28 MAC Pt. 301, R. 28.8
Removal of Material from Port by Contractor
Cite as 28 Miss. Admin. Code Pt. 301, R. 28.8
Removal of Material from Port by Contractor
Any contractor attempting to remove material previously identified by the Contract
Monitor as belonging to the Port, will be challenged by the Access Control Security Officer to
present authorization (Gate Pass/Dock Receipt) from the Port. Should said authorization not be
available, the contractor will be denied exit and the Captain of Security will be notified, investigate
the incident, and contact the Contract Monitor/Port Operations for guidance. (NOTE: All such
incidents will be documented as an irregularity as outlined elsewhere in this manual.)
9479638.2