10 CSR 40-4.010
Coal Exploration Requirements
PURPOSE: This rule sets forth the requirements for conducting coal exploration activities pursuant to 444.810 and 444.845, RSMo.
Editor’s Note: The secretary of state has
determined that the publication of this rule in
its entirety would be unduly cumbersome or
expensive. The entire text of the material referenced has been filed with the secretary of
state. This material may be found at the
Office of the Secretary of State or at the headquarters of the agency and is available to any
interested person at a cost established by
state law.
(1) General Responsibility of Persons Conducting Coal Exploration. Each person who
conducts coal exploration shall obtain a permit, as required under 10 CSR 40-6.020, and
all operations which substantially disturb the
natural land surface regardless of how much
coal is removed shall comply with section (3)
of this rule.
(2) Required Documents. Each person who
conducts coal exploration which substantially
disturbs the natural land surface, while in the
exploration area, shall have available a copy
of the exploration permit for review by the
authorized representative of the director or
commission upon request.
(3) Performance Standards for Coal Exploration.
(A) Habitats of unique or unusually high
value for fish, wildlife and other related environmental values and critical habitats of
threatened or endangered species identified
pursuant to the Endangered Species Act of
1973 (16 U.S.C. 1531–1543) shall not be
disturbed during coal exploration.
(B) All roads or other transportation facilities used for coal exploration shall comply
with the applicable provisions of 10 CSR 403.140(1)–(23).
(C) If excavations, artificially flat areas or
embankments are created during exploration,
these areas shall be returned to the approximate original contour promptly after these
features are no longer needed for coal exploration.
(D) Topsoil shall be separately removed,
stored and redistributed on areas disturbed by
coal exploration activities as necessary to
assure successful revegetation or as required
by the director or commission.
(E) All areas disturbed by coal exploration
activities shall be revegetated in a manner
that encourages prompt revegetation and
recovery of a diverse, effective and permanent vegetative cover. Revegetation shall be
accomplished in accordance with the following:
1. All areas disturbed by coal exploration activities shall be seeded or planted to
the same seasonal variety native to the areas
disturbed. If the land use of the exploration
area is intensive agriculture, planting of the
crops normally grown will meet the requirements of this paragraph; and
2. The vegetative cover shall be capable
of stabilizing the soil surface from erosion.
(F) Diversions of overland flows and
ephemeral, perennial or intermittent streams
shall be made in accordance with 10 CSR 403.040(3) and (4).
(G) Each exploration hole, borehole, well
or other exposed underground opening created during exploration shall be reclaimed in
accordance with 10 CSR 40-3.020(1)–(3).
(H) All facilities and equipment shall be
promptly removed from the exploration area
when they are no longer needed for exploration, except for those facilities and equipment that the director or commission determines may remain to—
1. Provide additional environmental
data;
2. Reduce or control the on- and off-site
effects of the exploration activities; or
3. Facilitate future surface mining and
reclamation operations by the person conducting the exploration.
(I) Coal exploration shall be conducted in
a manner which minimizes disturbance of the
prevailing hydrologic balance in accordance
with 10 CSR 40-3.040(1)–(3), (5)–(7) and
(9)–(12). The director or commission may
specify additional measures which shall be
adopted by the person engaged in coal exploration.
(J) Acid- or toxic-forming materials shall
be handled and disposed of in accordance
with 10 CSR 40-3.040(1) and (9) and 10 CSR
40-3.080. The director or commission may
specify additional measures which shall be
adopted by the person engaged in coal exploration.
AUTHORITY: section 444.530, RSMo Supp.
1999.* Original rule filed Oct. 12, 1979,
effective Feb. 11, 1980. Rescinded and readopted: Filed Aug. 4, 1987, effective Nov. 23,
1987. Amended: Filed May 15, 1992, effective Jan. 15, 1993. Amended: Filed March
21, 2000, effective Oct. 30, 2000.
*Original authority: 444.530, RSMo 1971, amended 1983,
1990, 1993, 1995.