22 MAC Pt. 23, R. 8.11
Oil and Gas Exploration and Production:
Cite as 22 Miss. Admin. Code Pt. 23, R. 8.11
Oil and Gas Exploration and Production:
A. Directional drilling from existing sites, canals, bayous, deeper bay waters, or non-marsh
locations must be used in preference to temporary roadbeds.
B. Temporary roadbeds (preferably plank roads) to provide access from land must be used
in preference to dredging canals for access to well sites.
C. Proposed road alignments must use upland or previously disturbed marsh areas.
D. All streams must be bridged or provided with culverts to prevent alterations to tidal
influence and natural drainage patterns.
E. Culverts or similar structures must be installed under the road at appropriate intervals to
prevent blockage of surface drainage or tidal flow, with all culvert openings being
subsequently maintained.
1. Appropriate intervals are never more than two hundred and fifty (250) feet apart.
F. No hydrocarbons, hydrocarbon containing substances, drilling muds, drill cuttings, or
toxic substances are allowed to flow into coastal wetlands or other wetlands adjacent to
coastal wetlands.
G. Upon completion or abandonment of wells in coastal wetlands or other wetlands adjacent
to coastal wetlands, all unnecessary equipment must be removed; the well site, levees,
roads, and work areas must be restored to the conditions that supported the type of
wetland that existed prior to development.
H. Existing navigable waters must be used for access to oil and gas extraction sites in
preference to new dredging or excavation.
I. Sensitive coastal wetlands and other productive shallow water areas must be avoided
when siting extraction facilities.
1. Directional drilling must be employed when the shorelines of barrier islands or
beaches, small fishing banks, hard banks, or reefs would otherwise be disturbed.
J. No discharge is permitted into coastal wetlands or wetlands adjacent to coastal wetlands
of cuttings, drilling fluids, produced waters, sanitary wastes, contaminated deck drainage,
or any other materials that are associated with oil and gas operations.
1. Non-contact cooling waters may be allowed when permitted for discharge under
the National Pollutant Discharge Elimination System program.
K. No structures are authorized to be placed either temporarily or permanently on the top of
small fishing banks.
1. Small fishing banks are generally five hundred (500) acres or less.
L. For exploration and production activities in close proximity to sensitive coastal wetlands
or fishing areas, uncontaminated drill cuttings must be:
1. Shunted away from sensitive areas and discharged at or near the bottom or
2. Transported to shore or to less sensitive offshore locations.
M. Drilling and production structures, and oil pipelines must not be placed within one (1)
mile of the bases of live reefs.
N. All facilities, obstructions, or debris that could impair recreational or commercial fishing
must be removed or terminated beneath the water bottom.
1. Whenever this is not practicable, a lighted buoy must mark them to prevent
fouling of fishing gear.
O. All pipelines placed in coastal wetlands must be buried.
P. See also Requirements for Dredging and Excavation (Rule 8.18).
MISS. CODE ANN. ยงยง49-15-304, 49-27-59, 57-15-6, 57-15-10.