2 MAC Pt. 903, R. 5.1

Approved Practices

Year: 2026Length: 323 wordsOfficial source

Cite as 2 Miss. Admin. Code Pt. 903, R. 5.1

Approved Practices. A. Erosion Control Practice Number Practice Name Cost Share Rate SEC-1 Terraces 60% SEC-2 Field Borders 60% SEC-3 Grassed Waterways 60% SEC-4 Conservation Tillage (No-Till) 60% SEC-5 Water & Sediment Control Basins 60% SEC-6 Establishment of Permanent Vegetation 60% SEC-7 Critical Area Planting 60% SEC-8 Tree Planting 60% SEC-9 Grade Stabilization Structure 60% SEC-10 Strip Cropping Systems 60% SEC-11 Reduced Tillage 60% SEC-12 Cover & Green Manure Crop 60% SEC-13 Pasture & Hayland Planting 60% SEC-14 Streambank & Shoreline Protection 60% SEC-15 Chiseling and Subsoiling 60% SEC-16 Heavy use Area Protection 60% SEC-17 Forest Land Erosion Control System 60% SEC-18 Prescribed Grazing 60% SEC-19 Nutrient Management 60% B. Water Conservation Practice Number Practice Name Cost Share Rate WC-1 Irrigation Land Leveling 60% WC-2 Irrigation System, Tailwater Recovery 60% WC-3 Irrigation Water Conveyance Pipe Line 60% WC-4 Irrigation Storage Reservoirs 60% WC-5 Establishment of Permanent Vegetation 60% WC-6 Tree Planting 60% WC-7 Ponds 60% WC-8 Animal Waste Control Facilities 60% WC-9 Diversions 60% WC-10 Livestock Pond Renovation 75% C. Wildlife Practice Number Practice Name Cost Share Rate W-1 Field Borders 60% W-2 Filter Strip 60% W-3 Prescribed Burning 60% W-4 Wildlife Upland Habitat Management 60% W-5 Wildlife Wetland Habitat Management 60% D. Water Quality Practice Number Practice Name Cost Share Rate WQ-1 Integrated Crop Management 60% WQ-2 Fencing 60% WQ-3 Trough or Tank 60% WQ-4 Agrichemical Mixing Center 60% WQ-5 Structure for Water Control 60% WQ-6 Buffer Zone 60% WQ-7 Check Dam 60% WQ-8 Concrete Grid & Modular Pavement 60% WQ-9 Constructed Wetland 60% WQ-10 Detention Basin 60% WQ-11 Lined Waterway 60% WQ-12 Parking Lot Storage 60% WQ-13 Paved Flume 60% WQ-14 Rock Outlet Protection 60% WQ-15 Slope Drain 60% WQ-16 Sub Surface Drain 60% WQ-17 Water Bar 60% WQ-18 Retention Basin 60% WQ-19 Silt Fence 60% WQ-20 Permanent Seeding 60% WQ-21 Stream Crossing 60% WQ-22 Chemical Container/Used oils-Lubricants Recycling WQ-23 Cattle Feed & Waste Management Facility 60% WQ-24 Well Decommissioning 60%
2 MAC Pt. 903, R. 5.1: Approved Practices | Justis AI