33 MAC Pt. 12
Drinking Water Systems Improvements Revolving Loan Fund Program Regulations
Cite as 33 Miss. Admin. Code Pt. 12
- 1 -
FINAL
STATE OF MISSISSIPPI
LOCAL GOVERNMENTS AND RURAL WATER SYSTEMS IMPROVEMENTS BOARD
Title 33: Public Health - Local Governments & Rural Water Systems Improvements Board
Part 12: Drinking Water Systems Improvements Revolving Loan Fund Program Regulations
STATE OF MISSISSIPPI
DRINKING WATER SYSTEMS IMPROVEMENTS
REVOLVING LOAN FUND PROGRAM
FINAL
FFY-2020 INTENDED USE PLAN
Approved by the board on
March 20, 2020
LOCAL GOVERNMENTS AND RURAL WATER SYSTEMS
IMPROVEMENTS BOARD
P. O. BOX 1700 SUITE U-232
JACKSON, MISSISSIPPI 39215-1700
- 2 -
(Blank)
- 3 -
FINAL
STATE OF MISSISSIPPI
LOCAL GOVERNMENTS AND RURAL WATER SYSTEMS IMPROVEMENTS BOARD
Title 33: Public Health - Local Governments & Rural Water Systems Improvements Board
Part 12: Drinking Water Systems Improvements Revolving Loan Fund Program Regulations
DRINKING WATER SYSTEMS IMPROVEMENTS REVOLVING LOAN FUND
FFY-2020 INTENDED USE PLAN
TABLE OF CONTENTS
I.
INTRODUCTION
A. State of Mississippi’s Drinking Water State Revolving Fund
B. Program Overview
C. Public Input, Review, and Comment Procedures
II.
GOALS OF MISSISSIPPI’S DRINKING WATER SYSTEMS
IMPROVEMENTS REVOLVING LOAN FUND (DWSIRLF)
PROGRAM
A. Basic Goals
B. Long-Term DWSIRLF Goals
C. Short-Term DWSIRLF Goals
III.
STRUCTURE OF MISSISSIPPI DWSIRLF
A. DWSIRLF Loan/Operations Fund
1. Types of Eligible Projects:
2. Set-aside Accounts:
B. DWSIRLF State Match Funds
C. Drinking Water Systems Emergency Loan Fund (DWSELF)
IV.
FINANCIAL STATUS OF THE DWSIRLF
A. Source and Use of Fund
1. Federal Allotment
2. State Match Requirements
3. Loan Increase Reserve
B. Financial Planning Process
1. Efficient Bond Management
2. Interest Rate Determination
3. Investment
C. Financial Terms of Loans
1. Funding Limit
2. Interest Rate
3. Administration Fee
4. FFY-2020 Appropriation Special Provisions
5. Other Related Issues
- 4 -
- 5 -
V.
SET-ASIDE ACTIVITIES
A. Administration
B. Small System Technical Assistance
C. State Program Management
D. Local Assistance and Other State Programs
VI.
PRIORITY SYSTEM
A. Funding and Ranking Rationale
1. Funding Lists and Bypass Procedure
2. FFY-2020 Green Infrastructure Requirement
3. Loan Decreases
4. Match for Special Appropriations Project (SPAP) Grants
5. Subsidization from FFY-2020 Federal Appropriation
B. Priority System Categories
C. Priority Ranking Criteria
D. Priority System Deadlines
VII.
FFY-2020 PRIORITY LIST
VIII.
EXPECTED PUBLIC HEALTH OUTCOMES & PERFORMANCE
MEASURES
APPENDICES
A. FFY-2020 Anticipated Available Funds for the Mississippi Drinking
Water Improvements Revolving Loan Fund (DWSRF) Program
B. PROJECTED SCHEDULE OF OUTLAYS
C. PROJECTED PAYMENT (FEDERAL LETTER OF CREDIT)
SCHEDULE
D. PROJECTED SCHEDULE OF DRAWDOWNS AGAINST FEDERAL
LETTER OF CREDIT
E. MISSISSIPPI SMALL SYSTEMS TECHNICAL ASSISTANCE SET-
ASIDE WORK PLAN
F. MISSISSIPPI STATE PROGRAM MANAGEMENT SET-ASIDE
ANNUAL WORK PLAN
G. LOCAL ASSISTANCE AND OTHER STATE PROGRAMS ANNUAL
WORK PLAN
H. MISSISSIPPI STATE PROGRAM SET-ASIDE MATCH
REQUIREMENTS – MISSISSIPPI 1:1 REQUIREMENT FOR FFY-2020
STATE PROGRAM MANGEMENT SET-ASIDE
I. COORDINATION SCHEDULES FOR JOINTLY FUNDED PROJECTS
J. DRINKING WATER SYSTEMS EMERGENCY LOAN FUND
PROGRAM
K. CERTIFICATIONS
L. ASSISTANCE FOR SMALL AND DISADVANTAGED COMMUNITIES
DRINKING WATER GRANT PROGRAM
I.
Introduction
A. State of Mississippi’s Drinking Water State Revolving Loan Fund
The Safe Drinking Water Act Amendments of 1996 (SDWA) established the national
Drinking Water State Revolving Fund (DWSRF) Program. That program allows the
Environmental Protection Agency (EPA) to make capitalization (Cap) grants to states to,
in turn, provide low cost loans to public water systems to help achieve or maintain
compliance with SDWA requirements. Accordingly, the State Legislature (through
Section 41-3-16, MS Code of 1972 Annotated) created what is now called the Drinking
Water Systems Improvements Revolving Loan Fund (DWSIRLF) Program, to receive the
federal DWSRF capitalization grants from EPA, and to provide low cost loans to the state’s
public water systems to finance needed infrastructure improvements. This legislation also
allows the DWSIRLF, subject to the authority of State Law, to make loans that may utilize
additional subsidization beyond standard DWSIRLF loans as well as setting appropriate
criteria to determine eligible recipients.
That same legislation created the "Local Governments and Rural Water Systems
Improvements Board" (Board), to oversee the administration of the DWSIRLF Program.
The Mississippi State Department of Health (Department), as the state’s drinking water
primacy agency, supplies the staff and facilities necessary to administer the program. The
Board is composed of the following nine (9) members: the State Health Officer, who shall
serve as chairman of the Board; the Executive Director of the Mississippi Development
Authority; the Executive Director of the Department of Environmental Quality; the
Executive Director of the Department of Finance and Administration; the Executive
Director of the Mississippi Association of Supervisors; the Executive Director of the
Mississippi Municipal League; the Executive Director of the American Council of
Engineering Companies; the State Director of the United States Department of Agriculture,
Rural Development; and a manager of a rural water system. Each agency director may
appoint a designee to serve in his or her place on the Board. The rural water system
manager is appointed by the Governor. In the creation of the Program it was the intent of
the Legislature that the Board endeavor to ensure that the costs of administering the
DWSIRLF Program are as low as possible in order to provide the water consumers of
Mississippi with safe drinking water at affordable prices.
As a condition of receiving the DWSRF Cap grants, the SDWA requires that each state
annually prepare an Intended Use Plan (IUP) designed to outline how a state will utilize
DWSRF funds to assist in protecting public health. The DWSIRLF Fund consists of both
state and federal funds. Federal funds are provided to the states in the form of awarded
Cap grants. Each state’s allotment of those grants is based on EPA’s Needs Survey that is
performed every four years. State matching funds totaling 20% of the federal grant amount
to that state are required to be deposited into the Fund and have historically been provided
through the issuance of bonds; however, in 2014 the State legislature began providing the
required State match funds as a direct agency appropriation. The purpose of this IUP is to
convey the State of Mississippi’s (State) DWSRF plan for Federal Fiscal Year (FFY) 2020
to EPA, other state agencies, the state’s public water supplies, and the general public.
B. Program Overview
The basic framework under which the DWSIRLF Program operates is established by two
documents. The first document is the Drinking Water State Revolving Fund Loan Program
Operating Agreement (Operating Agreement) between the Mississippi State Department
of Health and the Environmental Protection Agency, Region IV. The current Operating
Agreement was agreed to by both parties and approved on February 3, 2009. The
Operating Agreement establishes the basic framework of the DWSIRLF that is not
expected to change from year-to-year. The second document is the IUP which describes
how the State of Mississippi will use the funding received from the EPA Cap grant which
is received each year.
The amount of the FFY-2020 Cap Grant from EPA for Mississippi is not known at this
time; therefore, the grant amount received by Mississippi in FFY-2019 will be used in this
IUP for planning purposes until the actual Cap Grant amount is known. A Cap Grant
amount of $11,853,000 will be used for these purposes. The FFY-2020 DWSRF Cap grant
application will request an amount of $11,853,000 or the actual amount allocated to the
State of Mississippi. These funds must be used in the time period of July 2020 through
June 2025. The FFY-2020 IUP will show in detail the goals (basic, long-term and short-
term), the structure, and the financial status of the Program; the role of the set-aside
activities within the state; and most importantly, the distribution of funds towards public
water system improvements projects and the criteria used to determine their ranking within
the priority system. Those desiring to receive a copy of this document may contact Ulysses
Conley, Program Support Specialist, at (601) 576-7518.
The United Stated Congress passed the America’s Water Infrastructure Act of 2018 which
was signed by the President on October 23, 2018. This Act authorizes increased funding
of the DWSRF through FFY-2021. This act approves the following:
1. Extends the maximum loan amortization to 30 years, or 40 years for disadvantaged
communities. These maximums may not, however exceed the design life of the
project;
2. Extends repayment initiation to 18 months after project completion;
3. Codifies Davis-Bacon for DWSRF-funded construction projects;
4. Makes American Iron and Steel requirements “permanent” until 2023;
5. States that additional subsidy for state-defined Disadvantaged Communities must
be between 6% and 35% of CAP grant (if enough Disadvantaged Communities
qualify), up from the current rate of 0% to 30%.
C. Public Input, Review, and Comment Procedures
To ensure that the public has an ample opportunity to review and comment upon the IUP,
the Department and the Board follows the requirements of the “Mississippi Administrative
Procedures Law” prior to final submission of the IUP to EPA. A public notice period of at
least twenty-five (25) days allows for review and comment before an oral proceeding.
After adoption by the Board, a second filing with the Secretary of State’s Office occurs; if
no additional comments are received the IUP becomes law 30 days after the second filing.
Public notice will be given in The Clarion Ledger, a newspaper of statewide circulation,
for written and oral comments on this IUP. An oral proceeding is scheduled for 9:00 a.m.
on Friday March 20, 2020. A transcript of the oral proceeding oral proceeding, recording
any comments and recommended solutions, will be submitted to EPA along with the Final
IUP. Those desiring to receive a copy of the oral proceeding transcript should contact
Ulysses Conley, Program Support Specialist, at (601) 576-7518. A copy of the
“Mississippi Administrative Procedures Law” may be obtained from the Mississippi
Secretary of State’s Office, and can also be found on the Mississippi State Department of
Health’s website at www.healthyms.com/dwsrf.
II.
Goals of Mississippi’s Drinking Water Systems Improvements Revolving Loan Fund
(DWSIRLF) Program
The Board has established certain goals for the DWSIRLF Program with the objective of
improving the Program on an ongoing basis. The goals have been classified into three
categories that include basic, long-term, and short-term. These goals were developed to
address the necessary requirements of federal and state regulations, as well as the state’s
need and desire to maintain and enhance the Program. Congress and the State of
Mississippi have placed particular emphasis on assisting smaller drinking water systems
under the DWSIRLF to ensure that these systems have adequate technical, managerial, and
financial resources to achieve or maintain compliance and provide safe drinking water.
A. Basic Goals
1. Maintain a financially sound DWSIRLF in perpetuity; meet a portion of the
drinking water needs in the state within a reasonable period of time; and fund
projects in order of public health importance. Attaining these basic goals will help
ensure that Mississippi's drinking water supplies remain safe and affordable, and
that those public water systems that receive funding will be properly operated and
maintained.
2. Determine the DWSIRLF’s yearly interest rate, taking into consideration that it
must be competitive with the private sector, as well as with other available funding
sources within the state. This will ensure the timely use of available funds, as well
as ensure sufficient income is generated to provide for the perpetuity of the Fund.
Further details of loan terms and priority ranking are outlined in Sections IV and
VI of this IUP.
B. Long-Term DWSIRLF Goals
1. Enhance and/or improve loan application and repayment procedures. MSDH
intends to periodically evaluate the existing Program requirements and procedures
to determine ways to streamline the DWSIRLF Program’s application and
repayment procedures, making it more user-friendly, attractive and beneficial to
loan recipients, while ensuring continued compliance with all federal and state
regulations and requirements.
2. Program staff are exploring the feasibility of creating a universal web-based
ranking form for all lending agencies within the state. The proposed form would
ask a few simple questions, recommend a lending program based on the responses,
and submit the ranking form to the appropriate agency. This could help potential
loan recipients find the program that is right for their water utility, quickly and
easily.
3. Continue programs to protect the State’s ground water by using designated funds
from the Cap grants to fund abandonment and plugging of wells. Since FFY-2012
the Program has been using the Local Assistance and Other State Programs set-
asides to properly abandon inactive wells and open holes. Inactive wells and open
holes are potential avenues of contamination to the aquifer and a danger to humans.
This program is a worthwhile endeavor that will protect the source water of the
state’s water supplies.
4. Develop a tracking system to manage programmatic and financial documentation.
A tracking system will provide DWSIRLF loan recipients and their representatives
an opportunity to view the status and/or location of documents mailed to the
Program for review and/or processing. This tracking system will also assist
Program staff in tracking/monitoring program documentation reviews as well as
disbursements.
5. Develop a comprehensive engineering project manager (PM) manual. The Bureau
of Public Water Supply continues to make changes to the personnel involved with
the DWSIRLF Program as the need arises. A comprehensive manual for project
management will help ensure new PMs will have all the necessary tools and
reference materials at their disposal to ensure the ongoing project flow will be
uninterrupted. Since regulations change periodically, once the manual is completed
it will be maintained by assigned staff.
C. Short-Term DWSIRLF Goals
1. Enhance and/or improve the Program by making it more attractive to public water
systems. The evaluation of this goal will be based on input received from “one-on-
one” visits with staff at engineering firms, town conferences, and general feedback
obtained from loan recipients and consulting engineers during the loan process.
These meetings will be conducted with firms currently participating in the
DWSIRLF Program to collect data regarding the effectiveness of the loan
application process currently being implemented.
2. Explore the possibility of developing web-based checklists and forms to
electronically store and process project management information.
3. Assist applicants in addressing capacity assessment deficiencies found during
annual inspections by using technical solutions afforded by the technical assistance
set-aside contractors. New or forthcoming regulations may make this a key goal in
the future.
4. Train new staff members using available training sessions provided by EPA Region
IV staff.
5. Meet special funding goals: Executive Order 13858, Strengthening Buy-American
Provisions for Infrastructure Projects, may introduce additional provisions that will
require additional compliance monitoring, thus creating an additional burden to the
Program.
6. Automatic repayment collection system: Continue the implementation of an
automatic repayment collection system; many loan recipients in the Program’s
repayment mode desire an automatic electronic repayment system as is available in
the public sector. The DWSIRLF, by instituting this payment option, will ensure a
more timely receipt of monthly repayments, as well as make the repayment process
much more convenient for our loan recipients.
III.
Structure of the Mississippi DWSIRLF
The Mississippi DWSIRLF is structured around three separate funds that sustain the
Program and help it achieve the basic, short-term, and long-term goals. The funds are
broken down further into designated accounts, each having a specific function.
A. DWSIRLF Loan/Operations Fund
Monies in the Fund support a majority of the functions of the DWSIRLF. These functions
include: program administration, set-aside operations, and most importantly provide
disbursements to public water systems for eligible projects. The DWSIRLF is a
reimbursement program, meaning that after the loan is awarded, costs associated with
planning, designing and constructing the project are reimbursed to the recipient. Cap grants
from EPA, loan repayments and interest earnings are deposited into this Fund.
1. Types of Eligible Projects:
Many types of projects are eligible for funding by the Program. For a more detailed
explanation of eligible costs for projects, please reference Appendix A of the
DWSIRLF Regulations.
2. Set-aside Accounts:
The set-aside accounts reside under the umbrella of the Fund and are distinctly
designated by reporting categories. A listing of the set-asides taken by Mississippi
includes the following for FFY-2020:
a. Administrative Set-aside: Provides financial support to administer the loan
Program and other non-project-related activities.
b. Small System Technical Assistance Set-aside: Provides technical assistance to
small water systems.
c. State Program Management Set-aside: Provides additional financial support to
MSDH – Bureau of Public Water Supply for Public Water System Supervision
Program.
d. Local Assistance and Other State Programs: Provides funding for the
implementation of a wellhead protection program.
B. DWSIRLF State Match Funds
As required by the SDWA, the State of Mississippi must match the Cap grant with state
funds equaling 20% of the federal allotment. While state match monies are maintained
separately from the Fund for accounting purposes, they are still considered to be under
the “umbrella” protection of the DWSRF Fund.
C. Drinking Water Systems Emergency Loan Fund (DWSELF)
The DWSELF Fund contains state monies that are utilized only for public water supply
loans which meet the definition of emergency. For further information see Appendix
J.
IV.
Financial Status of the DWSIRLF
This section outlines all sources of funding available to the DWSIRLF Program and
indicates intended uses. This section also describes the financial assistance terms available
through the Program.
A. Source and Use of Funds
Using the FFY-2020 EPA Capitalization Grant allotment for Mississippi of $11,853,000
a 20% state match of $2,370,600 is required; this provides an anticipated amount of
$14,223,600 for both loans and set-aside activities.
With $2,646,480 ($474,120-4% Admin; $237,060-2% Small Systems Technical
Assistance; $1,185,300-10% State Program Management; $750,000-Local Assistance)
being utilized for set-aside activities, $11,606,488 will remain for loans to Mississippi
public water supplies; additionally, unobligated funds from the previous year, anticipated
loan repayments and interest earnings (all of which are not classified as state match) will
also be available as additional funding sources.
The FFY-2020 “Set-aside” use for the standard Cap grant is outlined in Section V of this
IUP. Necessary work plans showing utilization of these funds are found at the end of this
IUP.
1. Federal Allotment
With the FFY-2020 Capitalization Grant for Mississippi of $11,853,000 the state
match requirement to federal grant funds (cash draw ratio) will be 20.46% state
match funds to 79.54% federal grant funds; this requirement will be stated in the
grant application.
2. State Match Requirements
The 2020 State Legislature authorized the issuance of in bonds to be used as match
for the FFY-2020 EPA Capitalization Grant. An amount of $2,369,000 is required
to fully match the FFY-2020 EPA Capitalization Grant.
3. Loan Increase Reserve
Beginning in FFY-2003 the Board began to make loan awards after approval of the
facilities plans and loan application, rather than after completion of the project
design. This change in the loan award sequence increased the likelihood that bid
overruns on some projects could be greater than the construction contingency
included in the loan agreement. In order to be able to provide loan increases (when
needed) to existing loans, the Board intends to set-aside the amount indicated in
Appendix A for such loan increases; loan increases will be awarded on a first-come,
first-served basis. Any funds not obligated for these purposes by the end of the
fiscal year may be made available for new loan awards to the highest ranking
project(s) that is ready for loan award at the time funds become available.
B. Financial Planning Process
In accordance with the Board's desire to maintain a financially sound DWSIRLF loan
Fund in perpetuity, while at the same time meeting a substantial portion of the drinking
water needs in the state within a reasonable period of time, the following financial
decisions were made regarding the Fund:
1. Efficient Bond Management
The Board intends that the MSDH apply for the entire state Cap grant allotment
under the federal DWSRF, including the set-asides described in Section V below.
State bond proceeds obtained shall be deposited into the DWSIRLF Fund and shall
be used as the state match for federal DWSRF Cap grants.
2. Interest Rate Determination
It is the Board’s intention to adjust interest rates such that the demand will equal
the funds available. In order to ensure that this interest rate will be at or below the
prevailing market rates at the time a loan is made, this rate will be compared to the
twenty-year (20) triple-A rated, tax-exempt insured revenue bond yield published
by fmsbonds, Inc. (fmsbonds Online, https://www.fmsbonds.com/market-yields/).
3. Investment
Investment Procedures for Excess Cash - According to the State Treasurer, the
excess cash in the Fund is invested by the State Treasurer in securities prescribed
in Section 27-105-33, et. Seq., of the Mississippi Code of 1972 Annotated, as
amended. The securities in which state funds may be invested include certificates
of deposit with qualified state depositories, repurchase agreements (fully secured
by direct United States Treasury obligations, United States Government agency
obligations, United States Government instrumentalities or United States
Government sponsored enterprise obligations), direct United States Treasury
obligations, United States Government agency obligations, United States
Government instrumentalities or United States Government sponsored enterprise
obligations, and any other open-ended or closed-ended management type
investment company or investment trust registered under the provisions of 15
U.S.C. Section 80(a)-1 et. Seq, provided that the portfolio is limited to direct
obligations issued by the United States of America, United States Government
agency obligations, United States Government instrumentalities or United States
Government sponsored enterprise obligations and to repurchase agreements fully
collateralized by the securities listed above for repurchase agreements.
C. Financial Terms of Loans
The following terms will be used for the purpose of making loans to the public water
systems within the State of Mississippi.
1. Funding Limit
Under state law, the Board has the discretion to set the maximum amount for
DWSIRLF loans. For FFY-2020 a maximum loan amount of $5,000,000 per
borrower has been set by the Board. The Board may allow (on a case-by-case basis
if requested by the borrower and the need has been justified) the maximum loan
limit to be exceeded by a vote of the Board. Furthermore, during FFY-2020, no
more than one loan per borrower will be allowed. At the end of the fiscal year, in
the event that funds are available, systems previously receiving an award during
FFY-2020 may obtain an additional award(s) or an increase to a previous FFY-
2020 award, if no other eligible systems are evident.
2. Interest Rate
All loan terms will be at 1.95% annual interest rate, compounded monthly, with a
maximum 30-year repayment period, or 40 years for disadvantaged communities.
These maximums may not, however exceed the design life of the project. Interest
will accrue based on the current loan agreement in conjunction with the DWSIRLF
Regulations.
3. Administration Fee
Revenues to pay for Program administrative costs will be collected through an
administration fee of 5% of the initial loan principal. This fee will be collected
from the interest portion of loan repayments on all FFY-2020 loans.
4. FFY-2020 Appropriation Special Provisions
The Federal 2020 appropriations bill has not been finalized and the final EPA FFY-
2020 Cap Grant allotment amounts and any additional federal requirements are not
known. It is anticipated that subsidization requirements will be required for the
FFY-2020 Cap Grant; the subsidization is expected to be in the form of “principal
forgiveness”, “negative interest rates”, or a combination of the two. The anticipated
amount of subsidization is expected to be a minimum of 20% of the Cap Grant
amount. If the FFY-2020 Cap Grant is $11,853,000 the subsidization amount
would be $2,369,000 (20%) of the Cap Grant amount. Furthermore, all loans made
with all or part FFY-2020 federal appropriation funds will include the Davis-Bacon
Act, American Iron and Steel, and signage requirements. Appropriate language
will be added to all FFY-2020 loan agreements identifying the additional
responsibilities for loan recipients. “Green Infrastructure” requirements are not
expected to be an appropriation requirement. However, the Program will continue
to encourage those types of projects to seek funding from the DWSIRLF.
5. Other Related Issues
a. Type of Assistance Provided: The assistance to be provided under the
DWSIRLF Program will be loans to public, tax-exempt entities which are
authorized under state law to collect, treat, store and distribute piped water for
human consumption; able to enter into a DWSIRLF loan agreement; and have
the ability to repay the DWSIRLF loan. With the funds provided through the
FFY-2019 federal appropriation, the DWSIRLF will be able to make loans that
will have an amount of “principal forgiveness”, if the loan recipient is
designated a disadvantaged community. To insure that the assistance is
dispersed as far as possible, the Board has set a limit ($500,000) which a loan
recipient may receive in subsidy for one loan. Once the limit of the
appropriation subsidy funds has been reached for FFY-2020, loans will return
to the DWSIRLF’s standard terms without principal forgiveness. In all cases,
loans will be for the construction of eligible drinking water production,
treatment and distribution facilities.
b. Project Costs Eligibility: Eligible/allowable project costs will include those
costs that are eligible, reasonable, necessary, and allocable to the project, within
the established project scope and budget, in conformance with the DWSIRLF
regulations and approved by MSDH.
c. Loan Participation: DWSIRLF loan participation will be at 100% of eligible
project costs, less any funding made available from other agencies for these
same eligible project costs.
d. Pre-Award Costs: Project costs incurred prior to loan award will be DWSIRLF
loan eligible provided:
i.
The debt is for work under a construction contract for which the “Notice
To Proceed” was issued on or after October 1, 2020, and the DWSIRLF
loan is awarded by September 30, 2021.
ii.
The project is in compliance with all applicable DWSIRLF Program
regulations and obtains MSDH approval of all applicable documents
prior to award of the DWSIRLF loan.
iii.
The prospective loan recipient agrees that by incurring costs prior to
loan award, it proceeds at its own risk and relieves the Board, the
Department, and the Department’s staff of all responsibility and liability
should such costs later be determined unallowable for any reason or
should such funding not become available for any reason.
iv.
The prospective loan recipient agrees that by incurring costs prior to
loan award, no future commitment of funding a refinanced project is
provided.
e. Priority List: The FFY-2020 Priority List expires on September 30, 2020.
Projects listed in the FFY-2020 Priority List that do not receive funding by this
date will not be funded under the FFY-2020 funding cycle and will be subject
to the requirements of subsequent IUPs and Priority Lists. Detailed information
for the FFY-2020 DWSIRLF projects is shown in Section VIII of this IUP. To
facilitate the use of FFY-2020 federally appropriated funds, the priority list may
be adjusted to allow funds to be disbursed according to the federal requirements.
V.
Set-Aside Activities
The SDWA allows each state to set-aside up to 31 percent of its federal Cap grant to support
non-project-related drinking water programs which includes administration of the loan
program, technical assistance to public water systems, state program management, and
other special activities. If the FFY-2020 EPA Capitalization Grant amount is $11,853,000,
the state plans to use $2,646,480 of the FFY-2020 Federal Capitalization grant to support
the non-project-related drinking water programs activities. These non-project-related
programs will be operated by MSDH within the agency itself or through contracts with
other agencies or organizations. Contracts between the MSDH and other agencies or
organizations will be approved by the Board. Work plans showing how the set-asides funds
will be expended are included as appendices within this IUP; additionally, progress reports
will be included in the Annual Report. The state has elected not to take any additional set-
asides from the FFY-2020 Local Assistance and Other State Programs set-aside, but
reserves the right to make revisions to utilize additional funds from this set-aside. The
amount of funds used from the FFY-2020 Cap Grant-Local Assistance and Other State
Programs assistance set-aside will be $750,000 (6.26%).
A. Administration
The SDWA-DWSRF amendments in the 2017 Water Infrastructure Improvements for the
Nation Act (Pub. L. 114-332) (2017 WIIN Act – EPA memorandum dated June 6, 2017)
states that the "Administrative" amount used may be the greater of $400,000 or 4% of the
Cap Grant amount. The State plans to use the maximum allowable for "Administrative"
purposes from the FFY2020 Cap Grant. Costs beyond this amount will be paid from the
funds generated by the 5% administrative fee taken from loan repayments.
The state will continue to exercise its right to reserve the Administrative amounts from
previous Cap Grants. Reserving previous years’ 4% administrative set-aside can ensure
that the Program will continue to operate with an adequate DWSIRLF staff for proper
management of the Program.
B. Small System Technical Assistance
The state will use the Small Systems Technical Assistance (2%) set-aside from the FFY-
2020 Cap Grant ($237,060) to provide technical assistance to public water systems serving
areas with populations of 10,000 or less. With approval by the Board, the state intends to
use this set-aside to fund contracts for the following activities: Special Technical
Assistance to Referred Systems; Board Management Training for Water System Officials;
On-Site Technical Assistance; PEER Review Program; Hands-on Operator Training; and
Asset Management Training. Each of these activities is described in detail in the State of
Mississippi’s Small Systems Technical Assistance Set-Aside Work Plan included as
Appendix F to this IUP.
C. State Program Management
The state intends to use the full 10% set-aside from the FFY-2020 Cap grant ($1,185,100),
as authorized by Section 1452(g) (2) of the Safe Drinking Water Act of 1996 for State
Program Management. The funds will be used for Public Water System Supervision
(PWSS) activities conducted under Section 1443(a) of the Act. These activities are
described in more detail in the State of Mississippi’s State Program Management Set-aside
Annual Work Plan included as Appendix G to this IUP.
The SDWA-DWSRF amendments in the 2018 Water Infrastructure Improvements for the
Nation Act (Pub. L. 114-332) (2017 WIIN Act – EPA memorandum dated June 6, 2017)
removed the requirement for the State 1:1 match for the 10% State Program Management
set-aside.
D. Local Assistance and Other State Programs
The state intends to use $750,000 (6.26%) of the 15% set-aside amount which is allowed
from the FFY-2020 Cap grant to provide funding for wellhead protection projects
throughout the state. These funds will be used to properly abandon inactive wells that pose
a risk to existing active public water supply source water wells, as well as the environment.
VI.
Priority System
The SDWA provides the state with the flexibility to determine how to best utilize the Cap
grant. To meet the particular and unique issues facing the public water systems in
Mississippi, SDWA requirements allow states to give priority to those projects which:
1. address the most serious risk to human health;
2. are necessary to ensure compliance with the SDWA requirements;
3. assist systems most in need, on a per household basis.
A. Funding and Ranking Rationale
Projects will be placed on the fundable portion of the Priority List according to both priority
ranking and readiness to proceed. The term “ready to proceed” means that all loan
application requirements established in the Program regulations are met, and all documents
necessary for loan award are approved. If a project cannot reasonably be expected to meet
the Priority System deadlines, then the project will not be placed on the current year’s
Priority List, but will be placed on the Planning List. It is the Board’s judgment with input
from the DWSIRLF staff as to when a project is ready to proceed. Loans will be awarded
to projects (within available funds) that are above the funding line on the current year’s
Priority List, that have met all Priority System deadlines and are ready to proceed.
Additionally, when potential loan recipients are deciding on the needs for their public water
supplies, they should ensure that all public health and state safe drinking water laws are
followed. If a state regulation becomes an additional requirement of Mississippi’s public
water supplies, appropriate planning and design of the project(s) will be necessary in order
to receive funding. However, if it is understood that a proposed project is designed to meet
specific SDWA compliance requirement(s) unrelated to a state requirement, the Board may
waive the state requirement upon request from the potential loan recipient. This waiver
would require concurrence from the Bureau of Public Water Supply.
1. Funding Lists and Bypass Procedure
Should any projects on the FFY-2020 Priority List (which are above the funding
line) fail to comply with the deadlines in Section D, the project shall be bypassed
and the funds reserved for said project will be released. Released funds will first
be made available to listed projects, to ensure that all projects above the funding
line meeting priority system deadlines are funded. Any remaining funds will be
made available to the highest ranking project(s) shown below the funding line that
is ready for loan award at the time funds become available. If no projects above
the funding line are ready for loan award at the time funds become available,
projects shown below the funding line will be funded on a first-come, first-served
basis as they become ready for loan award and until the released funds are awarded.
This same process will continue as each deadline passes and released funds become
available.
2. FFY-2020 Green Infrastructure Requirement
The FFY-2020 federal appropriation is not expected to require that a percentage of
the funds appropriated for the Revolving Funds be designated for projects that
exhibit the elements of green infrastructure, water efficiency improvements, energy
efficiency improvements or other environmentally innovative projects. However,
projects that wish to be classified in the following elements will be reported as
green infrastructure to the EPA through its “Project and Benefits Report Database”
and noted in the future annual report. Projects may exhibit one or more of the
“green” elements and the details of the project’s “green” content will be identified
in the business case required for each project if the recipient so chooses.
- Green infrastructure projects include a wide array of practices at multiple
scales; green infrastructure projects will manage wet weather and will maintain
and restore natural hydrology by infiltrating, evapotranspiring and harvesting and
using storm water. On a regional scale, green infrastructure is the preservation
and restoration of natural landscape features, such as forests, floodplains and
wetlands, coupled with policies such as infill and redevelopment that reduce
overall imperviousness in a watershed. On the local scale, it may consist of site-
and neighborhood-specific practices, such as bio-retention, trees, green roofs,
permeable pavements and cisterns.
- Water efficiency projects are designed to use improved technologies and
practices to deliver equal or better services with less water. It encompasses
conservation and reuse efforts, as well as water loss reduction and prevention, to
protect water resources for the future.
- Energy efficiency projects are designed to use improved technologies and
practices to reduce the energy consumption of water projects, use energy in a
more efficient way, and/or produce/utilize renewable energy.
- Environmentally innovative projects include projects that demonstrate new
and/or innovative approaches to deliver services or manage water resources in a
more sustainable way.
Projects desiring to be classified as “green” will be judged for eligibility based on
the guidance supplied by the EPA and that is available at our website
www.healthyms.com/dwsrf.
Systems
desiring
“Green
Infrastructure”
classification will be required to present a “business case” establishing justification
for the classification request. Guidance for establishing a “business case” is
available to assist potential loan recipients in preparation of the documentation.
3. Loan Decreases
Any funds recovered from loan decreases during the year will be used:
a) first to fund bid overruns, if funds from the loan increase reserve are not
sufficient to cover the bid overruns;
b) then to ensure that all projects above the funding line meeting the priority
system deadlines are funded (for at least the amount shown on the priority list);
and
c) then to fund other loans and/or increases on a first-come, first-served basis.
Any funds not obligated for these purposes may be made available for new loan
awards ready to proceed on a first-come, first-served basis.
4. Match for Special Appropriations Project (SPAP) Grants
On October 10, 2001, EPA issued policy memorandum DWSRF 02-01 to notify
regions and states of a change in policy regarding the use of DWSRF monies for
providing local match for SPAP grants. This change in EPA policy will allow the
state to use non-federal, non-state match DWSIRLF funds to provide loans that can
be used as local match for SPAP grants awarded for drinking water projects.
These non-federal, non-state match DWSIRLF loan funds may be made available
to eligible SPAP grant recipients that are on the priority list for use as local match
funds for their SPAP grants, provided the grant is for loan eligible work. Such
projects will be funded in accordance with the Priority System and until all non-
federal, non-state match monies have been obligated or demand for such funds has
been met.
5. Subsidization from FFY-2020 Federal Appropriation
The FFY-2020 EPA Capitalization Grant mandates a minimum of 26% of the Grant
be provided as additional subsidization to disadvantaged communities. Based on
the Grant of $11,853,000, a minimum of $2,370,600 in subsidization is required.
The DWSIRLF’s subsidization will be in the form of “Principal Forgiveness” (PF)
to individual public water supplies that are considered disadvantaged communities
and which received reimbursements with Federal Cap grant funds during the
construction of the project. If the amount of PF which a project is eligible exceeds
the amount of Federal Cap grant funds which it received, the amount of PF extended
will be limited to the amount of Federal Cap grant funds used for reimbursement.
Subsidization may be used over a two year period. Subsidization remaining from
a previous year may be awarded to loans which are eligible for PF over a two year
time period. Subsidization for FFY-2020 may be awarded to projects eligible for
PF in FFY-2020 and FFY-2020.
Disadvantaged Community Program
During FFY-2020, the following Principal Forgiveness (PF) methodology will
be used to meet the requirements of both the American’s Water Infrastructure
Act of 2018 and the Consolidated Appropriations Act of 2020 for providing
subsidy for disadvantaged systems. A minimum of 26% subsidy will be made
available and up to 55% can be subsidized to eligible recipients.
The amount of PF for which a potential “Loan Recipient” (LR) may be eligible
will be determined by calculating the percentage of the “Median Household
Income” (MHI) of the potential LR versus the MHI of the State of Mississippi
($43,567) as a whole.
90% < LR MHI < 100%
- 15% Principal Forgiveness
80% < LR MHI < 90%
- 25% Principal Forgiveness
70% < LR MHI < 80%
- 35% Principal Forgiveness
LR MHI < 70%
- 45% Principal Forgiveness
This PF will be extended to projects until all mandated subsidy funds are
obligated. The amount of PF given will be assigned at loan award and will not
change after the project goes to the bid phase. Additionally, due to the limited
amount of PF funds, the maximum amount of PF funds a loan recipient may
receive for a project will be set at $500,000. Once subsidy funds are depleted,
only standard loans will be made with DWSIRLF funds.
In the event that a LR declines their loan that includes PF, the released PF may
be reallocated to other projects for the present fiscal year that are eligible for
PF or the PF may be carried over to projects for the next fiscal year.
If returned PF funds are reallocated to projects awarded during the existing
fiscal year. The reallocation of PF will be given first to projects which did not
receive their full allowable amount based on the above table up to the maximum
allowed limit.
If all projects have received their full allowable amount, returned PF funds may
be reallocated to projects awarded PF during the existing fiscal year based on a
percentage of the individual LR’s initial loan amount to the total loan amount
of loans awarded PF during the fiscal year.
In all cases, the amount of PF which is awarded to a project may not exceed the
amount of Federal Cap grant funds which the project was reimbursed during
the construction of the project.
B. Priority System Categories
Projects in Category I are funded each year to the extent funds are available. Projects
in Categories II through XI are ranked in priority order; that is, all Category II projects
are ranked higher than Category III projects, etc. Ranking is established in like manner
through all remaining categories. Adjustments are made as necessary to comply with
small community set-aside provisions of the Federal SDWA and as established by the
Board [Section 1542(a) (2) of SDWA]. As stated previously, the order of Categories
II - XI is intended to give highest priority to those projects that address the most serious
risks to human health. Projects within each category will be ranked as described in
Section C.
1. Category I - Segmented Projects
This category of projects includes any remaining segments of projects that
previously received funding for an integral portion of that project, and are necessary
for the entire project to be functional. Projects will be funded under this category
in order of their regular priority ranking provided they meet the deadlines
established in Section D.
In order to maintain continuity, the Board intends to make some amount of funds
available for each ongoing-segmented project. Preference in the amount of funds
to be provided will be given to the projects that received the earliest loan award for
their initial segment.
2. Category II - Previous Year Certified Projects
Priority for this category will be given to the previous year Category II projects to
the maximum extent practicable. This category of projects includes projects that:
(1) were listed immediately below the funding line on the previous year’s Priority
List within an amount of approximately 25% of that year’s total available funds;
(2) met all Priority System deadlines in the previous fiscal year; and (3) were not
funded due to lack of DWSIRLF funds or did not receive an assurance of CDBG,
ARC, RUS, or other match funding in the previous fiscal year. Within this
category, projects will be ranked according to the current Priority Ranking Criteria.
3. Category III - Primary Drinking Water Standards
This category includes projects to facilitate compliance with Primary Drinking
Water Standards. To qualify for this category, projects must correct deficiencies
resulting in non-compliance with the primary drinking water standards. Depending
on the nature of the project, additional treatment requirements may be necessary as
part of the proposed project.
4. Category IV - One Well
This category includes projects to provide additional water supply to systems that
have neither a backup well or an MSDH-approved emergency tie-in to another
system to ensure safe drinking water; thereby protecting the health of the existing
population. Depending on the nature of the project, additional treatment
requirements may be necessary as part of the proposed project.
5. Category V – Pressure Deficiencies
This category includes projects to correct documented deficiencies that result in
existing systems routinely failing to maintain minimum acceptable dynamic
pressure. Experience has shown that failure of water systems to maintain minimum
acceptable dynamic pressure is the major cause of system contamination in
Mississippi. System contamination that results from inadequate water system
pressure is considered by the MSDH to be one of the most serious drinking water-
related threats to public health in Mississippi
6. Category VI - Source Water Protection Projects
This
category
includes
projects
to
manage
potential
sources
of
contaminants/pollutants and/or prevent contaminants/pollutants from reaching
sources of drinking water. To be eligible for loan participation, potential
contaminants/pollutants and source water protection areas must have been
identified in the public water systems Source Water Assessment Plan Report
(SWAPR) prepared by the Mississippi Department of Environmental Quality’s
Groundwater Planning Branch (DEQ-GPB). If the public water system has not
received its SWAPR from the DEQ-GPB yet, or has documentation that may
change its SWAP, it shall provide in the facilities plan suitable documentation of
potential sources of contaminants/pollutants that is acceptable to the DEQ-GPB
before the project will be deemed eligible.
The projects will be ranked: first in order of the highest source water classification
that would be negatively impacted by source water contaminants; secondly, within
each classification in order of the public water systems susceptibility assessment
ranking as determined by the DEQ-GPB; and thirdly, within each susceptibility
assessment ranking in order of the highest number of connections served by the
public water system. Source water classifications will be ranked in the following
order: surface water sources; shallow (generally ≤ 300’ in depth) unconfined water
wells; shallow (generally ≤ 300’ in depth) confined water wells; and deep confined
water wells.
7. Category VII - System Capacity Expansion To Serve Existing Unserved
Residences/Businesses
This category includes projects to either expand existing system capacity or
construct a new drinking water system to ensure safe drinking water (source,
treatment and/or distribution) to serve existing residences/businesses in currently
unserved areas.
8. Category VIII - Back-up Water Supply Sources Projects
This category includes projects to provide additional supply to systems with
insufficient back-up water supply sources to ensure safe drinking water, and
thereby protect the health of the existing population. As a minimum, a system using
ground water should be able to lose any one of the wells supplying the system and
still maintain minimum acceptable dynamic pressure throughout the entire system.
9. Category IX – Existing Facilities Upgrades (Meeting Primary Standards)
This category includes projects to rehabilitate, replace, protect or upgrade
deteriorated, worn, aged or obsolete equipment, facilities, etc., to assure continued,
dependable operation of water systems where such systems are already meeting
Primary Drinking Water Standards. Depending on the nature of the project,
additional treatment requirements may be necessary as part of the proposed project.
10. Category X - Fluoride Addition
This category is for projects that either rehabilitate existing fluoride treatment
facilities at well or treatment plant sites, or add new facilities to existing well or
treatment plants.
11. Category XI - Secondary Drinking Water Standards Projects
This category includes projects to provide treatment that brings systems into
compliance with Secondary Drinking Water Regulations. Depending on the nature
of the project, additional treatment requirements may be necessary as part of the
proposed project.
12. Category XII – Consolidation Projects
This category includes projects to consolidate separate systems into a single system
for purposes other than those related to Categories II through IX. Consolidation
will also be considered in establishing priority ranking within all categories, as
described in the Priority Ranking Criteria in Section C.
13. Category XIII – Other
This category includes projects that do not meet the criteria of any other listed
category, and have been determined loan eligible in accordance with the DWSIRLF
loan program regulations.
C. Priority Ranking Criteria
The criteria for ranking projects within each category is intended to give priority to projects
that: (1) benefit the most people per dollar expended; (2) assist systems most in need on a
per household affordability basis as required by the SDWA (3) use consolidation with other
systems to correct existing deficiencies and improve management; (4) take into
consideration the system’s current capacity; (5) encourage participation in short-term and
long-term technical assistance programs; and (6) encourage participation in the Drinking
Water Needs Survey. These considerations are addressed by the Priority Ranking Criteria
in the following manner:
1. Benefit/Cost
Benefit/Cost points assigned to each project will be determined using the following
formula:
Benefit/Cost Points
=
Number of benefiting connections
Total eligible cost of improvements (in $1.0 millions)
The number of benefiting connections must be included in the facilities plan
submitted by the applicant; be defined as the sum of individual connections
currently experiencing deficiencies that will be corrected by the improvement;
and include only existing residences, businesses, and public buildings. Applicants
must furnish information (including hydraulic analysis, if necessary) to support
their estimate of the number of benefiting connections. The total eligible cost is in
millions of dollars (i.e., $800,000 = $0.8 M).
2. Affordability Factor
An affordability factor will be assigned to each project to reflect the relative needs
of applicants on a per household basis. The Benefit/Cost points calculated in
Section C.1. will be adjusted using the affordability factor in the following formula:
Adjusted Benefit/Cost Points = (Affordability Factor) x (Benefit/Cost Points)
The affordability factor used in the calculation is defined as the ratio of the “Median
Household Income” (MHI) for the State of Mississippi ($43,567) to the MHI for
the affected community. The affordability factor used in the calculation will be no
less than 1.0 and no greater than 1.5.
3. Consolidation
Any project that includes consolidation (ownership and management) of separate
existing systems into a single system will receive consolidation points equal to 0.5
times the Adjusted Benefit/Cost points assigned to the project. The purpose of
assigning consolidation points is to promote reliability, efficiency and economy of
scale that can be achieved with larger water systems while discouraging the
proliferation of numerous separate small systems with their inherent inefficiencies
and limitations. Projects, in any priority category, that do not include consolidation
will receive zero consolidation points in the final calculation of total priority points.
Consolidation Points = 0.5 x (Adjusted Benefit/Cost Points)
4. System Capacity
Any project that includes scope of work to address critical design capacity issues
(systems that are currently overloaded or within two (2) years of reaching their
current design capacity, as determined by MSDH) will receive additional priority
points equal to 25% of the Adjusted Benefit/Cost points assigned to the project.
Documentation of the system capacity analysis and recommendations to address
the design capacity issues must be addressed in the facilities plan to be eligible for
these additional priority points.
System Capacity Points = 0.25 x (Adjusted Benefit/Cost Points)
5. Participation in Short-Term & Long-Term Assistance Programs
The MSDH, with the Board’s approval, has contracted with Community Resources
Group (CRG) to provide both short-term and long-term assistance to designated
water systems in the state based on their scores on the latest Capacity Assessment
Form (CAF). This assistance is provided at no cost to the water systems.
Participation by the water systems in these assistance programs is voluntary;
however, any water system that has participated in either of these assistance
programs within the past two years will be eligible to receive additional priority
points equal to 5% of their Adjusted Benefit/Cost Points. Water systems that have
implemented all of the recommendations made by CRG will receive additional
priority points equal to 5% of their Adjusted Benefit/Cost Points for a total of 10%.
Documentation of participation in either of these assistance programs and
implementation of the recommendations made by CRG must be included in the
facilities plan before additional priority points will be granted.
Assistance Points = ** x (Adjusted Benefit/Cost Points)
** 5% if the water system participates in the assistance, or 10% if the
water system participates in the assistance and implements all
recommendations
6. Participation in the EPA or MSDH Drinking Water Needs Survey
Any water system that participated in the most recent MSDH Public Water Supply
Improvements Needs Survey or the EPA Drinking Water Needs Survey by
satisfactorily completing and returning this form to MSDH will be eligible to
receive additional priority points equal to 10% of their Adjusted Benefit/Cost
Points.
Needs Survey Points = 0.10 x (Adjusted Benefit/Cost Points)
7. Ranking Within Each Category
Within each category, projects will be ranked in order based on the total points
assigned the project using the following formula:
Total Priority Points = Adjusted Benefit/Cost Points + Consolidation Points +
System Capacity Points + Assistance Program Points + Needs Survey Points
Projects receiving the most priority points will be given the highest ranking on the
Priority List. In case of a tie in the number of priority points, projects with the
lowest median household income will receive the highest ranking.
8. Small Community Set-Aside
Following completion of the ranking process, the Priority List will be reviewed to
determine if at least 15% of available funding for projects above the funding line is
for public water systems which regularly serve fewer than 5,000 people, which the
Board has defined as a small community for the purposes of this set-aside. If this
is not the case, the Priority List will be adjusted by exchanging the lowest ranking
projects above the funding line that serve 5,000 or more with the highest ranking
projects below the funding line that serve fewer than 5,000, until the 15%
requirement is satisfied.
D. Priority System Deadlines
1. By October 1, 2019, a complete DWSIRLF facilities plan, prepared in accordance
with the DWSIRLF loan program regulations, must be submitted to MSDH.
A complete DWSIRLF facilities plan includes: all Intergovernmental Review
(IGR) agency comments; proof of publication of advertisement for public hearing;
a transcript of the public hearing comments; copies of any comments received from
the public; and a summary of how each comment was addressed. The loan
applicant should provide a copy of the facilities plan to USDA - Rural Utilities
Service (RUS); if the loan applicant has an existing debt with RUS, their approval
to incur the additional debt must be obtained and provided as part of the plan.
Any significant changes made to the facilities plan (i.e., changes in the chosen
alternative location of the facility, cost increases that substantially affect the
financial capability of the loan recipient) after this date will be considered a first
submittal of the facilities plan. The loan applicant will then be considered to be in
violation of the Priority System deadline and the project will be placed on the
planning portion of the priority list. If the change is made after adoption of the IUP,
funds reserved for this project may be released and made available to other projects.
This deadline also applies to all projects competing for released funds during FFY-
2020 and to be able to qualify for the Previous Year Certified Projects Category in
the FFY-2019 IUP.
2. By June 1, 2020, a completed DWSIRLF loan application and all associated
documents as described in the DWSIRLF regulations must be submitted to the
Department. Prior to preparing these documents, the potential applicant and/or its
registered engineer must request and receive a DWSIRLF application and
guidance. It is recommended that they request a pre-application conference with
DWSIRLF staff as early in the application process as practical. This deadline also
applies to all projects competing for released funds during FFY-2020 and to be able
to qualify for the Previous Year Certified Projects Category in the FFY-2019 IUP.
3. By August 1, 2020, all approvable documents and responses to comments necessary
for loan award must be submitted to the Department for its review and approval.
This deadline also applies to all projects competing for released funds during FFY-
2019 and to be able to qualify for the Previous Year Certified Projects Category in
the FFY-2019 IUP.
VII. FFY-2020 Planning List
FINAL
Fiscal Year - 2020 Mississippi Drinking Water Systems Improvements
Revolving Loan Fund Program Priority List
Category III: Primary Drinking Water Standards Projects
Project
Project Description
Zip Priority Service Area Eligible PF
Green
Loan Amount Statewide Cum. $
Code Points Population
Amount
Project
Requested
City of Hattiesburg
Rehab. Water Treatment No. 1
39403
45951
$500,000
$0
$4,601,677
$4,601,677
Combined Utilities
Distribution System Improvements
39452
$0
$0
$1,100,000
$5,701,677
Combined Utilities
Water Well and Elevated Storage Tank
39452
$0
$0
$1,600,000
$7,301,677
Town of Roxie
New Water Well
39661
$91,000
$0
$260,000
$7,561,677
Poorhouse Water Assn
Water System Improvements
38902
$335,300
$0
$1,341,200
$8,902,877
Kipling Water Association
Water Treatment System Improvements
39328
$691,884
$0
$1,537,520
$10,440,397
S E Greene Water Authority
Rehab Treatment Facility/Water Line Extension
39452
$100,578
$0
$670,519
$11,110,916
Brooklyn Utility Association
Water System Improvements
39425
$222,000
$0
$1,480,000
$12,590,916
Cedar Grove-Harmony Water Assn
Water Distribution Improvements
39429
$151,200
$0
$1,008,000
$13,598,916
Friars Point, Town of
Distribution System Improvements
38631
$500,000
$0
$1,473,600
$15,072,516
Chunky, Town of
New Well and Repaint Standpipe
39323
$203,389
$0
$813,555
$15,886,071
North Benton County WA
Construct Media Filtration Treatment Facilities
38603
$292,500
$0
$650,000
$16,536,071
Grenada-Bogue Basin/Gore Springs 400 G.Well/200,000 G. Tnk/Other Incidentals
38901
$500,000
$0
$2,785,980
$19,322,051
Senatobia Lake Estates, Inc.
New Well/4000 Gal. Pressr Tank/Chem. Feed/w
38668
$77,550
$0
$517,000
$19,839,051
Category IV: One Well Projects
Project
Project Description
Zip Priority Service Area Eligible PF
Green
Loan Amount Statewide Cum. $
Code Points Population
Amount
Project
Requested
Improve Water Association
New 600 GPM Water Well
39478
$168,000
$0
$480,000
$20,319,051
Category V: Pressure Deficiencies Projects
Project
Project Description
Zip Priority Service Area Eligible PF
Green
Loan Amount Statewide Cum. $
Code Points Population
Amount
Project
Requested
McLain, Town of
New 8" Val on Existn Mains/Meters/1000 Ft.
39456
$63,950
$0
$142,111
$20,461,162
Lawrence County Water Assn.
Installation of New 6" PVC Pipe
39654
$40,511
$0
$270,071
$20,731,233
Walnut Grove, Town of
Replace Waterline & Install Autoread Meters
39489
$209,119
$0
$836,476
$21,567,709
Young's Water Sewer Dist.
New Well
38922
$265,393
$0
$758,265
$22,325,974
Friday March 20, 2020
Page 1 of 2
Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses
Project
Project Description
Zip Priority Service Area Eligible PF
Green
Loan Amount Statewide Cum. $
Code Points Population
Amount
Project
Requested
Bay Springs, City of
Water System Improvements-Install New Water
39422
$244,211
$0
$542,714
$22,868,688
Jackson County Utility Authority
Distribution System Improvements
39567
43680
$0
$0
$6,250,000
$29,118,688
West Jackson County UD
Water System Improvement
39564
25000
$0
$0
$5,000,000
$34,118,688
Combined Utilities
Distribution System Improvements
39452
$0
$0
$3,750,000
$37,868,688
---------------------------------------------------------------------------------------- $46,826,076 Funding Line--------------------------------------------------------
Oceans Springs, City of
Replace Water Mains/tie-in with WJCUD
39566
21000
$0
$0
$8,690,000
$46,558,688
Category VIII: Back-up Water Supply Sources Projects
Project
Project Description
Zip Priority Service Area Eligible PF
Green
Loan Amount Statewide Cum. $
Code Points Population
Amount
Project
Requested
Walls Water Association
New Water Treatment Plant
38680
$0
$0
$1,832,500
$48,391,188
Category IX: Existing Facilities Upgrade (Meeting Primary Standards)
Project
Project Description
Zip Priority Service Area Eligible PF
Green
Loan Amount Statewide Cum. $
Code Points Population
Amount
Project
Requested
Central Rankin Water Association
Rehab/Paint Elevated Tank
39167
$0
$0
$190,000
$48,581,188
Short Coleman Park Water Assn.
Repaint 2 Elevated Tanks/250,000/500,000 GAL
38852
$84,287
$0
$561,915
$49,143,103
Category XIII: Other
Project
Project Description
Zip Priority Service Area Eligible PF
Green
Loan Amount Statewide Cum. $
Code Points Population
Amount
Project
Requested
Central Water Association
Install New Systematic ARM System
39350
22000
$358,750
$0
$1,435,000
$50,578,109
Glendale Utility District
Installation of New Automated Meters
39401
$0
$0
$367,000
$50,945,103
Kilmichael, Town of
Install New Radio Read Meters
39747
$82,066
$0
$234,475
$51,179,578
Jayess-Topeka Tilton W/A
Replace water Meters
39641
$154,313
$0
$617,250
$51,796,828
Friday March 20, 2020
Page 2 of 2
FFY-2020 Priority List
FINAL
Fiscal Year - 2021 and After Planning List
Mississippi Drinking Water Systems Improvements Revolving Loan Fund Program
(Projects included on the Planning List did not meet the September 30, 2019 deadline for submission of a complete facilities plan, or had multiple requests and
asked to be placed on the Planning List. These projects have been ranked on the Planning List based on information provided on the Request for Ranking Form.
A determination of project eligibility cannot be completed until the facilities plan has been submitted and reviewed.)
Category II: Previous Year Certified Projects
Project
Project Description Zip Priority Service Area
Eligible PF
Green
Loan Amount Statewide Cum. $
Code Points Population
Amount
Project
Requested
St. Thomas Water Assn., Inc.
Water System Improvements
39041
732 $20,343 $0 $135,623 $135,623
Category III: Primary Drinking Water Standards Projects
Project
Project Description
Zip Priority Service Area Eligible PF
Green
Loan Amount Statewide Cum. $
Code Points Population
Amount
Project
Requested
Lexington, City of
Water System Improvements
39095
$111,173
$0
$247,050
$382,673
NE Itawamba Water Assn., Inc.
Water System Improvements
38847
$371,532
$0
$1,061,520
$1,444,193
Braxton, Town of
Construction of New Well
39044
$0
$0
$819,000
$2,263,193
Category V: Pressure Deficiencies Projects
Project
Project Description
Zip Priority Service Area Eligible PF
Green
Loan Amount Statewide Cum. $
Code Points Population
Amount
Project
Requested
Aberdeen, City of 400 GPM Well/100,000 Gal. Elev. Tank/Rehab Lines
39730
$370,487
$1,481,949
$3,745,142
Valley Park Water Association, inc. Water System Improvements
39177
448 $125,055 $0 $500,221 $4,245,363
Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses
Project
Project Description
Zip Priority Service Area Eligible PF
Green
Loan Amount Statewide Cum. $
Code Points Population
Amount
Project
Requested
Batesville, City of
Installation of Water lines
38606 31582
$31,250
$125,000
$4,370,363
Batesville, City of
Installation of Water Lines
38606 26319
$37,500
$150,000
$4,520,363
Batesville, City of
Rehab/Replacement of Existing Facilities
38606 14356
$68,750
$275,000
$4,795,363
Batesville, City of
Rehab Existing Facilities
38606 11279
$87,500
$350,000
$5,145,363
Batesville, City of
500,000 Gallon Elevated Tank
38606 5264
$187,500
$750,000
$5,895,363
Friday March 20, 2020
Page 2 of 2
Bear Creek Water Assn., Inc.
Replace Tank With New 2 Mil Gal Tank
39046 1534
45000
$0
$0
$4,890,000
$10,785,363
Mt. Olivet Water Association
New Well/Paint Elevated Tank
38606
$129,010
$0
$516,040
$11,301,403
Lumberton, City of
Replace Existing Water Lines/Mains
39455
$500,000
$0
$3,453,197
$14,754,600
Leesburg Water Association
Replace Approx. 265,000 LF Water Mains W/4"- 39145
$500,000
$0
$4,243,600
$18,998,200
Category VIII: Back-up Water Supply Sources Projects
Project
Project Description
Zip Priority Service AreaEligible PFGreen Loan Amount Statewide Cum. $
Code Points Population Amount
Project
Requested
Batesville, City of
Rehab Existing Infrastructure
38606 7896
$125,000
$500,000
$19,498,200
Batesville, City of
New 750 GPM Well
38606 7896
$125,000
$500,000
$19,998,200
Category IX: Existing Facilities Upgrade (Meeting Primary Standards)
Project
Project Description
Zip Priority Service AreaEligible PFGreen Loan Amount Statewide Cum. $
Code Points Population Amount
Project
Requested
Batesville, City of
Rehab Existing Facilities
38606 9629
$102,500
$410,000
$20,408,200
Mount Olive, Town of
Replacement of Water Lines
39119 2348
$80,962
$231,320
$20,639,520
Alcorn Co. Water Association
300,000 Gal Storage Tank/upgrade Facilities
38834 1187
$318,275
$1,273,101
$21,912,621
Alcorn Co. Water Association
Renovate Elevated tanks/Replace Water Lines
38834 1155
$218,230
$872,920
$22,785,541
Hatten Water Association
Water System Improvements
39168 1154
$62,228
$0
$414,850
$23,200,391
Harrison County Development
Paint 2 Elevated Storage Tanks
39503
$0
$0
$354,675
$23,555,066
Mendenhall, City of
New 500 GPM Well/250,000 Gal Tank/Treatmen 39114
$500,000
$2,634,100
$26,189,166
Friday March 20, 2020
Page 2 of 2
VIII. Expected Public Health Outcomes & Performance Measures
The objective of this program is to disperse all available loan and grant funds in a timely
manner in order to achieve the public health protection benefits resulting from the projects
identified in the FFY-2020 IUP, and to ensure compliance with loan agreements, as
required by state and federal laws and regulations.
By implementing the FFY-2020 IUP and funding projects shown on the FFY-2020 Priority
List (Section VII), the Board will have the means to plan for and fund projects that will
address the most serious public health risks facing the public water supply systems in the
state. Funding of the system projects will be determined by the amount of funding to be
received for FFY-2020.
The success of the DWSIRLF Program will be defined by the ability of the MSDH to
successfully meet commitments in the FFY-2020 DWSRF Work Plan.
Additionally, the majority of the projects as proposed should have minimal impact on the
environment due to the nature of their design. Where necessary, appropriate environmental
reviews will occur and proper permitting through the Mississippi Department of
Environmental Quality will be required to ensure minimal impact on the environment.
Appendices
Appendix A
FFY-2020 Beginning of the Year Anticipated Funds Report for the Mississippi Drinking
Water Improvements Revolving Loan Fund (DWSIRLF) Program
w/ FFY-2019 EPA Cap Grant Funds
October 1, 2019
FFY-2020 Funding (Federal and State) (Estimate, using FFY-2020 Allotment of $11,853,000)
**Required State Match (based on a the required match of 20% of $11,853,000)
+
$2,370,600
**Emergency Fund remaining (amount of any board-approved emergency fund remaining available to
be used as match)
+
$0
FFY2020 Cap Grant (Estimated, based on the FFY2020 DWSRF Allotment based on EPA
appropriation for MS which was $11,853,000; needed State match = $2,370,600)
+
$11,853,000
Total Federal and State Funds available in FFY-2020
for Loan Obligations & Set-asides:
$14,223,600
FFY-2020 Cap Grant Set-Asides (estimated based on maximum allowable amount or historical
amounts)
DWSRF Administrative Expenses [section 1452(g)(2) - 4%] (SDWA-DWSRF amendment to 2017
WIIN Act)
+
$474,120
Small Systems Technical Assistance [section 1452(g)(2) - 2%]
+
$237,060
Local Assistance and Other State Program [section 1452(g)(2) - 15%] (taking ~6.3%)
+
$750,000
State Program Management [section 1452(g)(2) -10%]
+
$1,185,300
Total FFY-2020 Cap Grant Set-Asides:
$2,646,480
Total Federal and State Funds Anticipated to be Available in FFY-2020
+
$14,223,600
Less FFY-2020 Set-asides:
-
($2,646,180)
Total Federal & State Funds Anticipated to be Available for Loan Obligation in FFY-2020:
$11,577,420
2020 DWSRF Funds (Anticipated)
Total Federal & State Funds Anticipated to be Available for Loan Obligation in FFY-2020:
+
$11,577,420
Unobligated Funds Carried Over from FFY-2019
+
17,714,188
Loan Repayments To Be Deposited (Anticipated)
10/1/19 - 9/30/20
+
$15,685,251
Interest on Fund To Be Deposited (Anticipated)
10/1/19 - 9/30/20
+
$1,849,217
2020 Loan Increase Reserve ($1.0m)
-
($1,000,000)
Total Funds Available for Loan Awards in FFY-2020 (Anticipated)
$46,826,076
FFY-2019 End-of Year Funds Report
Mississippi Drinking Water Improvements Revolving Loan Fund (DWSIRLF) Program
October 1, 2019
FFY-2019 Funding (Federal and State)
**2019 Legislated State Match (The MS Legislature authorized $1,000,000 in bonds to be
used as match for the program. $1,397,000 is still needed to fully match FFY2019 CAP Grant)
+
$2,397,000
FFY2019 Cap Grant (The FFY2019 Federal Cap Grant awarded was $11,845,000; needed State match
1,830,864 to draw funds)
+
$11,845,000
Total 2019 Federal and State Funds Available in FFY-2019 for Loan Obligations & Set-
asides
$14,242,000
FFY-2019 Cap Grant Set-Asides
No FFY2019 Cap Grant Funds or set-asides are shown in this report, these funds will normally not be
available until QTR1 of FFY2020. The FFY2019 Cap Grant set-asides shown below will become
available in QTR2 of FFY2020 when funds are matched.
DWSRF Administrative Expenses [section 1452(g)(2) - 4%] (SDWA-DWSRF amendment to 2017
WIIN Act)
+
$473,800
Small Systems Technical Assistance [section 1452(g)(2) - 2%]
+
$236,900
Local Assistance and Other State Program [section 1452(g)(2) - 15%] (taking ~8.2%)
+
$750,000
State Program Management [section 1452(g)(2) -10%]
+
$1,188,300
Total FFY-2019 Cap Grant Set-Asides
$2,646,480
Total Federal and State Funds Available in FFY-2019
+
$14,242,000
Less FFY-2019 Set-asides
-
($2,645,200)
Total Federal and State Funds Available for Loan Obligation in FFY-2019
$ 11,596,800
FFY2019 DWSRF Loan Funds
FFY2019 Federal and State Funds Available for Loan Obligation
+
$11,596,800
Unobligated Funds Carried Over from FFY-2019
+
($17,714,188)
Loan Repayments Deposited (Actual) 10/1/18 – 9/30/19
+
$15,685,251
Interest on Fund Deposited (Actual)
10/1/18 - 9/30/19
+
$1,849,217
FFY2019 Loan Decreases (actual)
10/1/18 - 9/30/19
+
$4,507,184
FFY2019 Loan Increases (actual)
10/1/18 - 9/30/19
-
($83,898)
FFY2019 Funds Available for Loan Awards
+
$54,705,855
Loan Awards made during FFY2019 (Initial)
-
($33,990,860)
Carryover Funds for Projects funded in FFY-2019
($17,714,188)
* Mississippi received the entire FFY2018 Cap grant
Appendix B
Part I
Projected Schedule of Outlays
for
Standard Capitalization Grant Set-Asides
FFY-2020 Set-asides
Administrative
$118,530
$118,530
$118,530
$118,530
$474,120
Small Sys. Tech Assist.
$59,265
$59,265
$59,265
$59,265
$237,060
State Program Mgmt.
$296,325
$296,325
$296,325
$296,325
$1,185,300
Local Asst. & Other St.
Programs
$187,500
$187,500
$187,500
$187,500
$750,000
Total Set-asides
$661,620
$661,620
$661,620
$661,620
$2,646,480
Federal
1Q FFY-20
2Q FFY-20
3Q FFY-20
4Q FFY-20
Total
Projected Schedule of Outlays
for
Standard Capitalization Grant Set-Asides
FFY-2020 Set-asides
Federal
1Q FFY-19
2Q FFY-19
3Q FFY-19
4Q FFY-19
Total
Administrative
$118,530
$118,530
$118,530
$118,530
$474,120
Small Sys. Tech Assist.
$59,265
$59,265
$59,265
$59,265
$237,060
State Program Mgmt.
$296,325
$296,325
$296,325
$296,325
$1,185,300
Local Asst. & Other St.
Programs
$187,500
$187,500
$187,500
$187,500
$750,000
Total Set-asides
$661,620
$661,620
$661,620
$661,620
$2,646,480
Appendix C
Projected Payment (Federal Letter of Credit) Schedule
(Schedule of Increases to ACH Ceiling)
FFY-2020
FFY-2020
Cap Grant
No. 1 of 4
1st Quarter
FFY-2019
$2,963,250
$2,963,250
FFY-2020
Cap Grant
No. 2 of 4
2nd Quarter
FFY-2019
$2,963,250
$5,926,500
FFY-2020
Cap Grant
No. 3 of 4
3rd Quarter
FFY-2019
$2,963,250
$8,889,750
FFY-2020
Cap Grant
No. 4 of 4
4th Quarter
FFY-2019
$2,963,250
$11,853,000
Appendix D
Projected Schedule of Drawdowns Against Federal Letter of Credit
(ACH Draw Schedule)
FFY-2020
Outlay
Quarter
Federal Outlay
Amount
Cumulative Outlay
Amount
1st Quarter
FFY-2020
$2,963,250
$2,963,250
2nd Quarter
FFY-2020
$2,963,250
$5,926,500
3rd Quarter
FFY-2020
$2,963,250
$8,889,750
4th Quarter
FFY-2020
$2,963,250
$11,853,000
Appendix E
Mississippi Small Systems Technical Assistance Set-Aside Work plan
INTRODUCTION
The Mississippi State Department of Health (MSDH), Bureau of Public Water Supply
(Department), proposes to use the Small Systems Technical Assistance Set-Aside of the
DWSRF in an assistance and training program directed at improving the technical,
managerial, and financial capabilities of small community public water systems in the state.
The goal of this program is to assure that assistance is provided to all small community
public water systems that require such assistance to maintain adequate technical, financial,
and managerial capabilities necessary to comply with requirements of the SDWA.
SELECTION PROCESS
The current technical assistance contracts expire on June 30, 2020.
Prior to the expiration of the existing contracts an Invitation for Bids (IFB) for the technical
assistance contracts will be sent out to potential contractors. All proposals will be evaluated
by the Department and recommendations for award will be presented to the Board (at a
regularly scheduled Board meeting); all contracts will be awarded.
The contracts for technical assistance are currently awarded to:
Small Systems Technical Assistance (long-term and intermediate technical assistance) –
Mississippi State University Extension Service;
Board Management Training Monitoring and Coordination for Water System Officials -
Mississippi State University Extension Service;
Hands-On Operator Training - Mississippi Rural Water Association, Inc.;
PEER Review Program for Public Water Supplies - Mississippi State University
Extension Service;
Asset Management – Mississippi Rural Water Association, Inc.
PROGRAM ACTIVITIES
The technical assistance program consists of five major categories of activities that will be
accomplished through contracts with qualified organizations that are experienced in
providing the type of support required by each activity. These categories may be updated
and/or revised as a result of work plan reviews that will be conducted annually during the life
of the program. Amendments will be submitted whenever activities or budgets change and
when required to extend the term of the work plan.
Small Systems Technical Assistance:
Comprehensive and Intermediate technical assistance shall be provided to an equivalent
of twelve (12) small public water systems annually.
1. Long-term technical assistance:
Comprehensive assistance must be provided to a minimum of six (6) small public
water systems for the contract period. The MSDH – Bureau of Public Water Supply
will provide the contractor a list of systems that are to receive this assistance. Within
30 days of the start date for that contract year, the contractor will identify, with the
help of MSDH, systems that will receive comprehensive technical assistance,
complete an initial assessment of the needs of each system and develop a work plan
for each water system. The contractor shall submit an assessment and work plan for
each system to MSDH for approval prior to initiating technical assistance. MSDH
shall use its latest report of Capacity Ratings of Public Water Systems, along with the
recommendations of MSDH staff and the contractor, to identify those public water
systems that are to receive this assistance.
Activity Objective - provide long-term on-site comprehensive technical assistance to resolve
problems identified by contractor. A minimum of six (6) systems will be chosen from a
prepared list.
Reporting/Evaluation - written progress reports using a format approved by MSDH will be
furnished monthly to MSDH and members of the Board by the contractor. The reports shall
identify progress made on the work plan developed for each system. The contractor shall meet
with the Board on a quarterly basis to update the Board on accomplishments under this
contract and answer any questions the Board might have regarding the implementation of this
contract.
2. Intermediate technical assistance:
This assistance is selective in nature and consists of one or more additional contact or
non-contact hours for public water systems previously receiving short-term assistance
or systems not requiring comprehensive long-term assistance. Selection of systems
will be based on the list supplied by MSDH for the remaining public water systems
from the initially prepared list.
Intermediate technical assistance projects will be counted toward the minimum
twelve (12) required comprehensive projects at a ratio of 2:1 (two intermediate
projects will be the equivalent of one comprehensive project).
Activity Objective - provide intermediate on-site technical assistance to selected systems
covering the subject(s) determined by the contractor to be most needed.
Reporting/Evaluation - written progress reports using a format approved by MSDH will be
furnished monthly to MSDH and members of the Board by the contractor. The reports shall
identify the assistance provided to each system. The contractor shall meet with the Board on a
quarterly basis to update the Board on accomplishments under this contract and answer any
questions the Board might have regarding the implementation of this contract.
Coordination and Monitoring of Board Management Training for Water System Officials:
Section 41-26-101 of the Mississippi Code of 1972, Annotated, states “Each member elected
or reelected after June 30, 1998, to serve on a governing board of any community public
water system, except systems operated by municipalities with a population greater than ten
thousand (10,000), shall attend a minimum of eight (8) hours of management training within
two (2) years following the election of that board member. If a board member has undergone
training and is reelected to the board, that board member shall not be required to attend
training. The management training shall be organized by the MSDH. The management
training shall include information on water system management and financing, rate setting
and structures, operations and maintenance, applicable laws and regulations, ethics, the
duties and responsibilities of the association and other organizations. The Department shall
develop and provide all training materials. To avoid board members having to interfere with
their jobs or employment, management training sessions may be divided into segments and,
to the greatest extent possible, shall be scheduled for evening sessions. The Department shall
conduct management training on a regional basis.” The contractor shall: serve as the
coordinator for MSDH in regards to all activities related to the implementation of the training
program in the state; randomly attend training sessions to ensure the established curriculum
is being followed and that the curriculum is relevant and effective; manage the Board
Member Training Curriculum Review Committee; continue to update the established
computerized database to accurately track the most current status of each board member
attending the program; and other related duties.
Activity Objective - manage those activities related to the effective training of the members of
the governing boards of small community public water systems.
Reporting/Evaluation - Randomly attend at least two sessions/contract year/training
organization unannounced and furnish both MSDH and the Board members a written report
within 7 days of attendance including the following information: review of presentation by
trainer(s); any needed remedial action; attendee comments; attendance roster; and other related
items. Written and oral quarterly reports shall be furnished to MSDH and the Board members
that include: attendee evaluation of the trainers and training material; contractor evaluation of
trainer(s); attendee comments; attendance rosters; needed remedial action; curriculum review
committee meetings; itemized costs of training organization(s). Monthly reports containing
the above information shall be submitted to MSDH along with the invoices for work
performed under the contract. MSDH, affected board members, and affected entities shall be
provided with periodic reports listing those board members who have not completed the board
member training and the time remaining for completion of the training.
Hands-On Operator Training:
The Contractor will provide practical, applied, “hands-on” training for public water system
operators in the State of Mississippi. MSDH defines hands-on operator training for the
purposes of this contract as training that provides functional instruction in the necessary
skills and knowledge to be able to better fulfill the job requirements of a drinking water
system operator. The hands-on training will include a comprehensive approach (lecture plus
physical, hands-on sessions with equipment) for all operators attending the training.
Trainings are to include equipment/props pertinent to the training topic(s) as a part of the
training discussion.
Activity Objectives - Provide a minimum of fourteen (14) hands-on operator training sessions
within the year.
Reporting/Evaluation - written quarterly reports using a format approved by MSDH on Hands-
On Operator Training. The reports shall include but are not limited to: a) details of sessions
conducted; b) number of attendees and their comments; c) related problems that occurred
during or as a result of a training session and any solution(s); d) an itemized list of the costs
incurred by the training organization; and e) other related items. The contractor shall meet
with the Board on a quarterly basis to update the Board on accomplishments under this
contract and answer any questions the Board might have regarding the implementation of this
contract.
Peer Review Assistance:
Through the use of trained volunteers, this assistance will be conducted on-site with the
systems either selected from a list provided to the contractor by MSDH or with prior MSDH
approval. A cooperative agreement between the contractor and the Mississippi Water and
Pollution Control Operators’ Association will help provide qualified volunteers to serve as
peer review team members. There will be a goal of a minimum of fourteen (14) Peer reviews
per contract year with a minimum of three (3) peer reviews per quarter. Each volunteer shall
be paid $75 per day for each actual peer review in which the volunteer participates. The
contractor will maintain a directory of trained volunteers.
Activity Objectives - provide short-term (less 8 contact hours) on-site technical assistance to
selected systems covering the subject(s) determined by the contractor to be most needed.
Reporting/Evaluation - copies of all completed peer review reports will be provided to both
MSDH and the Board within 30 days of completion of each peer review. Written progress
reports using a format approved by MSDH will be furnished monthly to MSDH and members
of the Board by the contractor. The name of the system undergoing the peer review shall be
removed and be identified by a code only known to the contractor. The report shall include: an
assessment of which type of capacity was the worst at the time of the visit; a listing of all
suggested remedial action; officials present shall be listed by title; an evaluation form
(previously approved by MSDH) rating the assistance provided that was completed by the
system; any conditions currently or potentially endangering public health; and any other related
items. The contractor shall meet with the Board on a quarterly basis to update the Board on
accomplishments under this contract and answer any questions the Board might have regarding
the implementation of this contract.
Asset Management Training:
The Contractor will provide practical, applied, asset management training for public water
system operators in the State of Mississippi using the guidance provided by the EPA in its
publication titled “Asset Management: A Best Practices Guide”. Training will be provided at
three different locations in the state, one per Public Health Region and will be provided at no
cost to attendees.
Activity Objectives - provide asset management training to water system operator statewide.
Reporting/Evaluation - written quarterly reports using a format approved by MSDH. The reports
shall include but are not limited to: a) details of sessions conducted; b) number of attendees and
their comments; c) related problems that occurred during or as a result of a training session and
any solution(s); d) an itemized list of the costs incurred by the training organization; and e) other
related items. The contractor shall meet with the Board on a quarterly basis to update the Board
on accomplishments under this contract and answer any questions the Board might have
regarding the implementation of this contract.
AGENCY RESPONSIBILITIES
The MSDH will conduct Small Systems Technical Assistance Set-aside activities through
Board approved contracts with providers who will be selected following procedures of the
State of Mississippi’s Department of Finance and Administration Public Procurement
Review Board. Contracts of a regulatory nature will be handled solely by MSDH. All
providers will report to and be responsible to the MSDH for all contract activities. No
additional FTE requirement is anticipated for state agencies to implement the provisions of
this set-aside.
Appendix F
Mississippi State Program Management Set-aside Annual Work plan
Section 1452(g)(2) - Safe Drinking Water Act Amendments of 1996
PUBLIC WATER SYSTEM MANAGEMENT PROGRAM
BACKGROUND
This work plan describes how the Drinking Water State Revolving Fund (DWSRF) State
Program Management set-aside funds will be expended to support the Public Water Systems
Supervision (PWSS) Program.
After review of the Draft FFY-2019 Intended Use Plan (IUP) by the Local Governments &
Rural Water Systems Improvements Board (Board), the Board will authorize the publication
of a legal notice in The Clarion-Ledger for the IUP. The notice will request the public to
provide comments on the Draft FFY-2020 Intended Use Plan (IUP). The IUP reserves 10%
of the state’s Drinking Water State Revolving Fund (DWSRF) capitalization grant for the
State Program Management activities to support the MSDH PWSS Program as allowed under
Section 1452(g)(2) of the SDWA Amendments of 1996.
After a public notice period of at least twenty-five (25) days, an oral proceeding will be held
to receive and consider comments from the public on the Draft IUP. After the resolution of
any comments from the public, the Final FFY-2020 IUP will be presented to the Board for
adoption at their next scheduled Board meeting. After adoption by the Board, a second filing
with the Secretary of State’s Office occurs. The Final FFY-2020 IUP will be effective thirty
(30) days from the date of the second filing with the Secretary of State’s Office.
FUNDING AMOUNT (Standard Capitalization Grant)
The state reserves 10% ($1,185,300) of the FFY-2020 DWSRF capitalization grant as a set-
aside for State Program Management activities of the PWSS Program. The reserved amount
will offset the salary, fringe and indirect cost expenses of a portion of the PWSS personnel
positions in the PWSS Program.
NUMBER OF FTE’s PROJECTED FOR IMPLEMENTING THIS SET-ASIDE
The state projects twenty-eight (28) FTEs will be required to implement the FFY-2020/2021
PWSS Program.
GOALS, OBJECTIVES, OUTPUT, AND DELIVERABLES
One of the set-asides authorized under the 1996 SDWA amendments is the management of
the state program, which can be funded by up to 10% of the federal allotment. These funds
will support public water system supervision program activities as required to maintain state
primacy and also to support the activities of the DWSIRLF. MSDH’s PWSS Work Plan
outlines in detail the aspects of the PWSS that are supported by this set-aside. Items covered
by the set-aside include: (1) State Primacy Requirements, (2) Non-Primacy Requirements,
and (3) Auxiliary Services.
Primacy Requirements
As required to maintain state primacy, MSDH maintains the PWSS programs on an ongoing
or as-needed basis. These programs include: revising current primacy programs by adopting
new Federal regulations as needed; coordinating for Mid-Year and End-of-Year review with
EPA Regional Office; maintaining a sanitary survey program with discrepancy follow-up;
participating in state data verification audits; ensuring public water systems (PWSs) are
utilizing approved laboratories and a certification program for those laboratories is in place;
participating in the EPA Regional oversight; operating in accordance with requirements of
the National Primary Drinking Water Regulations; maintaining an active water system design
and construction plan and specification review program; ensuring labs used by PWSs within
the state are capable of the workload created by regulations; participating in PWS and PWSS
training on rule requirements; informing EPA Region 4 of any special state initiatives under
the rules or provisions of the SDWA; maintaining records for all rule/policies, enforcing
reporting and record keeping as required; maintaining appropriate administrative penalty
authority; implementing the PWS definition; attending state/EPA planning and
implementation meetings; ensuring that newly permitted PWSs have design/construction
capable of compliance with the present and upcoming SDWA regulations; ensuring
analytical methods are being applied to demonstrate compliance with the regulations;
notifying (if necessary) EPA of intent not to adopt or implement any portion of the rules; and
responding to EPA requests for information or verification of state rules implementation.
Additionally, MSDH will provide annual summaries of the status of: each effective variance
and exemption to EPA; community PWSs that are allowed to monitor less frequently than
monthly; and non-community PWSs that are allowed to monitor less frequently than
quarterly to EPA. MSDH will also oversee and enforce requirements for rules and
regulations adopted with approved federal primacy. These regulations include the SDWA
and all applicable rules present and future, primacy packages, and extension agreements of
the SDWA.
Non-primacy Requirements
In addition to the requirements of the PWSS program, monies from this set-aside provide
support to activities that are of a non-primacy nature. Those activities are not required to
maintain state primacy. However, to run a highly effective, efficient program and most
importantly protect the public health, these activities are vital.
Capacity Development (CD) Program
As required by the SDWA, each state is required to develop and implement a Public
Water System Capacity Development Program in order to receive full funding annually
under the DWSRF Program. Public water system capacity assessment is a full evaluation
of the PWS’s technical, managerial, and financial ability to provide safe drinking water to
its customers by complying with all state and Federal regulations. In accordance with the
Federal requirements, MSDH has developed and implemented a CD program for both
new and existing PWSs. The MSDH CD program takes the form of a rating that each
community water system (CWS) and non-transient non-community water system
(NTNCWS) receives at their annual sanitary survey. The criteria used in the rating
system incorporate laws, regulations, and other valuable information to evaluate the areas
of technical, managerial, and financial capacity. The program is also designed to evolve
from year-to-year through an annual meeting of an advisory committee that will make
suggestions as to possible changes and/or additions to the rating criteria. As required by
regulation, an annual report is made to the Governor on the efficacy of the strategy and
progress towards improving the capacity of PWSs in the state. Additionally, annual
documentation of ongoing implementation of the CD strategy is to be provided with
DWSRF Capitalization Grant application.
Unregulated Contaminant Monitoring Rule
This particular aspect of the PWSS involves informing systems with populations greater
than 10,000 in the state monitoring plan of their responsibilities to monitor for
Unregulated Contaminant Monitoring Rule; assisting the EPA in sampling systems in the
state monitoring plan as determined by the state and EPA in the UCMR Partnership
Agreement; adding vulnerable systems to the plan for monitoring UCMR List 3
contaminants based on guidance; review UCMR data from public water systems to
ensure that it meets quality assurance and PWS reporting requirements necessary;
informing EPA of potential changes needed in the data and, with mutual agreement of the
state and EPA, make changes to the data; and responding as requested by the EPA for
information on verification of state UCMR implementation.
Operator Certification
As mandated by the SDWA to maintain full funding for the DWSIRLF, operator
certification is an essential part of the PWSS program. Activities required to maintain the
operator certification program include: providing documentation and evaluation of
ongoing program implementation for all annual program submittals subsequent to the
initial submittal; supply as required certification of changes and documentation of those
change that are made to the regulations of statutes; perform internal and external program
reviews as required by state law.
Source Water Assessment Program
On an annual basis, MSDH reports to EPA on Source Water Assessment Program
implementation activities. Beginning December 1, 2009, all groundwater systems began
either Source Water Monitoring or 4-Log Compliance Monitoring. Additionally,
Mississippi is required to conduct routine sanitary surveys of all public water systems and
identify significant deficiencies. The Rule also requires systems to take corrective actions
for significant deficiencies and for source water fecal contamination.
Auxiliary Services
These services include various aspects related to data management, compliance, and
enforcement of the PWSS Program.
Information Management and the Safe Drinking Water Inspection System
(SDWIS)/Fed Reporting
These ongoing activities include: overseeing and enforcing requirements of data
management and the Safe Drinking Water Inspection System (SDWIS) /Fed reporting;
reporting the state’s PWSS inventory at least annually to SDWIS/Fed; reporting the
state’s violations and enforcement actions at least quarterly; participating in EPA/state
data managers conference calls; identifying the data manager and alternate for the
purpose of making secure transmissions of data intended for SDWIS/Fed through EPA’s
Central Data Exchange; establishing and following quality assurance procedures to
ensure that PWS data eventually entered in SDWIS/Fed is of the highest reliability and
maximum value to the public.
Inspection Strategy
This activity includes overseeing and enforcing requirements of the regulatory
requirements.
Management System for Non-compliant Systems
These activities include: overseeing and enforcing requirements of management systems
for non-compliant systems; provide current versions of its enforcement response guide;
assurances that the EPA has up-to-date information.
Rule Task Force
This requires participation in the Rule Writing Task Force and Rule Workshops.
Enforcement and Management of Significant Non-compliers (SNC’s)
Activities of this auxiliary service include: overseeing and complying with the
requirements of management significant non-compliers (SNC’s); and reporting the state’s
response to instances of significant noncompliance at public water systems.
The commitments as stated here and in the PWSS Work plan are adopted as
commitments of the State Program Management set-aside.
SCHEDULE FOR COMPLETING ACTIVITIES
The schedule for completing State Program activities under this work plan will be the
schedule established by dates entered in the “Date Due” column of the MSDH PWSS Work
plan.
AGENCY RESPONSIBILITIES
The MSDH is the agency responsible for implementing required activities under the State
Program Management set-aside.
EVALUATION PROCESS TO ASSESS THE SUCCESS OF SET-ASIDE ACTIVITIES
The success of State Program Activities will be defined by the ability of the MSDH to
successfully meet commitments in the PWSS Work Plan. Quarterly and annual
reports/submittals required by the PWSS program include documentation and evaluation of
ongoing program implementation and success in meeting stated commitments.
Appendix G
Local Assistance and Other State Programs Annual Work plan
Section 1452(g)(2) - Safe Drinking Water Act Amendments of 1996
INTRODUCTION
The Mississippi State Department of Health (MSDH), Bureau of Public Water Supply
(Department), will use the Local Assistance and Other State Programs Set-aside of the
DWSRF in a wellhead protection and assistance program. The program will be eliminating
inactive wells and/or open holes which pose a contamination risk to the state’s groundwater
aquifers, by properly abandoning them in accordance with state guidelines. Local
governments realize that the inactive wells/open holes pose a risk of contamination to the
groundwater which may be utilize via their active wells; however, funds to properly abandon
wells/holes are limited. The financial assistance provided through this set-aside will allow
the state, by way of contractual agreement(s), to identify and then properly abandon inactive
wells/open holes posing contamination risks to the state’s groundwater aquifers.
SELECTION PROCESS
The contract for coordination of the decommissioning/properly closing inactive water
wells/open holes was bid and awarded; the current contract runs until June 30, 2019. A new
contract for the decommissioning/properly closing inactive water wells/open holes is
currently being developed in accordance with new State contracting requirements.
An Invitation For Bids (IFBs) for the coordination of the decommissioning/properly closing
inactive water wells/open holes was sent to qualified potential contractors. Bids received
were reviewed by the Department to select the lowest and best bid for the agency.
Recommendations for award of a contract were presented to the Board at their regularly
scheduled Board meeting; following authorization by the Board, the coordination contract
was awarded.
The contracts for the coordination and decommissioning/properly closing inactive water
wells/open holes currently reside as following:
The first contract (the coordination contract) - Mississippi Rural Water Association
(MsRWA).
The second contract (closure contract) – is currently being developed in accordance with
new State contracting requirements.
PROGRAM ACTIVITIES
The activities described herein will be accomplished through a four part process:
Identification of wells / holes needing proper abandonment for the protection of aquifers and
the overall public health; communication with public water supply that owns well/hole to
encourage proper abandonment; mobilization of well contractor to identified site to perform
the work; and confirmation that the work has been completed.
Identification – The contractor will use a list provided by the Department through a
cooperative effort with the Mississippi Department of Environmental Quality Office of
Groundwater Resources (MDEQ) to identify wells or open holes owned by particular water
systems to be abandoned. Wells/holes deemed high risk by MDEQ will be sought out first
for abandonment. Upon completion, wells/holes that are considered medium risk will be
addressed next, then low risk.
Communication – Staff from the contractor will meet with system officials to encourage
them to properly abandon existing inactive wells or open holes posing risk of contamination
to their water system and aquifer. This is considered essential to successfully achieving the
goal of abandoning those wells/holes posing risk.
Mobilization – Once the communication phase has been completed, staff of the MSW&MW,
the licensed well driller contractor and the well closure coordinator will mobilize to the
selected site and commence with the proper abandonment of the well/hole. This will be
accomplished in accordance with established guidelines set forth by the MDEQ Office of
Groundwater. When the abandonment is complete, the well contractor will contact the well
closure coordinator to inform them of project completion.
Confirmation – Staff of the well closure coordinator will perform site visits to confirm
proper abandonment of the wells/holes. When the abandonment is confirmed, the well
closure coordinator will notify the Department to ensure that each abandoned well matches
invoices submitted for payment.
SCHEDULE FOR COMPLETING ACTIVITIES
The schedule for completing Local Assistance and Other Program activities under this work
plan will be the schedule established by set contractual dates.
AGENCY RESPONSIBILITIES
The MSDH will be monitoring contractors throughout the process to ensure effective
completion of contractual assignments.
EVALUATION PROCESS TO ASSESS THE SUCCESS OF SET-ASIDE ACTIVITIES
The success of this set-aside will be defined by the ability of the MSDH through the solicited
contractor(s) to remove by proper abandonment wells or open holes that potentially pose a
risk to existing water supplies and the aquifers which supply the well water.
Appendix H
Coordination Schedules for Jointly Funded Projects
FFY-2019 DWSIRLF COORDINATION SCHEDULES FOR JOINTLY FUNDED PROJECTS
These schedules are designed to help assure coordination between the DWSIRLF Program and the Appalachian Regional Commission (ARC) Grant
Program, Community Development Block Grant (CDBG) Program, and Rural Utilities Service (RUS) Loan/ Grant Program. These schedules are,
however, subject to change due to the timing of federal appropriations or program changes.
Date(s)
Schedule Item(s)/Deadline(s)
ARC
CDBG
RUS*
May 1,
Mississippi Appalachian Regional Office
(MARO) notifies potential applicants & local
Planning & Development Districts of the
September 1, 2019, deadline for submitting
complete ARC grants applications.
(N/A)
(N/A)
Sept 1,
All FY-2020 ARC project applications due at
MARO in Tupelo, MS by 5:00 p.m.
Proposals received afterward will only be
considered as "back-up" projects.
(N/A)
(N/A)
Oct 1,
2020**
Deadline for loan applicant to submit a
complete DWSIRLF facilities plan to MS
State Department of Health (MSDH). The
plan must reflect anticipated ARC funding,
and must indicate if the loan applicant intends
to proceed with the project; 1) only if ARC
funds are received, or 2) regardless of ARC
funding.**
Deadline for loan applicant to submit a
complete DWSIRLF facilities plan to MS
State Department of Health (MSDH). The
plan must reflect anticipated CDBG funding,
and must indicate if the loan applicant
intends to proceed with the project; 1) only if
CDBG funds are received, or 2) regardless of
CDBG funding.**
Deadline for loan applicant to submit a
complete DWSIRLF facilities plan to MS
State Department of Health (MSDH). The
plan must reflect anticipated RUS funding,
and must indicate if the loan applicant intends
to proceed with the project; 1) only if RUS
funds are received, or 2) regardless of RUS
funding.**
Oct, 2020
MS State Dept. of Health (MSDH) notifies
MARO of loan applicants who have
submitted complete facilities plans which
indicate anticipated FY-2020 ARC funding.
MARO notifies MSDH of ARC grant
applicants who submitted pre-applications
which indicate anticipated FY-2020
DWSIRLF funding.
MS State Dept. of Health (MSDH) notifies
Mississippi Development Authority (MDA)
of loan applicants who have submitted
facilities plans which indicate anticipated
FY-2020 CDBG funding.
MS State Dept. of Health (MSDH) notifies U.
S. Department of Agriculture, Rural Utilities
Service (RUS) of loan applicants who have
submitted facilities plans which indicate
anticipated FY-2020 RUS funding
Nov 15,
MARO completes review of FY-2020 projects
and briefs Governor on proposed Priority 1
and Priority 2 project lists, as well as projects
not eligible to be funded.
(N/A)
(N/A)
ARC
CDBG
RUS
Nov 15-30,
MARO notifies local Planning &
Development Districts of projects that have
been selected for the P1 (fundable priority
list). MARO will copy MSDH on these
notification letters if grantee has indicated that
it is pursuing DWSIRLF loan funds for the
project. MSDH will not award a DWSIRLF
loan until this notification from MARO is
provided.
(N/A)
(N/A)
Oct 18,
(N/A)
CDBG program application workshops.***
(N/A)
Nov, 2020
MSDH advertises Draft DWSIRLF FFY-2020
Intended Use Plan for public comment.
MSDH advertises Draft DWSIRLF FFY-
2021 Intended Use Plan for public comment.
MSDH advertises Draft DWSIRLF FFY-2021
Intended Use Plan for public comment.
Dec 30,
Deadline for all FY-2020 Priority 1
documentation and forms to be submitted to
MARO.
(N/A)
(N/A)
Dec, 2020
Board adopts FFY-2020 DWSIRLF Intended
Use Plan accounting for anticipated ARC
award amounts if identified in facilities plan.
Board adopts FFY-2021 DWSIRLF Intended
Use Plan, accounting for anticipated CDBG
award amounts if identified in facilities plan.
CDBG public facilities applications, along
with one copy of the DWSRLF loan
application with maps and appropriate
attachments will be accepted from 12/7/2020
until 8/2021
Board adopts FFY-2021 DWSIRLF Intended
Use Plan, accounting for anticipated RUS
award amounts if identified in facilities plan.
Jan 20,
(N/A)
Deadline for a CDBG grant applicant to
submit a water viability review form to
MDA.
(N/A)
Jan, 2020
MSDH notifies MARO of projects included
on final FFY-2020 Priority List that anticipate
receiving FFY-2020 ARC funds.
MSDH notifies MDA of projects included on
the Final FFY-2020 Priority List that
anticipate receiving FFY-2020 CDBG funds.
MSDH notifies RUS of projects included on
the final FFY-2020 Priority List that
anticipate receiving FFY-2020 RUS funds.
ARC
CDBG
RUS
Feb 1,
MARO sends project applications to ARC-
Washington to start final funding approval
process.
(N/A)
(N/A)
Feb 16,
(N/A)
CDBG public facilities applications, along
with one copy of the DWSIRLF loan
application with maps and appropriate
attachments, will be accepted from
2/16/2020 until 4:00 p.m. on 2/17/2020.
(N/A)
Feb- Jun,
ARC-Washington starts the final funding
approval process and awards ARC grants
during the spring or summer of 2020.
(N/A)
(N/A)
Mar, 2020
(N/A)
MDA provides notification to MSDH that
complete CDBG applications have been
received.
(N/A)
May 1,
2020**
Deadline for loan applicants to submit a
completed DWSIRLF loan application to
MSDH for the total DWSIRLF eligible costs,
less the amount of anticipated ARC award to
be applied to DWSIRLF eligible costs.**
Deadline for loan applicants to submit a
completed DWSIRLF loan application to
MSDH for the total DWSIRLF eligible costs,
less amount of anticipated CDBG award to
be applied to the DWSIRLF eligible costs.**
(NOTE: If the loan recipient is pursuing a
CDBG grant to cover part of the cost of
construction, the loan recipient has the option
to include the anticipated CDBG grant
amount in the detailed cost breakdown in the
application, or may request 100% DWSIRLF
funding with the possibility of amending the
loan application later if the loan recipient is
awarded a CDBG grant prior to receipt of
bids for construction. However, the
DWSIRLF loan application must be
consistent with the DWSIRLF facilities plan
for the project.)
Deadline for loan applicants to submit
complete DWSIRLF loan applications to
MSDH for the total DWSIRLF eligible costs,
less amount of anticipated RUS award to be
applied to DWSIRLF eligible costs.**
(NOTE: If the loan recipient is pursuing an
RUS grant/loan to cover part of the cost of
construction, the loan recipient has the option
to include the anticipated RUS grant/loan
amount in the detailed cost breakdown in the
application, or may request 100% DWSIRLF
funding with the possibility of amending the
loan application later if the loan recipient is
awarded an RUS grant/loan prior to receipt of
bids for construction. However, the
DWSIRLF loan application must be
consistent with the DWSIRLF facilities plan
for the project)
ARC
CDBG
RUS
May, 2020
(N/A)
MDA provides notification to MSDH of
which projects fall within the funding range
for CDBG grants for construction contingent
upon matching funds being in place.
(NOTE: MSDH will not award a DWSIRLF
loan until this notification from MDA is
provided.)
(N/A)
Jun, 2020
MSDH provides notification to MARO that
complete DWSIRLF loan applications have
been received.
MSDH provides notification to MDA that
complete DWSIRLF loan applications have
been received. MDA provides conformation
to MSDH of which projects fall within the
funding range for CDBG grants for
construction contingent upon matching funds
being in place.
MSDH provides notification to RUS that
complete DWSIRLF loan applications have
been received.
(Upon
Grant
Award)
MARO provides notification to MSDH that
ARC awards have been made.
MDA provides notification to MSDH that
CDBG awards have been made.
RUS provides notification that RUS awards
have been made
Aug 1,
2020**
All approvable documents and responses to
comments necessary for loan award must be
submitted to MDEQ for review and
approval.**
All approvable documents and responses to
comments necessary for loan award must be
submitted to MDEQ for review and
approval.**
All approvable documents and responses to
comments necessary for loan award must be
submitted to MDEQ for review and
approval.**
May-Sep,
Loan applicants receive DWSIRLF loan
awards from MSDH. The amount of the loan
will be the total DWSIRLF eligible cost less
the ARC award amount to be applied to
DWSIRLF eligible costs.
Loan applicants receive DWSIRLF loan
awards from MSDH. The amount of the
loan will be the total DWSIRLF eligible cost
less the CDBG award amount to be applied
to DWSIRLF eligible costs.
Loan applicants receive DWSIRLF loan
awards from MSDH. The amount of the loan
will be the total DWSIRLF eligible cost less
the RUS award amount to be applied to
DWSIRLF eligible costs.
If loan applicant desires DWSIRLF loan
award prior to RUS award, loan applicant
must provide MSDH with a copy of letter
from RUS which states their project will be
funded only contingent upon receipt of
DWSIRLF matching funds. MSDH will not
award a DWSIRLF loan until that notification
from RUS is provided.
ARC
CDBG
RUS
(Upon
Loan
Award)
MSDH sends a copy of the award letter to
MARO.
MSDH sends a copy of the award letter to
MDA.
MSDH sends a copy of the award letter to
RUS.
*
General Guidance regarding DWSIRLF/RUS coordination: The RUS is an agency of the United States Department of Agriculture which provides
loans and grants for water and wastewater projects. Eligible applicants must be public entities, nonprofit organizations, or Indian tribes that serve
communities with populations under 10,000. RUS funds may be used in conjunction with other Federal, State, or local funds. Applications for RUS funds
will be accepted at any time during the year, and involve an environmental review that includes public notifications and comment periods. RUS projects
are funded at any time during the year as long as funds are available. RUS funds are allocated by Congress in October of each year, and are usually spent
as complete applications are received. Therefore, it is generally to the applicant’s advantage to file applications earlier in the year. To receive an
application package or other information, contact Rural Utilities Service, 100 West Capitol Street, Suite 831, Jackson, MS 39269; telephone: (601) 965-
5460; fax: 844-325-7034.
**
FFY-2020 DWSIRLF Priority System Deadline
***
“To Be Announced” (Date has not yet been set.)
Appendix J
Drinking Water Systems Emergency Loan Fund Program
Section 41-3-16, Mississippi Code of 1972, as amended, created the Drinking Water Systems
Emergency Loan Fund Program (DWSELF). This program provides loans to counties,
municipalities, districts, or other (tax exempt) water organizations for emergency construction,
repair, or replacement of drinking water facilities. This entirely state-funded loan program
provides a ready funding source for such emergency projects without the federal cross-cutter
requirements required in the Drinking Water Systems Improvements Revolving Loan Fund
(DWSIRLF) Program, thereby saving valuable time and expense. This Program eliminates the
need to address emergency loans in the DWSIRLF. The Board encourages eligible water
organizations throughout the state to utilize this program whenever emergency drinking water
projects are needed.
The basic provisions of this program are: 1) a current interest rate of 2.0%; 2) a maximum single
loan amount as determined by the Board; 3) a maximum repayment period of five (5) years; and
4) the project must meet the definition of an emergency as established in the program
regulations. It is also important to note that loan recipients do not pay interest during the original
construction period (capitalized interest), and that loan repayments do not begin until after
project completion.
Allowable costs for the project may not be incurred prior to the budget period established in the
loan agreement, which may not begin more than 30 days prior to receipt of the loan application.
Costs for the project will be paid on a reimbursement basis, based upon the actual allowable
expenditures of the loan recipient.
Appendix K - Certifications
In addition to the ten (10) assurances included below, the state acknowledges that there are six
(6) additional assurances that the state has agreed to in either the Operating Agreement between
the State and EPA Region IV or the annual capitalization grants. These two documents are
hereby incorporated into this IUP by reference.
1.
The state certifies that all drinking water facility projects in this IUP identified in Section
VII as being subject to the federal cross-cutting requirements are or will be in compliance
with all such requirements prior to the state entering into an assistance agreement with
the recipient.
2.
The state certifies that it will make an annual report to the Regional Administrator on the
actual uses of the funds and how the state has met the goals and objectives for the
previous two fiscal years as identified in the IUPs; and to annually have conducted an
independent audit of the funds to be conducted in accordance with generally accepted
government accounting standards.
3.
The state certifies that this IUP will be subjected to public review and comment prior to
final submission to EPA. The state certifies that it will follow the “Mississippi
Administrative Procedures Law” in seeking public review and comments on this IUP. A
copy of the “Mississippi Administrative Procedures Law” can be obtained from the
Mississippi Secretary of State’s Office, and can be found on the Mississippi State
Department of Health’s website at www.healthyms.com/dwsrf.
An oral proceeding will be held to receive written and oral comments on this IUP. A
transcript of the public hearing recording the comments and recommended solutions will
be submitted to EPA along with the Final IUP. Anyone desiring to receive a copy of the
oral proceeding transcript should contact Ulysses Conley, Program Support Specialist, at
(601) 576-7518 to request copies.
4.
The state certifies that all drinking water facility projects in this IUP are on the project
Priority List developed pursuant to the requirements of Section 1452(b)(3)(B), SDWA.
5.
The state certifies that it will enter into binding commitments for 120% of the amount of
each payment (LOC) under the capitalization grant within one year after receipt of each
payment (LOC).
6.
The state certifies that it will commit and expend all Drinking Water Systems
Improvements Revolving Loan Fund (DWSIRLF) Program monies as efficiently as
possible, and to disburse the funds in a timely and expeditious manner.
7.
The state certifies that it will conduct environmental reviews on all DWSIRLF cross-
cutter equivalency projects in accordance with the State Environmental Review Process
(SERP).
8.
The state certifies that prior to adding any new projects to the “FFY-2020 and After
Planning List” for the purpose of funding such a project during FFY-2020 that the state
will follow the “Mississippi Administrative Procedures Law” in amending this IUP in
order to allow for public review and comments.
9.
The state certifies that it has developed and implemented a Capacity Development (CD)
strategy to assist public water systems in acquiring and maintaining technical,
managerial, and financial capacity as required in Section 1420(c) of the 1996
Amendments to the SDWA. This CD program is currently approved by EPA.
10.
The state certifies the State’s Operator Certification Program is currently approved by
EPA.
Appendix L – Assistance for Small and Disadvantaged Communities Drinking Water
Grant Program
The Water Infrastructure Improvements for the Nation Act of 2016 authorizes the Environmental
Protection Agency (EPA) to award grants to assist disadvantaged communities and small
communities with meeting the requirements of the Safe Drinking Water Act (SDWA).
The grant program is designed to help public water systems in underserved communities meet
and comply with SDWA requirements. The grant program will provide assistance to underserved
communities that have no household drinking water or wastewater services or are served by a
public water system that violates or exceeds and Maximum Containment Level, treatment
technique, or action level.
A small or disadvantaged community is one:
1. That the state determines to be a disadvantaged community under SDWA section
1452(d)(3) or may become a disadvantaged community as a result of carrying out a
project of activity, or
2. With a population of less than 10,000 individuals that does not have the capacity to incur
debt sufficient to finance a project to comply with the SDWA.
Projects eligible for assistance include those to return a public water system to compliance;
efforts that benefit disadvantaged communities on a per household basis; programs to provide
household water quality testing, including testing for unregulated contaminants; and activities
necessary for a state to respond to a contaminant.
The grant program requires a match of 45% in the form of monetary funding, services, materials,
supplies, or other in-kind services. States will need to develop a robust list of fundable projects
that meet the requirements of the grant program to receive funding. States will consult with EPA
regional offices on their project and activity lists prior to final selection.
The allotment for Mississippi is $454,000.