10 CSR 50-2.040
Drilling and Completion
PURPOSE: One of the important functions of
the council is to prevent the contamination of
the waters of the state. In Missouri, an underground source of drinking water may occur
either above or below an oil and gas reservoir.
This groundwater is commonly the only source
of water for irrigation and animal and human
consumption. This rule provides procedures
for protecting all waters of the state and to
create acceptable safety standards for wells
and surface installations. Plugging of wells
when they are abandoned is consistent with a
statewide effort to prevent contamination of
waters of the state and additionally is important in areas proven to be productive using
enhanced recovery methods.
(1) During the drilling of any well, surface
casing shall be set as follows, except as otherwise required or approved by the state geologist as indicated on the approved permit to
drill, deepen, plug-back, or recomplete:
(A) Through all unconsolidated material
plus twenty feet (20') into the underlying
competent bedrock; or
(B) In areas where underground sources of
drinking water are present above the production or injection zone(s), at a point at least
fifty feet (50') below the base of the deepest
known underground source of drinking water
penetrated.
(2) All casing materials shall be steel or other
material of equal or greater strength approved
by the state geologist and able to withstand
collapse and burst pressures that the well
might encounter.
(3) All wells drilled shall be completed with
tubing, packer, and a string(s) of casing
which are properly cemented at sufficient
depths to protect all water, oil, or gas bearing
strata and prevents their contents from passing into other strata. For wells drilled to producing strata at a depth of no greater than one
thousand five hundred feet (1500'), an operator may set a single casing string with no
tubing or packer, if the well is cemented from
the bottom of the casing to the surface to seal
off and protect any underground source of
drinking water. The state geologist may
approve other methods of cementing casing in
a well.
(4) Cement shall, except as otherwise modified or approved by the state geologist—
(A) Be used in setting all casing or sealing
off producing strata, underground porosity
gas storage strata, or underground sources of
drinking water;
(B) Be installed from the bottom to the top
of the casing in one (1) continuous operation
using pressure grouting techniques;
(C) Be placed in a minimum one inch (1")
annulus between strings of casing or the casing and borehole;
(D) Be maintained at surface level; and
(E) Be in place for at least eight (8) hours
and reach a compressive strength of three
hundred (300) pounds per square inch before
the bottom plug is drilled or before tests are
initiated, and before further operations begin.
(5) Multiple-completed wells. Operators may
produce from more than one (1) pool through
the same wellbore if separation of each pool
is maintained and after application to, and
approval by, the state geologist. Multiplecompleted injection and production wells
may be permitted if, in addition to the
requirements above, all of the following conditions are met:
(A) Any offsetting production will not be
adversely affected;
(B) Underground sources of drinking water
will not be endangered;
(C) The well is continuously cemented
across the injection and producing intervals;
and
(D) The well demonstrates mechanical
integrity.
(6) The state geologist may require specific
casing and cementing requirements for injection wells based on the following:
(A) The depth of the underground source(s)
of drinking water;
(B) The nature of the injected fluids; or
(C) The hydraulic relationship between the
injection zone and the underground source(s)
of drinking water.
(7) Each operator of a permitted injection
well shall comply with the following requirements:
(A) Equip the wellhead with a pressure
observation valve and maintain equipment
necessary to obtain injection pressure measurements upon inspection by an authorized
representative(s) of the state geologist. For
injection wells completed prior to March 30,
2016, add the pressure observation valve
prior to testing for mechanical integrity, or
upon request of the state geologist;
(B) Tubing and packer requirements.
1. Each well permitted shall meet one
(1) of the following requirements:
A. Equip the well to inject through
tubing below a packer;
B. Set a packer run on the tubing in
casing opposite a cemented interval at a point
immediately above the uppermost perforation
or openhole interval. Fill the annulus
between the tubing and the casing with a corrosion-inhibiting fluid or hydrocarbon liquid.
All wells using wellhead pressure to inject
fluids must follow the tubing and packer
requirements set in this subparagraph; or
C. Construct a packerless or tubingless completion for injection wells drilled to
no greater than one thousand five hundred
feet (1500') pursuant to paragraph (7)(B)2. or
3. of this regulation.
2. Injection through tubing without a
packer is authorized if all of the following
requirements are met:
A. Run the tubing to a depth not shallower than forty feet (40') above the uppermost perforation or open hole of the injection
interval;
B. Equip each wellhead with a pressure observation valve on the tubing and the
tubing-casing annulus; and
C. Maintain the well so that the
mechanical integrity tests can be performed
as specified in 10 CSR 50-2.055(12).
3. Injection without tubing is authorized
if all of the following requirements are continuously met during the life of the well:
A. The casing is cemented continuously from setting depth to surface;
B. Surface wellhead injection pressure
is recorded monthly and kept by the operator
for five (5) years;
C. All pressure readings recorded are
taken during actual injection operations; and
D. The operator of the tubingless
completion maintains the well so that the
mechanical integrity tests can be performed
as specified in 10 CSR 50-2.055(12).
(8) In existing wells to be converted to other
use, including but not limited to injection, all
additional casing or recompletion shall be
constructed as specified in sections (1)
through (7).
(9) All points at which a well is in physical
contact with a pool shall meet all minimum
distance requirements as specified in 10 CSR
50. For horizontal wells, submit a directional
survey with the well completion or recompletion report to verify points at which the well
is in contact with the pool.
(10) Any well not constructed in compliance
with requirements of this regulation shall be
shut in, according to 10 CSR 50-2.060 until
compliance is achieved.
(11) All stratigraphic test wells that are not
converted to another type of well must be
permanently plugged according to 10 CSR
50-2.060(3) within ninety (90) calendar days
of the spud date. A single thirty (30) calendar
day extension period may be granted upon
written request to the state geologist. If conversion is to take place, submit a permit modification to the state geologist as detailed in
10 CSR 50-2.030(9) or 10 CSR 50-2.060(4)
prior to conversion. The well will then be
subject to all completion and location
requirements for the type of well to which it
is being converted.
(12) Permanent signage must be posted within ninety (90) calendar days of spud date at
each well site indicating the well name, well
number, and API number. Stratigraphic test
wells and non-commercial gas wells are
exempt from signage posting.
AUTHORITY: section 259.070, RSMo 2016.*
Original rule filed Oct. 11, 1966, effective
Oct. 21, 1966. Amended: Filed Sept. 12,
1973, effective Sept. 22, 1973. Amended:
Filed Oct. 14, 1981, effective Feb. 11, 1982.
Amended: Filed Aug. 11, 1986, effective Oct.
27, 1986. Amended: Filed Sept. 16, 2015,
effective March 30, 2016. Amended: Filed
June 27, 2018, effective Feb. 28, 2019.
*Original authority: 259.070, RSMo 1965, amended 1972,
1983, 1987, 1993, 1995, 2012, 2015.