10 CSR 50-2.100
Enhanced Recovery Projects
PURPOSE: Enhanced recovery projects utilize fluids, including but not limited to, produced water, steam, or natural gas, by injection into an oil reservoir to recover additional oil. Where the oil is difficult to recover
with water or steam, certain chemicals are
often added to increase the efficiency of water
as an oil-recovery agent. These enhanced
recovery methods help maintain reservoir
pressure and increase the ultimate amount of
oil that can be obtained from a particular
pool, thereby preventing the waste of natural
resources. This rule provides for the protection of groundwater by requiring approval by
the state geologist of certain details of the
enhanced recovery project. In addition, this
rule protects the correlative rights of the offset property owners by requiring the state
geologist’s approval of well spacing and production unit line requirements prior to the
commencement of operations.
Enhanced recovery projects designed for the
secondary or tertiary recovery of oil or gas
may be approved as part of a proposed production unit. Production unit approval may be
requested by submitting to the state geologist
an application specifying all pertinent details
of the proposed project as detailed in 10 CSR
50-3.020(2).
AUTHORITY: section 259.070, RSMo Supp.
2015.* Original rule filed Oct. 11, 1966,
effective Oct. 21, 1966. Amended: Filed Sept.
12, 1973, effective Sept. 22, 1973. Amended:
Filed Sept. 15, 2015, effective March 30,
2016.
*Original authority: 259.070, RSMo 1965, amended 1972,
1983, 1987, 1993, 1995, 2012, 2015.