10 CSR 60-10.010
Plans and Specifications
PURPOSE: This rule sets forth requirements for submission, review
and approval of engineering reports, plans and specifications for
community water supply planning and construction.
(1) Report Required. When plans are being made by a supplier
of water to a community water system or subdivision for constructing expansions, modifications, and improvements of the
water supply source, water treatment facility, or for the development of a new community water system or subdivision, the
supplier of water shall submit an engineer-prepared report to
the department for review and approval. Upon receipt of an
engineering report, the department will evaluate the report
and either approve the report in writing or outline the requirements for further investigation.
(A) Written approval of the engineering report shall be obtained before construction plans and specifications are finalized, unless otherwise approved by the department.
(B) Engineering reports need not be submitted to the department for facilities constructed under a supervised program.
(C) If the original approved report is more than two (2) years
old, an updated engineering report must be submitted before
final plans and specifications will be reviewed or as deemed
necessary by the department.
(2) Plans and Specifications Required.
(A) Construction Permit Authorization.
1. Every supplier of water to a community water supply
or a water system serving a subdivision must submit to the
department, plans and specifications prepared by an engineer
for review and issuance of a written approval to construct prior
to initiating construction ofโ
A. A new water treatment facility(ies), new water supply
source(s), and/or a new distribution system; and
B. Expansions or modifications of existing water treatment facilities which would significantly change or alter plant
capacity or treatment processes, modification of an existing
water supply source which might reasonably result in significant change in the quality or quantity of water originally
approved for the source, or expansion or modification of water
distribution systems unless a supervised program of design,
construction, and construction supervision is maintained by
the supplier of water.
2. The department will review plans and specifications,
advise the supplier of water and his/her engineer of the review
findings, and outline additional information or changes necessary for approval.
3. The department may approve the plans and specifications by issuance of a written approval to construct which will
describe the facilities to be constructed along with any comments or conditions of approval.
(B) Owner Supervised Program.
1. A supplier of water to a community water supply that
desires to conduct a supervised program for construction of
water distribution systems, in lieu of submitting plans for approval, must submit to the department a written request for
approval.
2. Approval of supervised programs may be granted for
a period of up to five (5) years. Supervised programs will be
periodically reviewed by the department and may be revoked
should the supplier of water fail to conduct the program in
accordance with the approved plan.
3. Upon revocation of a supervised program, engineering
plans and specifications must be submitted to the department
for review and issuance of a written approval to construct.
4. A modification(s) to an approved supervised program
may be made by written request to the department.
5. A supervised program shall provide the following minimum elements:
A. Sizing water mains and appurtenances with minimum four-inch (4") diameters so that a minimum pressure of
twenty pounds per square inch (20 psi) is maintained under
normal flow conditions. Requests for approval to install lesser
diameter water mains may be granted by the department
upon submission of standard design data, including a hydraulic analysis;
B. Maintenance of permanent records and drawings
for review by the department, of the entire water distribution
network including all appurtenances to the network, such as
valves, hydrants, and cleanouts, along with plans and specifications of projects under construction;
C. Protection of water mains during construction from
sources of contamination byโ
(I) Maintaining at least a ten-foot (10') horizontal separation of water mains from any existing or proposed sanitary
sewer, force main, or storm sewer. The distance must be measured edge-to-edge. Installation of the water main closer to a
sanitary sewer is acceptable where the water main is laid in a
separate trench or on an undisturbed earth shelf located on
one (1) side of the sanitary sewer at an elevation so the bottom
of the water main is at least eighteen inches (18") above the top
of the sanitary sewer;
(II) Providing a minimum vertical distance of eighteen inches (18") between the outside of the water main and
the outside of the sanitary sewer, force main, or storm sewer
where water mains cross sanitary sewer mains, force mains, or
storm sewers. This shall be the case where the water main is
either above or below the sanitary sewer, force main, or storm
sewer. At crossings, one (1) full length of water pipe must be
located so both joints will be as far from the sanitary sewer,
force main, or storm sewer line as possible. Special structural
support for the water and sanitary sewer, force main, or storm
sewer pipes may be required;
(III) Locating water mains so that they do not pass
through or come in contact with any sanitary sewer manhole;
and
(IV) Consulting with the department as to the precautions necessary where the conditions in parts (2)(B)5.C.(I)โ(IV)
cannot be met.
(3) If construction has not commenced within two (2) years
after the date of issue or there is a halt in construction of more
than two (2) years, the approval to construct will be void unless
an extension of time has been granted by the department.
(4) All construction work must conform to approved plans and
specifications.
(A) Should it be necessary or desirable to make a material
change in the approved design which will affect water quality,
capacity, and sanitary features or performance, revised plans
and specifications, together with a written statement of the
reasons for the change, must be submitted to the department
for review and approval must be obtained in writing before the
work affected by the change is undertaken.
RESOURCES
(B) Minor revisions not affecting water quality, capacity, flow,
sanitary features or performance will be permitted during
construction without further approval; provided, as-built plans
documenting these changes are submitted to the department.
(5) Final Approval of Construction.
(A) A final inspection completed by the department or certified by an engineer with the approval of the department.
(B) Construction conformance with the approved plans and
specifications and any changes documented by the submission
of two (2) copies of as-built plans with the affixed seal of the
engineer.
(C) A supplier of water having an approved supervised program for construction does not need additional approval of
construction for work completed under that program.
(6) The department will review engineering reports, engineering plans and specifications, requests for approval of supervised water main extension programs, and carry out inspections required for final approval of construction within thirty
(30) working days of receipt of request. Review time is subject
to emergency conditions, manpower availability or other factors beyond department control.
(7) Essential portions of copies of engineering documents will
be kept on file by the department.
AUTHORITY: section 640.100, RSMo 2016.* Original rule filed May
4, 1979, effective Sept. 14, 1979. Amended: Filed April 14, 1981, effective Oct. 11, 1981. Amended: Filed April 13, 2018, effective Dec.
30, 2018.
*Original authority: 640.100, RSMo 1939, amended 1978, 1981, 1982, 1988, 1989, 1992,
1993, 1995, 1996, 1998, 1999, 2002, 2006, 2012, 2014.