2 CSR 90-62.050
GPS Survey Guidelines
PURPOSE: This rule prescribes the minimum
procedures for first or second order Global
Positioning System surveys.
(1) Direct connections must be made to any
adjacent
observable
National
Spatial
Reference System (NSRS) and/or Missouri
Geographic Reference System (MO GRS)
station located five kilometers (5 km) or less
from any new station.
(2) At least three (3) existing higher or equal
order control points must be included in any
proposed Global Positioning System (GPS)
survey. Whenever possible these should be
three (3) three- (3-) dimensional control stations. Otherwise two (2) sets of three (3) stations, (three (3) two- (2-) dimensional horizontal stations and three (3) vertical control
stations) must be used. These control stations
should be chosen to be roughly equidistant on
the periphery of the proposed project so that
they enclose as much of the project as possible.
(3) Each new station to be established by the
proposed GPS survey must be occupied at
least two (2) separate times to enable proper
checking of blunders (for example, incorrect
point, setup errors, incorrect antenna heights).
A separate occupation is one in which the
antenna and its supporting device (tripod) have
been taken down and set up again and the
receiver restarted.
(4) Each station must be connected by simultaneous occupations (baselines) to at least
three (3) other stations in the network after
outlier baselines have been rejected from the
adjustment. Because it is generally easier to
resolve the integer phase ambiguities over
shorter baseline, adjacent stations should be
connected wherever possible.
(5) At least two (2) receivers must be used for
relative positioning, although three (3) or
more may be used for more efficient operation and increased station reoccupation and
base line repeatability.
(6) A preanalysis should be performed to
determine the minimum occupation time
required to achieve the required standard of
accuracy. In addition, the most appropriate
satellites to observe at each site should also
be selected for receivers unable to track all of
the “visible” satellites. The preanalysis
should be specific for carrier phase relative
positioning.
(7) In order to meet second order accuracies,
the carrier beat phase must be observed
together with a time tag for each observation.
Pseudo-range observations are not precise
enough for control surveys and cannot be
used.
(8) A detailed field log must be kept during
observation taken at each station. At the very
least the following information must be
recorded:
(A) Universal Time Coordinated (UTC)
date of observations;
(B) Station identification (name and number);
(C) Session identification;
(D) Serial numbers of receiver, antenna,
and data logger;
(E) Receiver operator;
(F) Antenna height and offset from monument, if any, to one millimeter (1 mm). Note
should be made as to whether the height is
measured as a slant height or vertical height;
(G) Diagram illustrating stamping on the
monument;
(H) Other stations observed during session;
(I) Starting and ending time (UTC) of
observations;
(J) Satellites observed (including time of
changes); and
(K) Completed field log data forms for
each station occupation will be submitted
either using those provided by the Missouri
Department of Agriculture (MDA) or some
other type containing all necessary information included on the MDA forms.
(9) The raw data files for all station occupations must be submitted. Each file will consist of one (1) set of raw observations for each
station occupation session. For example, four
(4) receivers operating during each of five (5)
sessions will produce twenty (20) raw data
files.
(10) The unadjusted baseline vector solution
files for all observed baselines, non-trivial
and trivial, will be submitted.
(11) If station description information is not
provided by MDA, it must be submitted for
each station occupied. Station descriptions
must include station name, county, township,
range, section, United States Geological
Survey (USGS) seven and one-half- (7.5-)
minute quadrangle name, date monumented,
date of observations, complete descriptions of
the station, azimuth, and all reference monuments, a current “to reach” description, and
any special information such as property
owner name, address, and phone number. A
sketch depicting the station and reference
marks with dimensions and directions shown
should accompany all narrative data.
Examples of complete station description
information may be obtained from MDA.
(12) If the GPS survey project includes any
surveys using conventional or terrestrial horizontal surveying techniques, copies of all
field notes, and associated data must be submitted. This would include eccentric point
establishment and reduction. Polaris, solar,
or direct observational data to establish
azimuth marks shall also be submitted.
(13) When the GPS survey project includes
surveys performed using conventional differential leveling techniques, copies of all field
notes, and associated data must be submitted.
An example of this would be a vertical tie
from a nonoccupied bench mark to a GPS
station.
(14) A tabulation of the results of the repeat
base line comparisons will be included in the
project report.
(15) A minimally constrained (free) least
squares, three- (3-) dimensional adjustment
will be submitted in the form of the input and
output files.
AUTHORITY: section 60.451.3., RSMo
2016.* Rule originally filed as 10 CSR 304.050. Original rule filed May 3, 1994, effective Dec. 30, 1994. Moved to 2 CSR 9062.050 and amended: Filed Dec. 1, 2016,
effective June 30, 2017.
*Original authority: 60.451.3, RSMo 1984, amended 2013.