes to designated assembly areas. One (1) or more
employees, as appropriate, will be designated
to assure that fire lanes have been cleared.
Design and Construction
After each fire drill, the facility manager will
obtain a report of actions and observations
from each person assigned a fire emergency
task. Reports may be formal or informal and
will be considered in reviewing the effectiveness of the fire drill. After reviewing actions
and results of fire drills, the facility manager
will take action and/or make recommendations, as appropriate, to incorporate improvements into the plan.
2. Tornado Drills. Tornado drills will be
held periodically to familiarize personnel
with appropriate procedures. Each tornado
drill will be evaluated by the agency to determine effectiveness and to make improvements.
(F) Fire Prevention and Protection.
1. Coordination with local fire department. Facility managers for each site will
establish a liaison with the local fire department and invite the local fire personnel to
make informal inspections and recommendations for fire prevention and protection. The
visits by fire department also provide the
opportunity for them to be familiar with the
facility and contents, which will enhance the
effectiveness of their operation if a fire
occurs. The coordination will also address
emergency actions that are appropriate for
state employees at the facility, including limitations on actions by these employees.
2. Inspections
by
the
Facilities
Management Design and Construction.
Facility managers will designate one (1) or
more persons to make regular scheduled fire
prevention inspections, including fire extinguishers. The number of persons designated
will depend on the area, the items to be
inspected, and the interval between inspections. Each extinguisher will have a tag to
record date and initials for each inspection.
In some locations, these inspections can be
incorporated into preventative maintenance
schedules. A report of deficiencies noted will
be made to the facility manager, and corrective action will be initiated.
3. Installed alarm systems. Installed
alarm systems will be included in preventative inspection and maintenance schedules
and tested periodically on a regular schedule.
The date and results of each test will be
entered into the system maintenance file
record. Failure of an alarm system to function
properly in a test is considered an emergency
condition, and corrective action will be taken
immediately.
4. Grounds maintenance should incorporate measures to minimize potential for
trash, grass, or brush fires.
(G) Electrical System Safety.
1. Applicable code requirements will be
met for all wiring and electrical equipment on
maintenance or repair projects.
2. Inspections. Preventative inspection
and maintenance schedules will include
inspection (and servicing as appropriate) of
electric wiring and equipment. Deficiencies
noted in capacity or condition of electric
wiring or equipment will be evaluated immediately to determine the potential as imminent
hazards. Deficiencies determined to be imminent hazards will be scheduled for immediate
correction. Other noted deficiencies will be
scheduled by priority.
3. Repairs. Repairs to electrical wiring
and equipment will be accomplished only by
experienced personnel following procedures to
assure minimum potential hazards. Repairs to
electrical wiring or electrical equipment will
be accomplished by using a lockout/tagout
procedure with a team of two (2) or more persons. Materials and equipment installed during the electrical repairs will be in accordance
with current International Building Code
(IBC) electrical codes.
(H) Lighting. Safety and/or emergency
lighting will provide minimum lighting levels
to assure safe movement of personnel.
Emergency lighting, including exit lights, will
be included in preventative inspection and
maintenance programs, to assure proper
functioning in accordance with current IBC
electrical codes. Night lighting will be adequate to provide minimum essential light levels in all corridors or aisles.
(I) Floor loads. Floors are designed to
carry specific loads. Normally these loads
are expressed in terms of concentrated loads
(such as file cabinets) on a small area or uniform loads (such as desks) spread over a
wider area. Facility managers will become
familiar with the design floor loads and
ensure that equipment and/or rows of file
cabinets or similar heavy loadings do not
exceed the designed capacity. When expertise
is not available in the department/agency,
requests for assistance in establishing floor
load capacities may be directed to the Project
Management Unit of the Division of Facilities
Management, Design and Construction.
(J) Floor and stair finishes. Floor and stair
finishes will be maintained in a safe condition. Selection of floor waxes should include
consideration for skid resistance and stairs
should have nonskid surfaces or strips. Tiles
on floors or stairs, stair nosing, nonskid surfaces, or strips will be maintained in a secure
uniform surface. In corridors, aisles or stairs,
loose, broken, or missing tile, stair nosing, or
nonskid materials will be considered as
imminent health and safety hazards and
scheduled for immediate correction.
(K). Equipment, controls and moving elements. Equipment with exposed moving elements or drives will be in enclosed and/or
locked spaces to prevent accidental contact by
personnel. High voltage, high amperage, and
high temperature equipment or controls will
be in locked cabinets and/or spaces with
access limited to authorized personnel. Main
electrical control equipment, main valves,
and other utility or equipment controls will
be in locked spaces with access limited to
authorized personnel.
(L) Storage of flammable materials and
gases. Storage for flammable materials and
gases will be limited to the minimum quantities, consistent with usage rates and available
delivery schedules. Since these materials are
especially hazardous to health, safety, and
property, they will be stored and handled
accordingly. Ventilated, secured storage
accessible only to authorized personnel will
comply with current codes, standards, and
Missouri Emergency Response Commission
(MERC) reporting requirements. The access
to and storage or use of these materials will
be carefully controlled in accordance with
current codes and standards.
(5) Security.
(A) General. Security standards indicated
in this section are minimal and apply to physical security of facilities. These standards do
not address requirements for security personnel or security requirements for functions or
activities of the facility occupants, since these
are operational responsibilities of the various
department/agencies.
(B) Locks and Access Control. The security of locks within a facility will be commensurate with the level of need for security of
the area or element being secured. All access
devices made for locking facilities or facility
equipment will be numbered and identified
(in records) with the locking device. Each
access device for a facility locking mechanism will be issued by number to a specific
individual, and the issue of all access devices
will be recorded in a control register. All personnel leaving employment at the facility
shall return all access devices issued for facility locking devices and the returns will be
recorded in the register. A periodic inquiry
will be made to determine the location of all
access devices for facility locking devices. If
an access device is missing, a determination
of need for changing the locks and issuing
new keys will be made.
(C) After Hours Access. After hours
access to every facility shall be limited to an
absolute minimum, consistent with requirements for accomplishing assigned functions
or tasks. This access shall be documented.
(D) Security Lighting. Security lighting
will be designed and used with consideration
for minimum effective light levels and energy
conservation. Controls for automatic turn-on
and turn-off should be considered in all security lighting.
(E) Coordination
with
Local
Law
Enforcement. Coordination will be established with local law enforcement agencies to
enhance the security of all state facilities.
Coordination will include providing names of
persons to be notified in case of emergency or
breach of physical security and a request for
surveillance and/or patrols of the area. Local
law enforcement authorities will be notified
of the presence and/or location of items needing a high degree of security and items that
may be likely targets for theft and vandalism.
Posted signs for notification in case of emergency will list only the telephone number of
the local law enforcement or security office.
The local law enforcement or security office
can then notify personnel who should
respond for an emergency. This notification
system avoids the danger of an employee
being forced to provide entry for unauthorized persons.
(F) Video Surveillance. The Division of
Facilities
Management,
Design
and
Construction and/or the Capitol Police currently use video surveillance in some state
facilities as a security measure, including the
Capitol Building, and may use video surveillance in other facilities, as determined to be
necessary.
(G) Metal detector and/or security guards.
The Division of Facilities Management,
Design and Construction and/or the Capitol
Police currently use metal detectors and security guards in some facilities for added security. Metal detectors and/or security guards
may be placed in additional facilities, as
determined to be necessary.
AUTHORITY: sections 8.320 and 8.360,
RSMo 2016 and subsections 6 and 7 of section 15, 1974 Reorganization Act.* Original
rule filed July 9, 1982, effective Nov. 15,
1982. Amended: Filed Nov. 30, 1993, effective July 10, 1994. Rescinded and readopted:
Filed Nov. 5, 2007, effective June 30, 2008.
Amended: Filed Nov. 30, 2018, effective July
30, 2019.
*Original authority: 8.320, RSMo 1958, amended 1965,
2014 and 8.360, RSMo 1958, amended 1965, 2014.