10 CSR 80-2.015
Preliminary Site Investigation, Detailed Site Investigation Workplan, and Detailed Site Investigation and Characterization Report
PURPOSE: This rule describes the steps
required to characterize the geologic and
hydrologic conditions at a proposed solid
waste disposal area prior to submittal of a
construction permit applica tion in compliance with section 260.205, RSMo (Cum.
Supp. 1996).
(1) On and after January 1, 1996, no applicant may apply for, or obtain, a permit to
construct a solid waste disposal area unless
the person has obtained geologic and hydrologic site approval from the department.
Geologic and hydrologic approval indicates
that the site has been found to be suitable for
development of a solid waste disposal area,
provided the required plans and engineering
reports detailing the construction and operation of the site are prepared and approved by
the department. In order to obtain geologic
and hydrologic site approval from the department, the following procedures must be followed:
(A) The potential disposal area construction permit applicant must obtain preliminary
site approval from the department. The applicant shall provide the department a map that
delineates the approximate horizontal boundaries of the proposed solid waste disposal
area and provide the approximate elevation of
the base of the proposed solid waste disposal
area. The applicant may provide the department any other information pertinent to the
site that may assist in the preliminary site
investigation. The Division of Geology and
Land Survey (DGLS) Geologic Survey Program (GSP) will conduct a preliminary site
investigation and approve or disapprove the
site for further investigation within sixty (60)
days of receipt of a request. Preliminary site
approval is provisional, as required additional investigations may reveal conditions that
may lead to site disapproval. Disapproval may
be reviewed by the DGLS division director.
Preliminary site investigation requests shall
be submitted to the GSP on the form included in Appendix 1 which is included herein.
After performing a preliminary site investigation, the GSP shall make one (1) of the following determinations:
1. The geologic and hydrologic conditions of the site are not suitable for the development of a solid waste disposal area.
A. Sites proposed for sanitary or
demolition waste landfills known to have one
(1) or more of the following geologic or
hydrologic conditions within its boundaries
are considered unsuitable for the development
of a solid waste disposal area:
(I) Groundwater that must be
pumped in order to keep the wastes within the
proposed solid waste disposal area isolated
above the water table;
(II) Permeable geologic media,
including soil or bedrock with karst terrane
features, faults, joints, fractures, or voids,
that provide a pathway for the rapid migration
of fluids from the site into the uppermost
regional aquifer or the rapid migration of
groundwater from the site to a surface water
body outside of the site;
(III) Permeable geologic media,
including soil or bedrock with karst terrane
features, faults, joints, fractures, or voids,
that provide a pathway for the migration of
landfill-derived gases outside of the site;
(IV) A fault that has experienced
movement during the Holocene epoch that is
located within the boundaries of the proposed
solid waste disposal area;
(V) Groundwater that cannot effectively be monitored on-site due to karst terrane conditions; or
(VI) The presence of subsurface
voids or conditions that present a significant
potential for catastrophic collapse.
B. Sites proposed for utility waste
landfills known to have one (1) or more of the
following geologic or hydrologic conditions
within its boundaries are considered unsuitable for the development of a solid waste disposal area:
(I) A fault that has experienced
movement during the Holocene epoch that is
located within the boundaries of the proposed
solid waste disposal area;
(II) Groundwater that cannot effectively be monitored on-site due to karst terrane conditions; or
(III) The presence of subsurface
voids or conditions that present a significant
potential for catastrophic collapse;
2. There is insufficient data to allow a
proper determination to be made about site
suitability at the preliminary site investigation
phase. Such sites shall receive preliminary
site investigation approval but data must be
collected during the subsequent detailed site
investigation that fully characterizes the geologic and hydrologic conditions of the site
and demonstrates that the site is suitable for
the development of a solid waste disposal
area. GSP will assist the applicant in identifying geologic and hydrologic conditions that
must be fully characterized during the
detailed site investigation. If geologic or
hydrologic conditions pursuant to 10 CSR 802.015(1)(A)1. are identified during the
detailed site investigation, the site shall be
disapproved;
3. The geologic and hydrologic conditions of the site may be well suited for the
development of a solid waste disposal area.
Such sites shall receive preliminary site
investigation approval and may be subject to
reduced requirements during the detailed site
investigation. Sites that do not have any conditions pursuant to 10 CSR 80-2.015(1)(A)1.
and are underlain by one (1) or more of the
following geologic and hydrologic conditions
below the proposed sub-base grade may be
well suited for the development of a solid
waste disposal area:
A. A combined minimum thickness of
fifty feet (50') of low-permeability geologic
material that inhibits the movement of fluids
into the uppermost regional aquifer that is
currently used or is reasonably likely to be
used as a future domestic drinking water
source. The low-permeability geologic material must:
(I) Be comprised of shale, mudstone or glacial deposits comprised primarily
of clay or silt size particles; and
(II) Lack karst terrane features,
continuous sand or gravel layers, faults, fractures, cracks, voids, or other features that
provide a pathway for the rapid migration of
fluids or gases off the site;
B. Aquifers that are in geohydrologic
connection with the proposed solid-waste disposal area that do not yield potable groundwater or are not capable of producing greater
than three hundred sixty (360) gallons of
water per day from a domestic water well;
(B) Prior to conducting further investigation of the proposed site, the potential disposal area construction permit applicant must
retain a qualified groundwater scientist who
is a registered geologist per section 256.453,
RSMo who shall request and attend a workplan development meeting with the GSP.
This meeting shall include, at a minimum,
discussion of the geology and hydrology of
the proposed site and specific elements to be
included in the workplan, time frames for
completion of work and a discussion of the
regulatory process;
(C) The qualified groundwater scientist
who is a registered geologist per section
256.453, RSMo shall then prepare and submit to the department a workplan for conducting a detailed surface and subsurface
geologic and hydrologic investigation. The
elements and format of the workplan are listed in Appendix 1 which is included herein.
The GSP will review and approve or disapprove the detailed site investigation workplan
within thirty (30) days of receipt; and
(D) After the workplan is approved, a
qualified groundwater scientist shall investigate and characterize the geology and hydrology of the site in accordance with the
approved workplan, applicable rules and
department guidance. All geologic and
hydrologic data collection and interpretation
shall be under the direction of a geologist
registered in the state of Missouri. The
applicant or a representative shall notify the
GSP when drilling, testing, or field investigations are to take place so that department
personnel may be present on-site during the
investigations.
1. The approved workplan will provide
site-specific guidance for the applicant to
complete the detailed site investigation. The
workplan may be amended and changed with
the approval of the GSP, as the investigation
proceeds.
2. The qualified groundwater scientist
shall interpret and summarize the geologic
and hydrologic characteristics of the site in a
detailed site investigation and characterization report which is to be submitted to the
GSP. Guidance for conducting and reporting
a detailed site investigation is included herein as Appendix 1 of this rule. The report shall
be signed and sealed by a geologist registered
in the state of Missouri. The report shall be
submitted to the GSP for review.
(2) The GSP will review the report within
sixty (60) days of receipt and approve or disapprove the site.
(A) Approval will indicate that:
1. The site has been found to have suitable geologic and hydrologic characteristics
for the development of an environmentally
sound solid waste disposal area; or
2. That the detailed site investigation
and characterization report adequately
addresses geologic or hydrologic conditions
that can be overcome by engineering pursuant
to 10 CSR 80-3.010(5)(B)3., 10 CSR 804.010(4)(B)8. and 10 CSR 80-11.010(5)(A)3.
for the development of an environmentally
sound solid waste disposal area. Approval
shall not be granted to a site that has a condition specified as unsuitable pursuant to 10
CSR 80-2.015(1)(A)1.
(B) The potential disposal area construction permit applicant who has received
approval may then apply for a permit by submitting the required documents, plans, and
engineering reports to the department.
(C) Disapproval will indicate one (1) or
more of the following:
1. The site has been found to have
unsuitable geologic and hydrologic conditions
for the development of an environmentally
sound solid waste disposal area; or
2. The characterization of the site is not
adequate to show that the site has suitable
geologic and hydrologic conditions for the
development of an environmentally sound
solid waste disposal area; or
3. The characterization report is not
adequate to show that the site has suitable
geologic and hydrologic conditions for the
devel opment of an environmentally sound
solid waste disposal area.
(D) The GSP will specify the inadequacies
of the site, characterization of the site, or site
characterization report in the written disapproval of the site. Disapprovals may be
reviewed by the DGLS division director.
Next Section