10 CSR 60-4.080
Operational Monitoring
PURPOSE: This rule establishes criteria for
operation and operational monitoring.
PUBLISHER’S NOTE: The secretary of state
has determined that the publication of the
entire text of the material which is incorporated by reference as a portion of this rule
would be unduly cumbersome or expensive. This material as incorporated by reference in this rule shall be maintained by the
agency at its headquarters and shall be made
available to the public for inspection and
copying at no more than the actual cost of
reproduction. This note applies only to the
reference material. The entire text of the rule
is printed here.
(1) Public water systems utilizing any treatment process must perform sufficient analyses to maintain control of the treatment process, using methods as required by 10 CSR
60-5.010 and as acceptable to the department.
(2) Automatic instrumentation may be used if
properly installed, maintained and periodically
calibrated against known standards prepared
in accordance with Standard Methods for the
Examination of Water and Wastewater 1992,
18th edition, or Methods for Chemical
Analysis of Water and Wastes, published in
March 1983 by the Environmental Protection
Agency’s
(MCAWW,
Section
9.3,
EPA/600/479/020, Cincinnati, OH). This
document is incorporated by reference without any later amendments or modifications.
To obtain a copy, contact the U.S.
Government Printing Office at 732 North
Capitol Street NW, Washington, D.C.,
20401, toll free at (866)512-1800 or by visiting https://bookstore.gpo.gov.
(3) Sufficient analyses must be done to assure
control of water quality, the following
requirements notwithstanding. Continuous
monitoring and recording may be used for
any operational analysis instead of grab sampling provided that the requirements of section (2) are met. For those analyses where
continuous monitoring is required, if there is
a failure in the continuous monitoring equipment, grab sampling every four (4) hours of
operation may be conducted in lieu of continuous monitoring but for no more than five (5)
working days following the failure of the
equipment. Applicable analyses and testing
frequencies are as follows:
7HVW
)UHTXHQF\
6DPSOH
/RFDWLRQ
7UHDWPHQW
7UHDWPHQW
7UHDWPHQW
7UHDWPHQW
$ONDOLQLW\
$VQHFHVVDU\IRU
FRQWURO
5DZ:DWHU
&ODULILFDWLRQ
/LPH6RIWHQLQJ
$ONDOLQLW\
$VQHFHVVDU\IRU
FRQWURO
(QWU\WR
GLVWULEXWLRQ
V\VWHP
&ODULILFDWLRQ
/LPH6RIWHQLQJ
'LVLQIHFWLRQ
UHVLGXDO
&RQWLQXRXV
(QWU\WR
GLVWULEXWLRQ
V\VWHP
'LVLQIHFWLRQ
UHVLGXDO
'DLO\
(QWU\WR
GLVWULEXWLRQ
V\VWHP
'LVLQIHFWLRQ
UHVLGXDO
$WWLPHRIWRWDO
FROLIRUP
VDPSOLQJ
7RWDOFROLIRUP
VDPSOLQJSRLQWV
'LVLQIHFWLRQ
UHVLGXDO
0RQGD\)ULGD\
H[FOXGLQJIHGHUDO
KROLGD\VDQG
GD\VQRWVHUYLQJ
ZDWHUWRWKH
SXEOLF
(QWU\WR
GLVWULEXWLRQ
V\VWHP
'LVLQIHFWLRQ
UHVLGXDO
6WDUWXSDQG
HYHU\KRXUVRI
RSHUDWLRQ
)LOWHULQIOXHQW
DQGHIIOXHQW
&ODULILFDWLRQ
/LPHVRIWHQLQJ
)OXRULGHLI
FRPSRXQGV
DGGHG
'DLO\
(QWU\WR
GLVWULEXWLRQ
V\VWHP
)OXRULGH
DGMXVWPHQW
)OXRULGHLI
FRPSRXQGV
DGGHG
4XDUWHUO\
5HSUHVHQWDWLYH
SRLQWLQ
GLVWULEXWLRQ
V\VWHP
)OXRULGH
DGMXVWPHQW
+DUGQHVV
0RQGD\)ULGD\
H[FOXGLQJIHGHUDO
KROLGD\VDQG
GD\VQRWVHUYLQJ
ZDWHUWRWKH
SXEOLF
(QWU\WR
GLVWULEXWLRQ
V\VWHP
,RQ([FKDQJH
VRIWHQLQJ
+DUGQHVV
'DLO\
(QWU\WR
GLVWULEXWLRQ
V\VWHP
&ODULILFDWLRQ
/LPH6RIWHQLQJ
+DUGQHVV
$VQHFHVVDU\IRU
FRQWURO
,RQ([FKDQJH
VRIWHQLQJ
,URQ
$VQHFHVVDU\IRU
FRQWURO
)LOWHULQIOXHQW
DQGHIIOXHQW
,URQUHPRYDO
&ODULILFDWLRQ
/LPHVRIWHQLQJ
S+
$VQHFHVVDU\IRU
FRQWURO
(QWU\WR
GLVWULEXWLRQ
V\VWHP
,URQUHPRYDO
&ODULILFDWLRQ
/LPHVRIWHQLQJ
S+
$VQHFHVVDU\IRU
FRQWURO
5DZZDWHU
&ODULILFDWLRQ
S+
$VQHFHVVDU\IRU
FRQWURO
)LOWHUHIIOXHQW
,URQUHPRYDO
S+
$VQHFHVVDU\IRU
FRQWURO
3ULPDU\DQG
VHFRQGDU\
EDVLQV
/LPHVRIWHQLQJ
S+
$VQHFHVVDU\IRU
FRQWURO
(QWU\WR
GLVWULEXWLRQ
V\VWHP
3KRVSKDWH
$VQHFHVVDU\IRU
FRQWURO
'RZQVWUHDP
IURPSRLQWRI
DSSOLFDWLRQ
6OXGJH
&RQFHQWUDWLRQ
$VQHFHVVDU\IRU
FRQWURO
&HQWHUFRQHDQG
VOXGJHEORZRII
DQGVDPSOHWDSV
&ODULILFDWLRQ
/LPHVRIWHQLQJ
7HPSHUDWXUH
$VQHFHVVDU\IRU
FRQWURO
(QWU\WR
GLVWULEXWLRQ
V\VWHP
'LVLQIHFWLRQ
,URQUHPRYDO
&ODULILFDWLRQ
/LPH
VRIWHQLQJ
7XUELGLW\
(YHU\IRXU
KRXUV
&RPELQHGILOWHU
HIIOXHQW
7XUELGLW\
FRQWLQXRXVO\
,QGLYLGXDOILOWHU
HIIOXHQW
7XUELGLW\
$VQHFHVVDU\IRU
FRQWURO
(QWU\SRLQWWR
GLVWULEXWLRQDQG
ILOWHULQIOXHQW
,URQUHPRYDO
&ODULILFDWLRQ
/LPHVRIWHQLQJ
6XUIDFHZDWHUDQG*URXQGZDWHUXQGHUWKH'LUHFWLQIOXHQFHRIVXUIDFHZDWHUDQGFRPSOLDQFHPRQLWRULQJV\VWHPVXQGHU
&65VHUYLQJ!SRSXODWLRQ
6XUIDFHZDWHUJURXQGZDWHUXQGHUWKHGLUHFWLQIOXHQFHRIVXUIDFHZDWHUDQGFRPSOLDQFHPRQLWRULQJV\VWHPVXQGHU
&65VHUYLQJSRSXODWLRQ/LPHVRIWHQLQJLURQUHPRYDODQGV\VWHPVGLUHFWHGE\DFRPSOLDQFH
DJUHHPHQWWRGLVLQIHFW
$OOSXEOLFZDWHUV\VWHPVWKDWDGGDFKORULQHGLVLQIHFWDQWRUWKDWGHOLYHUZDWHUWKDWKDVDFKORULQHGLVLQIHFWDQW
6\VWHPVQRWUHTXLUHGWRGLVLQIHFW7KLVH[FOXGHV6XUIDFHZDWHU*URXQGZDWHUXQGHUWKHGLUHFWLQIOXHQFHRIVXUIDFH
ZDWHUFRPSOLDQFHPRQLWRULQJV\VWHPVXQGHU&65OLPHVRIWHQLQJLURQUHPRYDODQGV\VWHPVGLUHFWHGE\
DFRPSOLDQFHDJUHHPHQWWRGLVLQIHFW$QDOWHUQDWHIUHTXHQF\PD\EHDJUHHGXSRQLQZULWLQJE\WKHZDWHUV\VWHPDQG
WKHGHSDUWPHQWLIZDUUDQWHG
,ILRQH[FKDQJHVRIWHQLQJLVUHTXLUHGRIZDWHUV\VWHPWRPHHWQDWLRQDOSULPDU\GULQNLQJZDWHUVWDQGDUGVLHOHDG
UDGLRQXFOLGHV
,ISKRVSKDWHFRPSRXQGVDUHDGGHGWRWKHZDWHU
6XUIDFHZDWHUDQG*URXQGZDWHUXQGHUWKH'LUHFWLQIOXHQFHRIVXUIDFHZDWHUDQGFRPSOLDQFHPRQLWRULQJV\VWHPVXQGHU
&65
6XUIDFHZDWHUDQG*URXQGZDWHUXQGHUWKH'LUHFWLQIOXHQFHRIVXUIDFHZDWHU
)RUIDFLOLWLHVXWLOL]LQJVROLGVFRQWDFWEDVLQV
(4) If, after investigation, the department
finds that any public water system is incompetently supervised, improperly operated,
inadequate, of defective design or if the water
fails to meet standards established in these
rules, the water supplier must implement
changes that may be required by the department.
(5) Every supplier of water to a public water
system must disinfect all newly constructed
or repaired water distribution mains, finished
water storage facilities or wells by methods
acceptable to the department before being
placed in or returned to service.
(6) All finished water reservoirs must be covered by a permanent, protective material,
adequately vented with properly screened
openings.
(7) Chemicals, materials and protective coatings used in public water systems must be
acceptable to the department.
(8) Public water systems must maintain a
minimum positive pressure of twenty pounds
per square inch (20 psi) throughout the distribution system under all normal operating
conditions.
(9) A supplier of water that adds fluoride to
the water system must submit one (1) sample
per quarter for analyses to an approved laboratory.
AUTHORITY: section 640.100, RSMo 2016.*
Original rule filed May 4, 1979, effective
Sept. 14, 1979. Amended: Filed April 14,
1981, effective Oct. 11, 1981. Amended: Filed
July 12, 1991, effective Feb. 6, 1992.
Amended: Filed Feb. 1, 1996, effective Oct.
30, 1996. Amended: Filed June 13, 2018,
effective Feb. 28, 2019.
*Original authority: 640.100, RSMo 1939, amended 1978,
1981, 1982, 1988, 1989, 1992, 1993, 1995, 1996, 1998,
1999, 2002, 2006, 2012, 2014.