19 MAC Pt. 7, R. 3.11

Effective Date

Year: 2026Length: 409 wordsOfficial source

Cite as 19 Miss. Admin. Code Pt. 7, R. 3.11

Effective Date The amended version of this regulation shall supersede prior versions and become effective on July 1, 2026. Source: Miss. Code § 25-43-3.101, et seq. (Rev. 2024). EXHIBIT A Title 19 Mississippi Administrative Code, Part 7, Chapter 4 (MH 2008-1) “Bonding and Insurance Requirements” is incorporated herein through reference thereto. EXHIBIT B PLEASE READ AND FOLLOW THE INSTRUCTIONS FOR THE MODULAR HOME PROPERTY LOCATOR/ CERTIFICATE OF INSTALLATION FORM RETAILER/DEVELOPER/MODULAR CONTRACTOR: To ensure compliance with Regulation ME-2007- 3 and Miss. Code Ann. § Section 75-49-9(2), it shall be the responsibility of each Retailer/Developer/ Modular Contractor to submit a legible and properly completed Modular Home Property Locator/ Certificate of Installation, signed by the Retailer/Developer/Modular Contractor and the installer/transporter, to the Factory-Built Home Division of the State Fire Marshal’s Office for all modular homes within seventy-two (72) hours (3 days) of the installation of the home during regular business hours. The Retailer/Developer/Modular Contractor is required to provide the following: a. Request in writing a serial numbered Installation Decal from the Factory-Built Home Division of the State Fire Marshal’s Office prior to the home being delivered to the site. b. Attach a copy of the Installer’s Certification from the Manufacturer to the Modular Home Property Locator/Certificate of Installation. INSTALLER/TRANSPORTER: To ensure compliance with Regulation ME-2007-3 and Miss. Code Ann. § Section 75-49-9(2), it shall be the responsibility of each Installer/transporter to submit a legible and properly completed Modular Home Property Locator/Certificate of Installation form to the Factory- Built Home Division of the State Fire Marshal’s Office for all Secondary Installations of factory-built, modular homes within seventy-two (72) hours (3 days) of the installation of home during regular business hours. The Installer/Transporter is required to provide the following: a. Request in writing a serial numbered Installation Decal from the Factory-Built Home Division of the State Fire Marshal’s Office prior to the home being delivered to the site. b. Submit a copy of the Installer’s Certification from the Manufacturer to the Modular Home Property Locator/Certificate of Installation. To access the State Fire Marshal’s web site for the Modular Home Property Locator/Certificate of Installation form type in the following address link: www.mid.ms.gov/sfm/pdf/ModularHomePropertyLocator-Certificate.pdf To e-mail a scanned copy of the properly completed and signed Modular Home Property Locator/Certificate of Installation, please use the following address: manhousing@mid.ms.gov EXHIBIT C EXHIBIT D Part 7 Chapter 4: (MH -2008-1) Bonding and Insurance Requirements for Manufacturers, Modular Contractors, Developers, Retailers, and Transporters or Installers of Factory-Built Homes and/or Modular Homes.