20 CSR 4240-23.040
State Reliability Mechanism (SRM)
PURPOSE: This rule establishes the requirements governing the
state reliability mechanism (SRM) in accordance with section
393.1080, RSMo.
PUBLISHER’S NOTE: The secretary of state has determined that
publication of the entire text of the material that is incorporated
by reference as a portion of this rule would be unduly cumbersome
or expensive. This material as incorporated by reference in this
rule shall be maintained by the agency at its headquarters and
shall be made available to the public for inspection and copying
at no more than the actual cost of reproduction. This note applies
only to the reference material. The entire text of the rule is printed
here.
(1) Definitions. The following definitions shall apply in this rule:
(A) Accredited capacity means the deliverable or firm
capacity value as determined and assigned to a resource by the
appropriate regional transmission organization or independent
system operator (RTO/ISO) for determining resource adequacy;
(B) Actual peak demand means the maximum demand ex
perienced by an electrical corporation during the applicable
time period;
(C) Appropriate regional transmission organization or inde
pendent system operator (RTO/ISO) means the Midcontinent
Independent System Operator (MISO), or any successor orga
nization, or the Southwest Power Pool (SPP), or any successor
organization the electrical corporation is a member of;
(D) Auction purchase means rights to a specific accredited
capacity amount bought in an RTO/ISO capacity auction;
(E) Behind the meter generation (BTMG) means a generation
resource located downstream of an electrical corporation’s
interconnection point to an RTO/ISO’s system, such as a
substation, but only one that is considered by the appropriate
RTO/ISO in resource adequacy determinations;
(F) Bilateral contract means an agreement for the rights to
future capacity;
(G) Capacity resource means a generation resource, demand
response resource, or energy storage system (ESS) resource
wholly owned, partially owned, or contracted by an electrical
corporation for providing resource adequacy;
(H) Coincident peak demand means the demand experienced
by an electrical corporation at the time that the appropriate
RTO/ISO experiences peak demand during the applicable time
period;
(I) Company-owned capacity resource means a capacity
resource for which an electrical corporation has an ownership
stake for a portion or all of the accredited capacity;
(J) Contracted capacity resource means a capacity resource
for which an electrical corporation has an agreement for a
portion or all of the accredited capacity;
(K) Demand-side resource means a resource or program that
reduces or shifts demand that is included in resource adequacy
determinations submitted to the appropriate RTO/ISO and may
be considered a capacity resource in accordance with the rules
of the appropriate RTO/ISO or may be included in an electrical
corporation’s peak forecast but not both;
(L) Demand response resource means a resource that is
considered by the appropriate RTO/ISO in resource adequacy
determinations that can be dispatched by the appropriate RTO/
ISO or electrical corporation to reduce or shift demand. Demand
response is the quantified impact reduction of electricity
consumption, across one (1) or more customer sites deployed
in response to system reliability needs or an economic price
signal;
(M) Distribution losses means the amount of real power that
is lost across an electrical corporation’s system that is included
in the electrical corporation’s forecast peak demand;
(N) Effective load carrying capability (ELCC) means an
accreditation method by which a capacity value is assigned
to a capacity resource based on the ability of the capacity
resource to dependably and reliably serve as measured against
a reliability metric;
(O) Electrical corporation means the same as defined in
section 386.020, RSMo, but shall not include an electrical
corporation as described in section 393.110.2, RSMo;
(P) Energy storage system (ESS) resource means a resource
capable of capturing energy, storing it, and dispatching
the energy back into the bulk power system or the utility’s
distribution system, and accredited by the appropriate RTO/ISO
in resource adequacy determinations;
(Q) Forecast peak demand means the maximum demand
that an electrical corporation reasonably estimates to be
experienced during the applicable time period;
(R) Generation resource means a resource capable of
producing electricity and dispatching the electricity into the
bulk power system or the utility’s distribution system, and
accredited by the appropriate RTO/ISO in resource adequacy
determinations;
(S) Installed capacity (ICAP) means an accreditation method
by which a capacity value is assigned to a generation resource
based on the demonstrated output of the generation resource
or the contracted output of the generation resource;
(T) Load diversity factor means the ratio of an electrical
corporation’s coincident peak demand to the actual peak
demand of the service territory and shall be determined by
dividing the coincident peak demand by the non-coincident
peak demand;
(U) Maximum operating capacity means the current maxi
mum intended output of a generator as designed by the manu
facturer (e.g., nameplate), as modified after initial installation,
as determined based on annual testing required by an appro
priate RTO/ISO, or as limited by licensing, permitting, or other
operating restrictions;
(V) Non-coincident peak demand means the maximum peak
demand experienced by an electrical corporation during the
applicable time period, regardless of the demand experienced
by the appropriate RTO/ISO;
(W) Planned capacity resource means a capacity resource
that has not yet been placed into operation or for which an
electrical corporation has not yet purchased or contracted;
(X) Planning reserve margin (PRM) means the percentage, set
by the appropriate RTO/ISO, above the forecasted coincident
peak demand for which an electrical corporation must have
adequate capacity resources to meet. For electrical corporations
that take part in the SPP resource adequacy process, the PRM
is the base PRM;
(Y) Planning reserve margin required capacity means the
capacity determined by the appropriate RTO/ISO for which
an electrical corporation must have equal to or greater than
accredited capacity for the applicable time period;
(Z) Planning season, for electrical corporations that take part
in the MISO resource adequacy process, means the seasons
(summer, fall, winter, spring) in a planning year;
(AA) Planning year (PY) means from June 1 of one year
through May 31 of the following year that is used for the SRM
Reporting Template as described in section (2) of this rule;
(BB) Power purchase agreement (PPA) means an electricity
supply agreement between a power producer and an electrical
corporation;
(CC) Public Utility Regulatory Policies Act of 1978 (PURPA)
qualifying facility (QF) means a cogeneration facility or a small
power production facility that meets the requirements of 18
CFR 292.201 through 292.211 and has obtained a QF certification
in accordance with 18 CFR 292.207;
(DD) Pumped-storage hydroelectric system means an ESS
where water is pumped to a reservoir at a higher elevation
during times of lesser demand, and then the water is released
to a reservoir at a lower elevation with the water passing
through turbines to generate electricity at times of increased
demand;
(EE) Resource type means the fuel or source from which a
capacity resource obtains energy, including but not limited
to natural gas, coal, oil, solar, wind, nuclear, hydroelectric,
geothermal, and pumped-storage hydroelectric system;
(FF) Seasonal accredited capacity (SAC) means an accreditation
method by which a capacity value is assigned to a capacity
resource based on the availability of the capacity resource
during times of increased demand during the relevant season;
(GG) Service territory means the area in which the electrical
corporation has been approved by the commission to provide
electrical service to customers;
(HH) Sufficient capacity means owned or contracted-for
capacity that meets the planning reserve margin or successor
metric established by the appropriate RTO/ISO or established by
the commission if the electrical corporation is not a participant
in a regional transmission organization or independent system
operator;
(II) Summer planning season, for electrical corporations that
take part in the SPP resource adequacy process, means June 1
through September 30 each year;
(JJ) System capacity purchases means purchases for a specific
amount of accredited capacity not tied to specific generation
resources;
(KK) System capacity sales means sales for a specific amount
of accredited capacity not tied to specific generation resources;
(LL) Transmission limitations means known and measurable
constraints within the appropriate RTO/ISO’s system that limit
the amount of power that can be delivered from an electrical
corporation’s capacity resources to the electrical corporation’s
system;
(MM) Transmission losses means the amount of real power,
expressed as a percentage, that is lost in transmission facilities
when delivering energy to load;
(NN) Unforced capacity (UCAP) means an accreditation
method by which a capacity value is assigned to a generation
resource after adjusting the ICAP for the expected availability
or historical availability of the generation resource or fuel
availability; and
(OO) Winter planning season, for electrical corporations
that take part in the SPP resource adequacy process, means
December 1 through March 31 each year.
(2) Reporting form. The SRM Reporting Template shall include
the electrical corporation’s plan to own or have rights to
sufficient capacity to meet its capacity obligations for the
upcoming planning year and each of the three (3) subsequent
years. The SRM Reporting Template, revised April 17, 2026, is
hereby incorporated by reference and made a part of this rule.
The SRM Reporting Template is available at www.psc.mo.gov/.
This rule does not incorporate any subsequent amendments or
additions.
(3) Reporting.
AND INSURANCE
(A) Annually, but not later than May 31, each electrical
corporation that takes part in the MISO resource adequacy
process shall submit an SRM Reporting Template (incorporated
by reference in section (2)) for each planning season reflecting
the electrical corporation’s plan to own or have rights to
sufficient capacity to meet its capacity obligations.
(B) Annually, but not later than January 14, each electrical
corporation that takes part in the SPP resource adequacy
process shall submit an SRM Reporting Template required
by section (2) for the winter planning season reflecting the
electrical corporation’s plan to own or have rights to sufficient
capacity to meet its capacity obligations.
(C) Annually, but not later than July 15, each electrical
corporation that takes part in the SPP resource adequacy
process shall submit an SRM Reporting Template required
by section (2) for the summer planning season reflecting the
electrical corporation’s plan to own or have rights to sufficient
capacity to meet its capacity obligations.
(D) An electrical corporation shall submit supplemental SRM
Reporting Templates if inaccurate information or mistakes are
identified in the electrical corporation’s initial submission or
previous supplemental submissions of any of the above within
fourteen (14) days of the discovery by the electrical corporation
of the inaccurate information or mistakes.
AUTHORITY: section 393.1080, RSMo Supp. 2025.* Original rule
filed Jan. 14, 2026, effective Sept. 30, 2026.
*Original authority: 393.1080, RSMo 2025.