19 MAC Pt. 7, R. 5.06.7
-9: Pier Footings
Cite as 19 Miss. Admin. Code Pt. 7, R. 5.06.7
-9: Pier Footings
A. Every pier shall be supported by a footing. All I-beam support piers and marriage line
support piers shall be constructed on footings of solid concrete not less than 16 x 16 inches that
consist of a 4-inch-thick concrete pad, precast, ABS, or poured in place concrete slab, unless
other footing types and sizes are allowed. All footings are to be placed on stable undisturbed
soil or properly compacted fill material. The fill material must be compacted to 90 percent of
maximum relative density to adequately provide the proper load bearing capacity for the support
pier footings.
B. Perimeter pier footings are required to be a 4”x 8”x 16” concrete pads or equivalent size
ABS pads.
C. Prepare the surface of the footing making sure the top surface of the footing upon which
the pier will be installed is level, flat and smooth.
D. Poured-in-place concrete runners used as footings for a new Factory-Built shall meet the
guidelines of the manufacturer’s installation instructions. For all used Factory-Built homes the
concrete runners shall be eight (8) to twelve (12) inches thick with a 28-day compressive
strength of 3,000 pounds per square inch (psi) and shall be required to contain proper
reinforcing steel. For 3000 psi concrete, it is generally recommended to wait at least 28
days before applying significant weight, as this is the standard curing time for concrete to
reach its full strength and achieve optimal durability. However, it is recommended to consult
with a local concrete supplier or local building code office for determining accurate periods of
cure time required before setting up a Factory-Built home on the poured concrete slab or
runners.
E. If an existing concrete slab is to be used as the foundation of the home and the thickness
and the existence of reinforcing steel cannot be readily determined, all I-beam support piers
shall be required to be placed on solid concrete footings, 4 x 16 x 16 inches, or equivalent size
ABS pads. In addition, the top elevation of the existing concrete slab shall be a minimum of
4 inches higher than the existing grade of the soil around the slab.