15 MAC Pt. 10, R. 3.4.1
Inspection of Boilers and Pressure Vessels
Cite as 15 Miss. Admin. Code Pt. 10, R. 3.4.1
Inspection of Boilers and Pressure Vessels
1.
All boilers and pressure vessels, not exempt by the Act, shall be inspected
internally and externally, as provided by these rules and regulations, by an
authorized inspector. The owner or user shall prepare each boiler or pressure
vessel for such inspection and for appropriate pressure tests, whenever necessary.
Following is a recommended general guide in preparing equipment for an internal
inspection:
2.
Boilers
a.
Cool the boiler, furnace and setting sufficiently to prevent damage to any
part.
b.
Drain and wash thoroughly internal parts to be inspected.
c.
Remove manhole and handhole plates, and wash out drain and inspection
plugs.
d.
Remove a sufficient number of grates or internally fired boilers, as
requested by the inspector.
e.
Remove brickwork, refractory and insulation, as required by the
inspector, to determine condition of boiler, headers, tubes, furnace,
structural supports, and other parts.
f.
Prevent leakage of water, steam or vapors into boiler interiors that would
endanger personnel.
g.
Before opening the manhole or handhole covers and entering any parts of
the steam-generating unit connected to a common header with other
boiler, the non-return and steam stop valves must be closed, tagged,and
preferably padlocked, and drain valves or cocks between the two valves
opened. The feed and check valves must be closed, tagged, and
preferably padlocked, and drain valves or cocks located between the two
valves opened. After draining the boiler, the blowoff valves shall be
closed and padlocked. Blowoff lines, where practicable, shall be
disconnected between pressure parts and valves. All drains and vent lines
shall be opened.
h.
Prepare the pressure gauge for testing.
3.
Pressure vessels
a.
Remove manhole and handhole plates, cleaning and inspection plugs.
b.
Clean internal surfaces and adequately ventilate all interior surfaces.
c.
Isolate the unit to the extent that internal temperature, pressure and
environment are not injurious to personnel and are under strict control
during complete inspection.
d.
Remove linings or coverings, as required by the inspector, to determine
true physical condition of the vessel and its components.
e.
Make protective and regulating controls readily accessible for inspection.
f.
Prepare the pressure gauges for testing.