33 MAC Pt. 204, R. 11.2

Traffic Impact Assessment

Year: 2026Length: 206 wordsOfficial source

Cite as 33 Miss. Admin. Code Pt. 204, R. 11.2

Traffic Impact Assessment. If the proposed development meets or exceeds the following predictor variables at full build-out or usage, then traffic impact analysis will be required: Land Use Type ITE Code Quantitative Threshold Residential 210, 220, 222, 230, 270 50+ Dwelling Units Retail 814, 815, 820 15,000+ Square Feet Office 710, 714, 715, 750, 770 30,000+ Square Feet Bldg or 3+ acres land 3986776.1/00520.00006 Industrial 110, 120, 130, 140 40,000+ Square Feet Bldg or 9+ acres land Educational 520, 530, 550 20,000+ Square Feet Bldg. or 250+ Students Lodging 310, 312, 320 100+ Occupied Rooms Medical 30,000+ Square Feet Bldg. For land use types not identified in this table, the threshold values of 50 peak-hour, peak-direction trips will apply as determined by information contained in the latest edition of the ITE Trip Generation Manual, or, if no longer published, any similar substitute manual designated by the General Manager. The General Manager or his designee may also require a traffic impact analysis if the traffic movements to and from the development could cause operational problems or safety concerns adjacent to the site. The above threshold values shall apply to all phases of a phased project if the sum of the phases equals or exceeds the threshold values.
33 MAC Pt. 204, R. 11.2: Traffic Impact Assessment | Justis AI