15 MAC Pt. 10, R. 3.2.9

Instruments, Fittings and Control Requirements: Instruments, fittings and

Year: 2026Length: 30 wordsOfficial source

Cite as 15 Miss. Admin. Code Pt. 10, R. 3.2.9

Instruments, Fittings and Control Requirements: Instruments, fittings and controls for each boiler installation shall comply with the requirements of the ASME Heating Boiler Code, Section IV, Part HG, Article 6.
15 MAC Pt. 10, R. 3.2.9: Instruments, Fittings and Control Requirements: Instruments, fittings and | Justis AI