10 CSR 80-5.010
Design and Operation
PURPOSE: This rule pertains to the design
and operation of solid waste processing facilities (incinerators, compost plants, transfer
stations or any facility where solid wastes are
salvaged).
(1) This rule sets forth requirements and the
method of satisfactory compliance to ensure
that the design and operation of the solid
waste processing facility will protect the public health, prevent nuisances and meet applicable environmental standards. The requirement subsections contained in this rule delineate minimum levels of performance required
of any solid waste processing facility operation. The satisfactory compliance subsections
are based on the satisfactory practice of handling municipal solid waste at a processing
facility. It is recognized that the various types
of facilities and types of solid wastes may justify or require the use of techniques other
than those listed as satisfactory compliance.
If techniques other than those listed as satisfactory compliance in design or operation are
used, it is the obligation of the solid waste
processing facility owner/operator to demonstrate to the department in advance that the
techniques to be employed will satisfy the
requirement. Procedures for the techniques
must be submitted to the department in writing and approved by the department in writing prior to being employed. Notwithstanding
any other provision of this rule, when it is
found necessary to meet the objectives of the
requirement subsections, the department will
require changes in design or operation as the
condition warrants. A solid waste processing
facility permitted for the treatment or other
processing of infectious waste shall also comply with the requirements of 10 CSR 807.010.
(2) Solid Waste Accepted.
(A) Requirement. In consultation with the
department, the professional engineer and
owner/operator shall determine what solid
wastes shall be accepted and shall identify
any special handling required. Only solid
wastes for which the facility has been specifically designed and performance tested shall
be accepted.
(B) Satisfactory Compliance—Design.
1. The plans shall identify the solid
wastes to be accepted and the procedures for
handling the various types of solid waste
accepted. The solid wastes to be accepted
shall be indicated on the Application for
Operating Permit form. Storage areas for
accepted solid wastes shall be designated in
the plan.
2. Provisions for storing, handling and
removing solid wastes not to be accepted that
are inadvertently left at the solid waste processing facility shall be considered in the
design. Storage areas for solid wastes not to
be accepted shall be designated in the plan.
3. At the request of the department, performance tests shall be conducted to demonstrate the successful processing of certain solid wastes and the professional engineer shall
submit a report to the department covering
the results of the performance tests with a
copy of all supporting data.
(C) Satisfactory Compliance—Operation.
1. Storage areas shall be clearly marked.
2. Facility personnel shall be thoroughly
trained in the handling of acceptable and
unacceptable waste received at the solid waste
processing facility.
3. The unloading of solid wastes should
be supervised to exclude the unacceptable
wastes.
4. A list of all solid wastes accepted for
processing at the solid waste processing facility shall be posted at the entrance.
(3) Site Selection.
(A) Requirement. Site selection shall comply with local planning and zoning requirements.
(B) Satisfactory Compliance—Design.
1. Plans shall be prepared or approved
by a professional engineer and shall include:
A. A map showing land use and zoning within one thousand feet (1000') of the
solid waste processing facility including location of all residences, buildings and roads.
This map shall have a scale of not less than
one inch (1") equals four hundred feet (400');
B. The location of utilities and the
effects of the solid waste processing facility
using the utilities with regard to capacity,
loading, etc.; and
C. The identity of the road(s) which
will serve as the primary route(s) to the solid
waste processing facility and the potential
effect upon the road(s) from increased traffic
volume and vehicle weights.
2. A report evaluating the effect of
noise, odors, air pollutants and potential
explosions or fires upon surrounding land
uses shall be submitted to the department.
(4) Design.
(A) Requirement. Plans for the design,
construction, operation or alteration of the
solid waste processing facility shall be prepared or approved and sealed by a professional engineer. The plans shall be submitted
to the department for review and approval.
(5) Water Quality.
(A) Requirement. All waters discharged
from the solid waste processing facility shall
be sufficiently treated to meet applicable
water quality standards, including those
established under the authority of the Federal
Water Pollution Control Act, sections
644.006–644.141, RSMo and rules promulgated and under municipal or regional sewer
discharge regulations.
(B) Satisfactory Compliance—Design.
1. Plans shall clearly define the area to
be included within the permitted boundary.
2. Plans for a solid waste processing
facility shall include provisions for control of
surface water runoff.
3. The plans for the solid waste processing facility shall provide for collection of process and wastewaters for on-site treatment,
recirculation or discharge.
4. The plans for the solid waste processing facility shall provide for the collection
and cleanup of any accidental spillage of
waste water that occurs on the facility site.
5. All applicable permits and approvals
necessary to comply with requirements of the
Missouri Clean Water Law and rules promulgated pursuant thereto shall be obtained from
the department.
6. All waste transfer and processing
activities shall take place beneath a roof so as
to prevent precipitation from coming into
contact with the waste being transferred or
processed.
(C) Satisfactory Compliance–Operation.
1. Waters discharged from the solid
waste processing facility shall be appropriately monitored and necessary adjustment made
to meet the applicable water quality standards.
2. In the event of an accidental spillage
of wastewater, the department’s Water Pollution Control Program shall be notified immediately.
3. Any accidental spillage of wastewater
that occurs on the facility site shall be contained and cleaned up in accordance with the
plans.
(6) Air Quality.
(A) Requirement. Emissions shall not
exceed the standards established by chapter
643, RSMo and rules promulgated.
(B) Satisfactory Compliance—Design. The
application shall contain—
1. All applicable permits and approvals
to comply with the requirements of the Air
Pollution Law and rules promulgated; or
2. The application shall contain copies
of all applicable permits or approvals and
authorizations from a local air pollution control agency operating under an exemption certificate authorized by Chapter 643, RSMo
and the rules promulgated pursuant thereto.
(C) Satisfactory Compliance—Operations.
Emissions from the solid waste processing
facility shall be appropriately monitored and
necessary adjustment made to meet applicable air quality standards in accordance with
Chapter 643, RSMo and rules promulgated.
(7) Vectors.
(A) Requirement. Conditions shall be
maintained that are unfavorable for the harboring, feeding and breeding of vectors.
(B) Satisfactory Compliance—Design. Solid waste processing facilities shall be
designed for ease of cleaning. Areas favorable
for breeding of vectors shall be avoided.
(C) Satisfactory Compliance—Operation.
1. A housekeeping schedule shall be
established and maintained. As a minimum
the schedule should provide for—
A. Cleaning, unloading and loading
areas as spillages occur;
B. Containerization of putrescible
waste at the end of each working day, unless
otherwise approved by the department. No
solid waste processing facility shall store
putrescible waste for longer than twenty-four
(24) hours on-site; and
C. Routinely cleaning the remainder
of the solid waste processing facility.
2. Vector control contingency programs
shall be implemented when necessary to prevent or rectify vector problems.
(8) Aesthetics.
(A) Requirement. The solid waste processing facility shall be designed and operated at
all times in an aesthetically acceptable manner.
(B) Satisfactory Compliance—Design. All
solid waste processing facilities shall be
designed to screen from public view the
unloading, storage and processing of solid
waste.
(C) Satisfactory Compliance—Operation.
1. A routine housekeeping and litter
removal schedule shall be established and
implemented so that the solid waste processing facility regularly presents a neat and clean
appearance. The litter shall be picked up at
least daily.
2. Non-putrescible solid waste that cannot be processed by the solid waste processing facility shall be removed from the facility
at least weekly and hauled to a solid waste
processing facility or solid waste disposal
area that has a permit to accept waste.
3. Immediate action is to be taken to
eliminate odors, dust or excess noise from the
solid waste processing facility which is creating a nuisance.
4. Solid waste shall not be accepted at
the solid waste processing facility if the available storage capacity is full or the facility is
expected to be out of operation for more than
twenty-four (24) hours.
(9) Residue and Processed Solid Waste.
(A) Requirement. Residue or processed
solid waste from a solid waste processing
facility shall be disposed of in an environmentally acceptable manner.
(B) Satisfactory Compliance—Design. A
solid waste processing facility shall be
designed to allow for removal of residue or
processed solid waste in a manner that protects the environment.
(C) Satisfactory Compliance—Operation.
1. Residue or other processed solid
waste not to be recycled or recovered shall be
disposed of in a solid waste disposal area that
has a permit to accept the waste.
2. Materials for recycling or resource
recovery from a solid waste processing facility shall be properly stored to prevent vector
or aesthetic problems or transported to another solid waste processing facility for further
processing or sale.
3. Transportation of residue or processed solid waste shall be by means that prevent the material from sifting, falling, leaking
or blowing from the vehicle.
(10) Safety.
(A) Requirement. Solid waste processing
facilities shall be designed and operated and
maintained in a manner to protect the health
and safety of personnel associated with the
operation.
(B) Satisfactory Compliance—Design.
1. Attention shall be given to the safety
of operators and vehicles through the provision of safety devices.
2. Provisions shall be included where
applicable to control dust for safety and
health of operating personnel.
3. The plans shall specify the facilities
and methods to be provided for extinguishing
fires.
(C) Satisfactory Compliance—Operation.
1. Personal safety devices, including but
not limited to, hard hats, safety glasses and
shoes shall be utilized by all persons on the
premises where needed.
2. The safety devices and controls provided in the design plans shall be maintained
in good operating condition and replaced
when needed.
3. Salvaging shall be prohibited unless
the solid waste processing facility has adequate provision in the design for these activities.
4. Access to the solid waste processing
facility shall be controlled by fencing or other suitable means to limit accessibility to
periods when responsible operating personnel
are on duty.
5. A fire extinguisher shall be provided
on all solid waste handling equipment.
6. Provisions shall be made to extinguish any fires in wastes being delivered to
the solid waste processing facility or which
occur at the solid waste processing facility or
within equipment or personnel facilities.
(11) Records.
(A) Requirement. The owner/operator of a
solid waste processing facility shall maintain
records and monitoring data as specified by
the department. The records and data shall be
provided to the department upon request.
(B) Satisfactory Compliance—Design.
Plans shall prescribe the records and methods
of monitoring the operation of the solid waste
processing facility that are desirable for proper and efficient operation.
(C) Satisfactory Compliance—Operation.
Records shall be maintained covering at least
the following:
1. The actual or estimated quantity of
solid waste received on each day;
2. Major operational problems, complaints or difficulties; and
3. Vector, odor, dust and litter control
efforts.
AUTHORITY: section 260.225, RSMo (Cum.
Supp. 1996). Original rule filed Dec. 11,
1973, effective Dec. 21, 1973. Amended:
Filed July 14, 1986, effective Jan. 1, 1987.
Amended: Filed Jan. 29, 1988, effective Aug.
1, 1988. Amended: Filed Aug. 15, 1988,
effective Dec. 29, 1988. Amended: Filed
March 17, 1992.** Emergency rescission of
the 1992 amendment filed March 19, 1997,
effective April 1, 1997, expired Sept. 27,
1997. Amended: Filed Oct. 10, 1996, effective July 30, 1997. Rescission of the 1992
amendment filed April 3, 1997, effective Aug.
30, 1997.
**The Missouri Supreme Court in Missouri
Coalition for the Environment, et al., v.
Joint Committee on Administrative Rules, et
al., Case No. 78628, dated February 25,
1997, ordered the secretary of state to publish
this amendment. The Missouri Department of
Natural Resources subsequently filed an
emergency rescission of this amendment as
well as a proposed rescission of this amendment which became effective August 30,
1997. See the above authority section for filing dates.