20 CSR 4240-3.190
Reporting Requirements for Electric Utilities and Rural Electric Cooperatives
PURPOSE: This rule prescribes requirements and procedures for
the reporting of certain events by electric utilities to the commission to inform the commission of developments that may affect
the rendering of safe and adequate service and to enable the commission to thoroughly and fairly investigate certain accidents and
events that may have an impact in future electric rate proceedings
at the time and in the context in which those events occur. This
rule also includes electrical facilities accident and event reporting
requirements for rural electric cooperatives.
PUBLISHER’S NOTE: The secretary of state has determined that
publication of the entire text of the material that is incorporated
by reference as a portion of this rule would be unduly cumbersome
or expensive. This material as incorporated by reference in this
rule shall be maintained by the agency at its headquarters and
shall be made available to the public for inspection and copying
at no more than the actual cost of reproduction. This note applies
only to the reference material. The entire text of the rule is printed
here.
(1) Definitions. The following definitions shall apply to this rule:
(A) Facility is a site at which electric generating units and/
or equipment for converting mechanical, chemical, and/or
nuclear energy into electric energy are situated. A facility may
contain more than one generating unit or the same or different
type.
(B) Generating unit is an individual electric generator and
its associated plant and apparatus whose electrical output is
capable of being separately identified and metered.
(2) Every electric utility shall accumulate at least the following
information and submit it monthly in the commission’s electronic filing and information system (EFIS) by the last day of the
month following the month to be reported:
(A) Monthly as-burned fuel report for each carbon-based fuel
generating unit, including the amount of each type of fuel
consumed, the British thermal unit (Btu) value of each fuel
consumed, and the blending percentages (if applicable);
(B) Capacity purchases of regardless of duration;
(C) Schedule of planned outages of power production facilities;
(D) Schedule of planned fuel test burns, unit heat-rate tests
provided as a heat-rate curve, and accreditation runs with documentation of the results of all tests and runs;
(E) Citations or notices of violation and copies of the electric utility response, or a statement that no such citations or
notices were received, related to power production facilities
received from any state or federal utility regulatory agency
or environmental agency including but not limited to the
Federal Energy Regulatory Commission (FERC), the North
American Electric Reliability Corporation (NERC), the Nuclear
Regulatory Commission (NRC), the Environmental Protection
Agency (EPA), the Department of Natural Resources (DNR), and
the Department of Energy (DOE);
(F) Penalties incurred under a Regional Transmission
Organization or an Independent System Operator Open Access
Transmission Tariff, the reason for the penalty, and the expected remediation steps; and
(G) The terms of new contracts or existing contracts which
will be booked according to the FERC’s Uniform System of
Accounts as adopted by the commission in 20 CSR 4240-20.030
requiring the expenditure by the electric utility of more than
two hundred thousand dollars ($200,000) including but not
limited to contracts for engineering, consulting, repairs, and
modifications or additions to an electric facility.
(3) Monthly Reporting of Hourly Data.
(A) Every electric utility shall accumulate the information
described below and submit it monthly in EFIS on the last day
of the month following the month to be reported:
1. All generating unit outages and derates for all units regardless of size, dispatchability, fuel type, or ownership share;
2. Net system input for the electric utility;
3. Hourly generation for each generating unit both including and excluding hourly station use;
4. Hourly day-ahead cleared generation, hourly real-time
generation, and ancillary services for each generating unit;
5. Hourly day-ahead load and real-time load at each load
node;
6. Total load for each hour by—
A. Wholesale load;
B. Sale for resale load; and
C. Retail load by—
(I) Rate code if customers taking service on a rate code
are metered at a consistent voltage; or
(II) Rate schedule for each voltage of service offered
within each rate schedule; and
7. Megawatt amount and delivery prices of hourly purchases and sales of electricity from or to other electrical services providers, independent power producers, or cogenerators
and small power producers, including any party to the purchase or sale, and the terms of the purchase or sale.
A. If adjustments are made to the price of hourly purchases after the purchase is made, provide the amount of the
adjustment and the time period over which the adjustment
was made.
(B) The information in this section shall be provided in an
electronic format from which the data can be easily extracted
for analysis in spreadsheet or database software using the templates provided by the commission.
(4) Incident Reporting.
(A) Every electric utility shall report through EFIS by the end
of the first business day following discovery of an incident the
information described below:
1. Details of any accident or event at a facility involving
serious physical injury or death or property damage in excess
of two hundred thousand dollars ($200,000);
2. Forced outages of any nuclear generating unit(s) that
could reasonably be anticipated to last longer than three (3)
days;
3. Forced outages of any fossil-fuel fired generating unit(s)
with an accredited capacity of greater than one hundred (100)
megawatts that reasonably could be anticipated to last longer
than three (3) days, when the unit(s) is forced out due to a common or unforeseen occurrence;
4. Forced outages of wind and solar generating facilities
when there is a loss of at least thirty percent (30%) of total
installed capacity that reasonably could be anticipated to last
longer than three (3) days, when the cause is due to a common
or unforeseen occurrence;
5. Reductions of coal inventory below a thirty- (30-) day
supply and reductions of oil inventory below fifty percent (50%)
of the storage capacity of that oil facility; and
6. Loss of transmission capability that could limit the output of a generating facility or the transfer capability into or out
of the electric utility’s system.
(B) The electric utility shall submit, through EFIS within five
(5) business days following the discovery, an update of the
incident including any details not available at the time of the
initial report.
(C) Incidents under paragraph (4)(A)1. require a detailed
investigative report, which shall be submitted through EFIS
within one hundred twenty (120) days.
(5) If a utility provides notice of a generating unit retirement to
a regional transmission organization or an independent system
operator, notice shall be provided to the commission in the
applicable reporting month.
(6) Electrical Contact Reporting.
(A) Every electric utility and rural electric cooperative shall
notify designated commission personnel by telephone or in
writing by the end of the first business day following the discovery of any electrical contact, provided the utility or rural
electric cooperative first has received proper notice or has
actual knowledge of the electrical contact, as described below:
1. Electrical contact, arc, or flash with its energized electrical supply facilities or at locations it supplies power that
results in admission to a hospital or the fatality of any person
even when the source of the electric current is believed to have
originated on the customer’s side of the meter; or
2. Courtesy notifications may be provided regarding any
other electrical contact, arc, or flash considered significant by
the electric utility or rural electric cooperative.
(B) The electric utility or rural electric cooperative shall submit to designated commission personnel within ten (10) business days following the initial notification a written report consisting of any details not available at the time of the initial notification, including information relevant to the circumstances
of the incident. Relevant information may include the number
of persons injured, type and extent of injuries, cause (if known),
extent of any resulting outages, identification of the physical
equipment of such electric utility or cooperative, a description
of work being performed at the location, weather conditions,
and the land use surrounding the scene of the incident.
(C) Electrical contact reporting may be made through EFIS
or using the Missouri Public Service Commission Electrical
AND INSURANCE
Contact Reporting Form, hereby incorporated by reference
and made a part of this rule, as published by the commission,
September 24, 2024, and provided on the commission website
at psc.mo.gov. This rule does not incorporate any subsequent
amendments or additions.
(D) Contact information for designated commission personnel is included on the Missouri Public Service Commission
Electrical Contact Reporting Form, hereby incorporated by
reference and made a part of this rule, as published by the
commission, September 24, 2024, and provided on the commission website at psc.mo.gov. This rule does not incorporate any
subsequent amendments or additions.
(E) Neither the initial notification or written report nor the
public availability of either shall be deemed to be an admission
or waiver of any privilege of the notifying or reporting electric
utility or rural electric cooperative.
(7) All reports and information submitted by electric utilities
and rural electric cooperatives pursuant to this rule shall be
subscribed by an authorized representative of the electric
utility or rural electric cooperative having knowledge of the
subject matter and shall be stated to be accurate and complete,
and contain no material misrepresentations or omissions,
based upon facts of which the person subscribing the report or
information has knowledge, information, or belief.
(8) The reporting requirements prescribed by this rule shall be
in addition to all other reporting requirements prescribed by
law.
(9) The information contained in the reports filed pursuant to
this rule shall be subject to the provisions of section 386.480,
RSMo, and the use of that information in any proceeding before the commission shall be governed by the terms of 20 CSR
4240-2.135 and any protective order issued by the commission
in the proceeding, if a protective order has been issued.
(10) The receipt by the commission or commission staff of
reports prescribed by this rule shall not bind the commission
or commission staff to the approval or acceptance of, or agreement with, any matter contained in the reports for the purpose
of fixing rates or in determining any other issue that may come
before the commission.
(11) Upon proper application and after notice and an opportunity for hearing, the commission, in its discretion, may waive
any provision of this rule for good cause shown.
AUTHORITY: sections 386.250 and 394.160, RSMo 2016.* This
rule originally filed as 4 CSR 240-3.190. Original rule filed Aug.
16, 2002, effective April 30, 2003. Amended: Filed Oct. 14, 2003,
effective April 30, 2004. Amended: Filed Dec. 16, 2009, effective
Aug. 30, 2010. Moved to 20 CSR 4240-3.190, effective Aug. 28, 2019.
Amended: Filed July 31, 2024, effective March 30, 2025.
*Original authority: 386.250, RSMo 1939, amended 1963, 1967, 1977, 1980, 1987, 1988,
1991, 1993, 1995, 1996, and 394.160, RSMo 1939, amended 1979.