20 CSR 4240-20.093
Demand-Side Programs Investment Mechanisms
PURPOSE: This rule allows the establishment and operation of
Demand-Side Programs Investment Mechanisms (DSIM), which
allow periodic rate adjustments related to recovery of costs and
utility incentives for investments in demand-side programs.
(1) The definitions of terms used in this section can be found
in 4 CSR 240-20.092 Definitions for Demand-Side Programs and
Demand-Side Programs Investment Mechanisms.
(2) Applications to establish, continue, or modify a DemandSide Programs Investment Mechanism (DSIM). Pursuant to the
provisions of this rule, 4 CSR 240-2.060, and section 393.1075,
RSMo, an electric utility shall file an application with the commission to establish, continue, or modify a DSIM in a utility’s
filing for demand-side program approval.
(A) An application to establish a DSIM shall include the following supporting information as part of, or in addition to, its
direct testimony. Supporting workpapers shall be submitted
with all models and spreadsheets provided as executable versions in native format with all links and formulas intact.
1. The notice provided to customers describing how the
proposed DSIM will work, how any proposed DSIM rate will be
determined, and how any DSIM rate will appear on customers’
bills;
2. An example customer bill showing how the proposed
DSIM shall be separately identified on affected customers’ bills;
3. A complete, reasonably detailed, description and explanation of the design, rationale, and intended operation of the
proposed DSIM;
4. Estimates of the effect of the DSIM and all other impacts
of the demand-side program spending, in aggregate, on customer rates and average bills for each of the next five (5) years,
and as a net present value of net benefits over the lifetime of
the demand-side program impacts, for each rate class;
5. Estimates of the effect of the DSIM on earnings and key
credit metrics for each of the next three (3) years including the
level of earnings and key credit metrics expected to occur for
each of the next three (3) years with and without the DSIM;
6. A complete, reasonably detailed, explanation of all the
costs that shall be considered for recovery under the proposed
DSIM and the specific account used for each cost item on the
electric utility’s books and records;
7. A complete, reasonably detailed, explanation of any
change in business risk to the electric utility resulting from implementation of a DSIM in setting the electric utility’s allowed
return on equity, in addition to any other changes in business
risk experienced by the electric utility;
8. A proposal for how the commission can determine if
the DSIM is aligned with helping customers use energy more
efficiently;
9. If the utility proposes to adjust its DSIM rates between
general rate proceedings, proposed DSIM rate adjustment
clause tariff sheets; and
10. If the utility proposes to adjust the DSIM amount between general rate proceedings, a complete, reasonably detailed, explanation of how the DSIM rates shall be established
and how they will be adjusted for any over- and/or under-recovery amounts, as well as the impact on the DSIM amount as
a result of, established, modified, or discontinued demand-side
programs.
(B) If an electric utility files to modify its approved DSIM,
the electric utility shall file with the commission and serve
upon parties, as provided in section (15) below, the following
supporting information as part of, or in addition to, direct
testimony. Supporting workpapers shall be submitted with all
models and spreadsheets provided as executable versions in
native format with all links and formulas intact;
1. Information as required by subsection (2)(A), above;
2. Explanation of any proposed modification to the DSIM
and why the proposed modification is being requested;
3. A complete, reasonably detailed, explanation of any
change in business risk to the electric utility resulting from
modification of a DSIM in setting the electric utility’s allowed
return on equity, in addition to any other changes in business
risk experienced by the electric utility; and
4. Any additional information the commission orders to
be provided.
(C) Any party to the application for a utility’s filing for
demand-side program approval may support or oppose the
establishment, continuation, or modification of a DSIM and/
or may propose an alternative DSIM for the commission’s consideration including, but not limited to, modifications to any
electric utility’s proposed DSIM.
(D) The commission shall approve the establishment, continuation, or modification of a DSIM and associated tariff sheets
if it finds the electric utility’s approved demand-side programs
are expected to result in energy and demand savings and are
beneficial to all customers in the customer class in which the
programs are proposed, regardless of whether the programs
are utilized by all customers and will assist the commission’s
efforts to implement state policy contained in section 393.1075,
RSMo, to—
1. Provide the electric utility with timely recovery of all
reasonable and prudent costs of delivering cost-effective demand-side programs;
2. Ensure that utility financial incentives are aligned with
helping customers use energy more efficiently and in a manner that sustains or enhances utility customers’ incentives to
use energy more efficiently; and
3. Provide timely earnings opportunities associated with
cost-effective measurable and/or verifiable energy and demand
savings;
(E) In addition to any other changes in business risk experienced by the electric utility, the commission shall consider
changes in the utility’s business risk resulting from establishment, continuation, or modification of the DSIM in setting
the electric utility’s allowed return on equity in general rate
proceedings.
(F) In determining to approve a request to establish, modify,
or continue a DSIM, the commission may consider, but is not
limited to only considering, the expected magnitude of the
impact of the utility’s approved demand-side programs on the
utility’s costs, revenues, and earnings, the ability of the utility
to manage all aspects of the approved demand-side programs,
the ability to measure and verify the approved demand-side
programs’ impacts, any interaction among the various components of the DSIM that the utility may propose, and the
incentives or disincentives provided to the utility as a result of
the inclusion or exclusion of DSIM components as defined in
4 CSR 240-20.092(N). In this context the word “disincentives”
means any barrier to the implementation of a DSIM. There is
no penalty authorized in this section.
(G) Any cost recovery component of a DSIM shall be based on
costs of demand-side programs approved by the commission
in accordance with 4 CSR 240-20.094 Demand-Side Programs.
Indirect costs associated with demand-side programs, including but not limited to, costs of evaluation, measurement,
and verification (EM&V), and/or utility’s portion of statewide
technical reference manual, shall be allocated to demand-side
programs and thus shall be eligible for recovery through an
approved DSIM. The commission shall approve any cost recovery component of a DSIM simultaneously with the programs
approved in accordance with 4 CSR 240-20.094 Demand-Side
Programs.
(H) Any throughput disincentive component of DSIM shall
be based on energy or energy and demand savings from utility demand-side programs approved by the commission in
accordance with 4 CSR 240-20.094 Demand-Side Programs and
will be determined as a result of energy and demand savings
determined through EM&V.
1. The commission shall order any throughput disincentive
component of a DSIM simultaneously with the demand-side
programs approved in accordance with 4 CSR 240-20.094
Demand-Side Programs.
2. In a utility’s filing in which a throughput disincentive
component of a DSIM is considered, there is no requirement
for any implicit or explicit utility throughput disincentive
component of a DSIM or for a particular form of a throughput
disincentive component of a DSIM.
3. Any explicit throughput disincentive component of a
DSIM shall be implemented on a prospective basis.
(I) Any earnings opportunity component of a DSIM shall be
based on the performance of demand-side programs approved
by the commission in accordance with 4 CSR 240-20.094
Demand-Side Programs and shall include a methodology for
determining the utility’s earnings opportunity amount for
individual demand-side programs based upon program performance relative to commission-approved performance metrics
for each demand-side program.
1. Energy and demand savings targets approved by the
commission for use in the earnings opportunity component
of a DSIM are not necessarily the same as the incremental
energy and demand savings goals and cumulative energy and
demand savings goals specified in 4 CSR 240-20.094(2).
2. The commission shall order any earnings opportunity
component of a DSIM simultaneously with the approval of the
demand-side programs in accordance with 4 CSR 240-20.094
Demand-Side Programs.
3. Any earnings opportunity component of a DSIM shall be
implemented on a retrospective basis and all energy and demand savings used to determine a DSIM earnings opportunity
amount must be measured and verified through EM&V.
(J) If the DSIM proposed by the utility includes adjustments
to DSIM rates between general rate proceedings, the DSIM
shall include a provision to adjust the DSIM rates not less than
annually to include a true-up for over- and under-recovery of
the DSIM amount as well as the impact on the DSIM amount
as a result of approved new, modified, or discontinued demand-side programs.
(K) If the commission approves an earnings opportunity
component of a DSIM, such earnings opportunity component
shall be binding on the commission for the entire term of the
DSIM, and such DSIM shall be binding on the electric utility for
the entire term of the DSIM, unless otherwise ordered or conditioned by the commission when approved.
(L) The commission shall apportion the DSIM amount to each
customer class.
(3) Application for Discontinuation of a DSIM. The commission
shall allow or require a DSIM to be discontinued or any component of a DSIM to be discontinued only after providing the
opportunity for a hearing.
(A) When submitting an application to discontinue a DSIM,
the electric utility shall file with the commission and serve
on parties as provided in section (15), the following supporting information as part of, or in addition to, direct testimony.
Supporting workpapers shall be submitted with all models and
spreadsheets provided as executable versions in native format
with all links and formulas intact:
1. An example of the notice to be provided to customers;
2. If the utility’s DSIM allows adjustments of the DSIM rates
between general rate proceedings, a complete, reasonably detailed, explanation of how the over-/under-recovery of the DSIM
amount that the electric utility is proposing to discontinue
shall be handled;
3. A complete, reasonably detailed, explanation of why
the DSIM is no longer necessary to provide the electric utility
a sufficient opportunity to recover demand-side programs
costs, throughput disincentive, and/or to receive an earnings
opportunity;
4. A complete, reasonably detailed, explanation of any
change in business risk to the electric utility resulting from
discontinuation of the DSIM in setting the electric utility’s
allowed return on equity, in addition to any other changes in
business risk experienced by the electric utility; and
5. Any additional information the commission orders to
be provided.
(B) Any party to the utility’s filing for demand-side program
approval may oppose the discontinuation of a DSIM or any
component of a DSIM.
(C) In addition to any other changes in business risk experienced by the electric utility, the commission may take into
account any change in business risk to the electric utility resulting from discontinuance of the DSIM in setting the electric
utility’s allowed return on equity in a general rate proceeding.
(D) If the utility requests that cost recovery be discontinued,
in its notice to customers, the electric utility shall include a
commission-approved description of why it believes the cost
recovery component of the DSIM should be discontinued.
(4) Requirements for Adjustments of DSIM Rates Between
General Rate Proceedings. An electric utility with a DSIM shall
file to adjust its DSIM rated no less often than annually.
(A) The electric utility shall file tariff sheets to adjust its DSIM
rates accompanied by supporting testimony and contain at
least the following supporting information. All models and
spreadsheets shall be provided as executable versions in native
format with all links and formulas intact.
1. Amount of revenue that it has over-/under-recovered
through the most recent recovery period by rate class.
AND INSURANCE
2. Proposed positive or negative adjustments by rate class.
3. Electric utility’s short-term borrowing rate.
4. Proposed adjustments to the current DSIM rates.
5. Complete documentation for the proposed adjustments
to the current DSIM rates.
6. Any additional information the commission ordered to
be provided.
(B) The staff shall examine and analyze the information filed
by the electric utility and additional information obtained
through discovery, if any, to determine if the proposed adjustments to the DSIM amount and DSIM rates are in accordance
with the provisions of this rule, section 393.1075, RSMo, and
the DSIM established, modified, or continued in the most recent filing for demand-side program approval. The staff shall
submit a recommendation regarding its examination and
analysis to the commission not later than thirty (30) days after
the electric utility files its tariff sheets to adjust its DSIM rates.
If the adjustments to the DSIM rates are in accordance with the
provisions of this rule, section 393.1075, RSMo, and the DSIM established, modified, or continued in the most recent filing for
demand-side program approval, the commission shall either
issue an interim rate adjustment order approving the tariff
sheets within sixty (60) days of the electric utility’s filing or, if
no such order is issued, the adjustments to the DSIM rates shall
take effect sixty (60) days after the tariff sheets were filed. If the
adjustments to the DSIM rates are not in accordance with the
provisions of this rule, section 393.1075, RSMo, or the DSIM established, modified, or continued in the most recent filing for
demand-side program approval, the commission shall reject
the proposed tariff sheets within sixty (60) days of the electric
utility’s filing and may instead order the filing of interim tariff
sheets that implement its decision.
(C) Adjustments to the DSIM rates shall reflect a comprehensive measurement of both increases and decreases to the DSIM
amount established in the most recent demand-side program
approval or DSIM rate adjustment case plus the increases and
decreases to the DSIM amount which occurred since the most
recent demand-side program approval or DSIM rate adjustment case. All DSIM rate adjustments shall include a true-up
of past DSIM collections based on the latest EM&V results
where applicable. Any over-/under-recovered amounts will be
accounted for in the going forward DSIM rates.
(D) The electric utility shall be current on its submission of its
Surveillance Monitoring Reports as required in section (10) and
its annual reports as required in section (9) in order to increase
the DSIM rates.
(E) If the staff, public counsel, or other party believes the
electric utility has not met the filing requirements of subsection (4)(A), it shall notify the electric utility within ten (10) days
of the electric utility’s filing of an application or tariff sheets to
adjust DSIM rates and identify the information required. The
electric utility shall submit the information identified by the
party, or shall notify the party that it believes the information
submitted was in compliance with the requirements of subsection (4)(A), within ten (10) days of the request. A party who
notifies the electric utility it believes the electric utility has
not submitted all the information required by subsection (4)
(A) and as ordered by the commission in a previous proceeding
and receives notice from the electric utility that the electric
utility believes it has submitted all required information may
file a motion with the commission for an order directing the
electric utility to produce that information, i.e., a motion to
compel. While the commission is considering the motion to
compel, the processing timeline for the adjustment to increase
DSIM rates shall be suspended. If the commission then issues
an order requiring the information be submitted, the time
necessary for the information to be submitted shall further
extend the processing timeline for the adjustment to increase
DSIM rates. For good cause shown, the commission may further
suspend this timeline. Any delay in submitting sufficient information in compliance with subsection (4)(A) or a commission
order in a previous proceeding in a request to decrease DSIM
rates shall not alter the processing timeline.
(5) Implementation of DSIM. Once a DSIM is established, modified, or discontinued, in lieu of contemporaneous rate recovery
the utility may request use of deferral accounting for MEEIA
financial impacts using the utility’s latest approved weighted
average cost of capital until the cut-off date for cost recognition ordered in the utility’s next general rate proceeding.
(6) Duration of DSIM. Once a DSIM is approved by the commission, it shall remain in effect for the term established by the
commission in the order approving that DSIM so as to allow full
recovery of all DSIM amounts. During the term of an approved
DSIM the utility or any party to the application for the utility’s
filing for approval of a demand-side program may propose
modifications to the DSIM. No modification of a utility’s DSIM
shall be made without the assent of the utility.
(7) Disclosure. Regardless of whether or not the utility requests
adjustments of its DSIM rates between general rate proceedings, any amounts charged under a DSIM approved by the
commission, including any earnings opportunity allowed by
the commission, shall be separately disclosed on each customer’s bill. Proposed language regarding this disclosure shall
be submitted to and approved by the commission before it
appears on customers’ bills. The disclosure shall also appear on
the utility’s websites.
(8) Evaluation, Measurement, and Verification (EM&V) of the
Process and Impact of Demand-Side Programs. Each electric utility shall hire an independent contractor to perform
and report EM&V of each commission-approved demand-side
program in accordance with 4 CSR 240-20.094 Demand-Side
Programs. The utility shall provide oversight and guidance
to the independent EM&V contractor, but shall not influence
the independent EM&V contractor’s report(s). The commission
shall hire an independent contractor to audit and report on
the work of each utility’s independent EM&V contractor. The
commission staff shall provide oversight and guidance to the
independent commission contractor, but shall not influence
the independent contractor’s audit(s). Staff counsel shall provide legal representation to the independent contractor in the
event the independent contractor is required to testify before
the commission.
(A) Each utility’s EM&V budget shall not exceed five percent
(5%) of the utility’s total budget for all approved demand-side
program costs.
(B) The cost of the commission’s EM&V contractor shall—
1. Not be a part of the utility’s budget for demand-side
programs; and
2. Be included in the Missouri Public Service Commission
Assessment for each utility.
(C) EM&V draft reports from the utility’s contractor for each
approved demand-side program shall be delivered simultaneously to the utility and to parties of the case in which the
demand-side program was approved.
(D) EM&V final reports from the utility’s contractor of each
approved demand-side program shall—
1. Document, include analysis, and present any applicable
recommendations for at least the following. All models and
spreadsheets shall be provided as executable versions in native
format with all links and formulas intact:
A. Process evaluation and recommendations, if any; and
B. Impact evaluation—
(I) The annual gross and net demand savings and energy savings achieved under each demand-side program and
the techniques used to estimate annual demand savings and
energy savings;
(II) For demand-side programs subject to cost-effectiveness tests, include total resource cost test, societal cost test,
utility cost test, participant cost test, and nonparticipant cost
test of each demand-side program; and
(III) Determine the net benefits achieved for each demand-side program subject to cost-effectiveness tests and for
the portfolio of such programs using the utility cost test (UCT)
methodology;
2. Be completed by the EM&V contractor on a schedule approved by the commission at the time of demand-side program
approval in accordance with 4 CSR 240-20.094(4); and
3. Be filed with the commission in the case in which the
utility’s demand-side program approval was received and delivered simultaneously to the utility and the parties of the case
in which the demand-side program was approved.
(E) Electric utility’s EM&V contractors shall—
1. Include specific methodology for performing EM&V
work; and
2. Utilize the TRM approved with the utility’s application
for its DSIM and demand-side portfolio.
(9) Demand-Side Program Annual Report. Each electric utility
with one (1) or more approved demand-side programs shall
file an annual report by no later than ninety (90) days after
the end of each program year, make a public version available
for publication on the commission’s website, and serve a copy
on each party to the case in which the demand-side programs
were last established, modified, or continued. Interested parties may file comments with the commission concerning the
content of the utility’s annual report within thirty (30) days of
its filing. Annual reports shall include at a minimum the following information, and all models and spreadsheets shall be
provided as executable versions in native format with all links
and formulas intact:
(A) An affidavit attesting to the veracity of the information;
and
(B) A list of all approved demand-side programs and the following information for each approved demand-side program:
1. Actual amounts expended by year, including customer
incentive payments;
2. Peak demand and energy savings impacts and the techniques used to estimate those impacts;
3. A comparison of the estimated actual annual peak demand and energy savings impacts to the annual demand and
energy savings targets approved by the commission under 4
CSR 240-20.094(4)(I) or 4 CSR 240-20.094(5)(A)5.;
4. For market transformation demand-side programs, a
quantitative and qualitative assessment of the progress being
made in transforming the market;
5. A comparison of actual and budgeted demand-side
program costs, including an explanation of any increase or
decrease of more than twenty percent (20%) in the cost of a
demand-side program;
6. The avoided costs and the techniques used to estimate
those costs;
7. The estimated cost-effectiveness of the demand-side program and a comparison to the estimates made by the utility at
the time the demand-side program was approved;
8. The estimated net benefits of each demand-side program and the demand-side portfolio;
9. For each demand-side program where one (1) or more
customers have opted out of demand-side programs pursuant
to section 393.1075.7, RSMo, a listing of the customer(s) who
have opted out of participating in demand-side programs;
10. As part of its annual report, the electric utility shall file
or provide a reference to the commission case that contains a
copy of the EM&V report for the most recent annual reporting
period; and
11. Demonstration of relationship of the demand-side
programs to demand-side resources in latest filed 4 CSR 240-22
compliance filing.
(10) Submission of Surveillance Monitoring Reports. Each
electric utility with an approved DSIM shall submit to staff,
public counsel, and parties approved by the commission a
Surveillance Monitoring Report. Each electric utility with a
DSIM shall submit, as page 6 of the Surveillance Monitoring
Report, a quarterly progress report in a format agreed upon by
the utility and staff, and all models and spreadsheets shall be
provided as executable versions in native format with all links
and formulas intact. The report shall be submitted to the staff,
public counsel, and stakeholders approved by the commission.
(A) The Surveillance Monitoring Report shall be submitted
within fifteen (15) days of the electric utility’s next scheduled
United States Securities and Exchange Commission (SEC) 10-Q
or 10-K filing with the initial submission within fifteen (15) days
of the electric utility’s next scheduled SEC 10-Q or 10-K filing
following the effective date of the commission order establishing the DSIM.
(B) If the electric utility also has an approved environmental
cost recovery mechanism or a fuel cost adjustment mechanism, the electric utility shall submit a single Surveillance
Monitoring Report for all mechanisms.
(C) Upon a finding that a utility has knowingly or recklessly
provided materially false or inaccurate information to the
commission regarding the surveillance data prescribed in this
section, after notice and an opportunity for a hearing, the
commission may suspend a DSIM or order other appropriate
remedies as provided by law.
(D) Disagreements about the report format or content shall
be settled by the commission.
(11) Prudence Reviews. A prudence review of the costs subject
to the DSIM shall be conducted no less frequently than at twenty-four- (24-) month intervals.
(A) All amounts ordered refunded by the commission shall
include interest at the electric utility’s short-term borrowing
rate.
(B) The staff shall submit a recommendation regarding its
examination and analysis to the commission not later than
one hundred fifty (150) days after the staff initiates its prudence audit. The timing and frequency of prudence audits for
DSIM shall be established in the utility’s filing for demand-side
program approval in which the DSIM is established. The staff
shall file notice within ten (10) days of starting its prudence
audit. The commission shall issue an order not later than two
hundred ten (210) days after the staff commences its prudence
audit if no party to the proceeding in which the prudence
audit is occurring files, within one hundred sixty (160) days of
the staff’s commencement of its prudence audit, a request for
AND INSURANCE
a hearing.
1. If the staff, public counsel, or other party auditing the
DSIM believes that insufficient information has been supplied
to make a recommendation regarding the prudence of the
electric utility’s DSIM, it may utilize discovery to obtain the
information it seeks. If the electric utility does not timely supply the information, the party asserting the failure to provide
the required information must timely file a motion to compel
with the commission. While the commission is considering the
motion to compel, the processing timeline shall be suspended.
If the commission then issues an order requiring the information to be provided, the time necessary for the information to
be provided shall further extend the processing timeline. For
good cause shown, the commission may further suspend this
timeline.
2. If the timeline is extended due to an electric utility’s
failure to timely provide sufficient responses to discovery and a
refund is due to the customers, the electric utility shall refund
all imprudently incurred costs plus interest at the electric utility’s short-term borrowing rate.
(12) Tariffs and Regulatory Plans. The provisions of this rule
shall not affect—
(A) Any adjustment mechanism, rate schedule, tariff, incentive plan, or other ratemaking mechanism that was approved
by the commission and in effect prior to the effective date of
this rule; and
(B) Any experimental regulatory plan that was approved by
the commission and in effect prior to the effective date of this
rule.
(13) Nothing in this rule shall preclude a complaint case from
being filed, as provided by law.
(14) Variances. Upon request and for good cause shown, the
commission may grant a variance from any provision of this
rule.
(15) Party status and providing to other parties affidavits,
testimony, information, reports, and workpapers in related
proceedings subsequent to the utility’s filing for demand-side
program approval, modification, or continuation of a DSIM.
(A) A person or entity granted intervention in a utility’s
filing for demand-side program approval in which a DSIM is
approved by the commission shall have the right to be a party
to any subsequent related periodic rate adjustment proceeding
without the necessity of applying to the commission for intervention; however, such person or entity shall file a notice of
intention to participate within the intervention period. Public
Counsel and the commission’s staff do not need to file a notice
of intention to participate. In any subsequent utility’s filing for
demand-side program approval, such person or entity must
seek and be granted status as an intervenor to be a party to
that proceeding.
(B) Affidavits, testimony, information, reports, and workpapers to be filed or submitted in connection with a subsequent
related annual DSIM rate adjustment proceeding or utility’s
filing for demand-side program approval to modify, continue,
or discontinue the same DSIM shall be served on or submitted
to all parties from the prior related demand-side program approval proceeding and on all parties from any subsequent related periodic rate adjustment proceeding or utility’s filing for
demand-side program approval to modify, continue, or discontinue the same DSIM, concurrently with filing the same with
the commission or submitting the same to the manager of the
energy resource analysis section of the staff and public counsel.
(C) A person or entity not a party to the utility’s filing for
demand-side program approval in which a DSIM is approved
by the commission may timely apply to the commission for
intervention, pursuant to 4 CSR 240-2.075(2) through (4) of
the commission’s rule on intervention, respecting any related
subsequent periodic rate adjustment proceeding or, pursuant
to 4 CSR 240-2.075(1) through (5), respecting any subsequent
utility’s filing for demand-side program approval to modify,
continue, or discontinue the same DSIM.
(16) Missouri Energy Efficiency Investment Act (MEEIA) Rate
Design Modifications.
(A) An electric utility may request modification of its DSIM
rates by filing tariff schedule(s) with the commission as part
of—
1. An application for approval of demand-side programs or
a demand-side program plan and a DSIM; or
2. A general rate case proceeding.
(B) Any request for modification of a rate design shall include
with the filing supporting documentation for the request, including but not limited to, workpapers, data, computer model
documentation, analysis, and other supporting information to
support and explain the modification of the rate design. All
information shall be labeled and all spreadsheets shall be provided as executable versions with all links and formulas intact.
(C) Right to Discovery Unaffected. In addressing certain
discovery matters and the provision of certain information by
electric utilities, this rule is not intended to restrict the discovery rights of any party.
AUTHORITY: section 393.1075.11, RSMo 2016.* This rule originally
filed as 4 CSR 240-20.093. Original rule filed Oct. 4, 2010, effective
May 30, 2011. Amended: Filed Dec. 27, 2016, effective Oct. 30, 2017.
Moved to 20 CSR 4240-20.093, effective Aug. 28, 2019.
*Original authority: 393.1075, RSMo 2009.