10 CSR 45-8.030
Metallic Minerals Waste Management Structures
PURPOSE: This rule provides guidelines
regarding the integrity, design, construction
and maintenance of metallic mineral waste
management structures including, but not
limited to, tailings dams and slag waste piles.
This rule includes dams less than thirty-five
feet in height not regulated under the Missouri Dam Safety Act, sections 236.400—
236.500, RSMo (1986).
(1) For dams located in metallic minerals
waste management areas that are constructed
after the effective date of this regulation and
are less than thirty-five feet (35') in height,
the operator shall certify using standards that
are currently acceptable and available to the
engineering profession that the structures
meet the requirements for spillway capacity,
slope stability, correction of observable
defects, maintenance, and inspection in order
to ensure the continued integrity of the structure.
(2) For dams located in metallic minerals
waste management areas that were constructed before the effective date of this regulation
and are less than thirty-five feet (35') in
height, the operator shall certify using standards that are currently acceptable and available to the engineering profession that the
structures meet the requirements for spillway
capacity, correction of observable defects,
and maintenance and inspection.
(3) Sloped faces of slag waste piles or other
waste management control structures shall be
maintained according to the lines and gradients shown on the approved permit application. Any slope failures, as evidenced by
scarp formation, sloughing, bulging, or other
indications, shall be reported to the director
in writing within ten (10) days of the time
when the failure is first noticed. Upon review
of the failure, the director will determine
what corrective action is to be taken. Corrective action may include repair and stabilization of the failed area.
(4) Sloped faces that experience erosion shall
be repaired by the operator on an on-going
basis. The operator shall keep a record of all
these repairs and make these records available
to the director upon request. No repairs shall
be made that would result in significant
deviances from the lines and grades shown on
the approved permit application without written approval of these repairs by the director.
Areas that experience recurring erosion may
require special erosion control measures,
such as application of revetment materials,
regrading, and so forth. The director and
operator will determine the need for these
measures during the review of the closure
plan. The operator shall prepare plans and
specifications for measures in accordance
with practices reputable and appropriate in
the engineering, geologic, and construction
professions. A copy of these plans and specifications will be provided to the director for
review. The operator shall not begin construction of erosion control measures without
written approval of that work from the director.
(5) The operator shall provide a judgment of
the effect of subsidence and earthquake loads
on the long-term stability and integrity of all
tailings dams, slag piles, and other waste
management control structures located within
the boundary of the waste management area.
The judgment shall be based upon engineering analysis and experience in accordance
with practices reputable and in current use in
the engineering and geologic professions.
The operator and director shall determine the
need for remedial measures to counteract the
effects of potential subsidence.
AUTHORITY: sections 444.362 and 444.380,
RSMo 2016.* Original rule filed Oct. 2,
1990, effective April 29, 1991. Amended:
Filed March 26, 2018, effective Nov. 30,
2018.
*Original authority: 444.362, RSMo 1989 and 444.380,
RSMo 1989, amended 1993, 1995.