33 MAC Pt. 208, R. 1.1
Definitions
Cite as 33 Miss. Admin. Code Pt. 208, R. 1.1
Definitions. Unless specifically defined below, words or phrases used in this
Regulation shall be interpreted so as to give them the meaning they have in common usage and
to give this Regulation it’s most reasonable application.
A Zone is the Area of Special Flood Hazard without base flood elevations determined.
AE Zone is the Area of Special Flood Hazard with base flood elevations determined.
Accessory structure (Appurtenant structure) means a structure, which is located on the same
parcel of property as the principal structure and the use of which is incidental to the use of the
principal structure. Accessory structures should constitute a minimal initial investment, may not
be used for human habitation, and be designed to have minimal flood damage potential.
Examples of accessory structures are detached garages, carports, storage sheds, pole barns, and
hay sheds.
Addition (to an existing building) means any walled and roofed expansion to the perimeter or
height of a building. Any addition shall be considered new construction. If the addition is more
than 50% of the market value of the structure, then the addition and the existing structure are
now new construction.
AO Zone is an area of one percent chance of shallow flooding where depths are between one to
three feet (usually shallow ponding), with base flood elevations shown.
Appeal means a request for a review of the Floodplain Administrator’s interpretation of
any provision of this Regulation or a request for a variance.
3986829.1/00520.00006
AR/AE, AR/AH, AR/AO, and AR/A Zones are SFHAs that result from the decertification of a
previously accredited flood protection system or levee that is in the process of being restored to
provide a one percent chance or greater level of flood protection. After restoration is complete,
these areas will still experience residual flooding from other flooding sources.
A99 Zone is that part of the SFHA inundated by the one percent chance flood to be protected
from the one percent chance flood by a Federal flood protection system or levee under
construction, no base flood elevations are determined.
Area of shallow flooding means a designated AO or AH Zone on the community’s Flood
Insurance Rate Map (FIRM) with flood depths from one to three feet where a clearly defined
channel does not exist, where the path of flooding is unpredictable and indeterminate, and where
velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
Area of special flood hazard is the land in the floodplain within a community subject to a one
percent or greater chance of flooding in any given year. This area is also referred to as the
Special Flood Hazard Area (SFHA).
Base flood means the flood having a one percent chance of being equaled or exceeded in any
given year (also called the “one percent chance flood”).
Base Flood Elevation (BFE) is the elevation shown in the Flood Insurance Study (FIS) for
Zones AE, AH, AR, AR/A, AR/AE, AR/AH, AR/AO, and VE that indicates the water surface
elevation resulting from a flood that has a one percent or greater chance of being equaled or
exceeded in any given year.
Basement means any portion of a building having its floor sub-grade (below ground level) on all
sides.
Breakaway wall means a wall that is not part of the structural support of the building and is
intended through its design and construction to collapse under specific lateral loading forces
without causing damage to the elevated portion of the building or the supporting foundation
system. This is associated with VE Zone construction.
Building see Structure.
Coastal AE Zone means the portion of the Special Flood Hazard Area (SFHA) to be
landward of a Velocity (V) Zone or landward of an open coast or back-bay area without mapped
V-Zones, in which the principal sources of flooding are astronomical tides, storm surges, seiches
or tsunamis; not riverine sources. Coastal AE Zones may be subject to wave effects, velocity
flows, erosion, scour or combinations of these forces. All community-identified or designated
portions of the Special Flood Hazard Area (SFHA) between the landward limit of moderate wave
action (the LiMWA or 1.5-foot breaking wave) and the landward limit of the V Zone boundary
3986829.1/00520.00006
shall be regulated as VE Zones. Where no VE Zone is mapped in back-bay areas, the Coastal
AE Zone is the portion between the high tide line and the landward limit of the 1.5-foot breaking
wave.
Coastal Barrier Resources System (CBRS) is a system of protected coastal areas which also
includes otherwise protected areas; subject to certain flood coverage restrictions. These areas
were identified by the Coastal Barrier Resources Act of 1982 (CBRA) and the Coastal Barrier
Improvement Act of 1990 and are shown on appropriate FIRM panels.
Coastal high hazard area is an area of special flood hazard, extending from offshore to the
inland limit of the primary frontal dune along an open coast and any other area subject to high
velocity wave action from storms or seismic sources. The area is designated on the FIRM as VE
Zone.
Community is a political entity and/or its authorized agents or representatives that have
the authority to adopt and enforce floodplain Regulations for the area under its jurisdiction.
Community Floodplain Management Map means any map produced by the community
utilizing best available base flood elevation and floodway data that is from a federal, state, or
other accepted technical source.
Community Rating System (CRS) is a program developed by the Federal Insurance
Administration to provide incentives for those communities in the Regular Program that have
gone beyond the minimum floodplain management requirements to develop extra measures to
provide protection from flooding.
Community Flood Hazard Area (CFHA) is an area that has been determined by the Floodplain
Administrator (or other delegated, designated, or qualified community official) from available
technical studies, historical information, and other available and reliable sources, which may be
subject to periodic inundation by floodwaters that can adversely affect the public health, safety
and general welfare. This includes areas downstream from dams.
Critical facility (also called critical action) means facilities for which the effects of even a slight
chance of flooding would be too great. The minimum floodplain of concern for critical facilities
is the 0.2 percent chance flood level. Critical facilities include, but are not limited to facilities
critical to the health and safety of the public such as: emergency operations centers, designated
public shelters, schools, nursing homes, hospitals, police, fire and emergency response
installations, vital data storage centers, power generation and water and other utilities
(including related infrastructure such as principal points of utility systems) and installations
which produce, use or store hazardous materials or hazardous waste (as defined under the Clean
Water Act and other Federal statutes and regulations).
D Zone is an area in which the flood hazard is undetermined.
3986829.1/00520.00006
Dam is any artificial barrier, including appurtenant works, constructed to impound or
divert water, waste water, liquid borne materials, or solids that may flow if saturated. All
structures necessary to maintain the water level in an impoundment or to divert a stream from its
course will be considered a dam.
Development means any man-made change to improved or unimproved real estate, including,
but not limited to, buildings or other structures, mining, dredging, filling, grading, paving,
excavating, drilling operations, or storage of materials or equipment.
Dry Floodproofing means any combination of structural and nonstructural additions, changes,
or adjustments to structures, which reduce or eliminate flood damages to real estate or improved
real estate property, water, and sanitary facilities, structures, and their contents. Structures shall
be floodproofed with a minimum of 12 inches of freeboard (more is recommended) in relation to
the base flood elevation. Dry floodproofing of a pre-FIRM residential structure that has not been
substantially damaged or improved is allowed. Dry floodproofing of a post-FIRM residential
building is not allowed. Non-residential structures may be dry floodproofed in all flood zones
with the exception of the Coastal High Hazard Area or the Coastal AE Zone.
Elevated building means for insurance purposes, a non-basement building which has its lowest
elevated floor raised above ground level by foundation walls, shear walls, posts, pilings,
columns, or piers.
Elevation Certificate is a FEMA form used as a certified statement that verifies a building’s
elevation information.
Emergency Program means the first phase under which a community participates in the NFIP.
It is intended to provide a first layer amount of insurance coverage for all insurable buildings in
that community before the effective date of the initial FIRM.
Enclosure below the Lowest Floor see “Lowest Floor.”
Encroachment means the advance or infringement of uses, plant growth, fill, excavation,
buildings, structures or development into a floodplain, which may impede or alter the flow
capacity of a floodplain.
Executive Order 11988 (Floodplain Management) this order requires that no federally assisted
activities be conducted in or have the potential to affect identified Special Flood Hazard Areas,
unless there is no practicable alternative.
Executive Order 11990 (Wetlands Protection) this order requires the avoidance of adverse
impacts associated with the destruction or modification of wetlands.
3986829.1/00520.00006
Existing Construction means structures for which the “start of construction” commenced before
the date of the FIRM or before January 1, 1975, for FIRMs effective before that date. Existing
construction may also be referred to as existing structures.
Existing manufactured home park or subdivision means a manufactured home park or
subdivision for which the construction of facilities for servicing the lots on which the
manufactured homes are to be affixed (including at a minimum the installation of utilities, the
construction of streets, and either final site grading or the pouring of concrete pads) is completed
before the effective date of the floodplain management regulations adopted by a community.
Expansion to an existing manufactured home park or subdivision includes the preparation of
additional sites by the construction of facilities for servicing the lots on which the manufactured
homes are to be affixed (including the installation of utilities, the construction of streets, and
either final site grading or the pouring of concrete pads).
Fill means a deposit of earthen materials placed by artificial means.
Five-Hundred Year Flood means the flood that has a 0.2 percent chance of being equaled or
exceeded in any year. Areas subject to the 0.2 percent chance flood have a moderate risk of
flooding.
Flood or flooding means a general and temporary condition of partial or complete inundation of
normally dry land areas from:
a.)
The overflow of inland or tidal waters.
b.)
The unusual and rapid accumulation or runoff of surface waters from any source.
c.)
Mudslides which are proximately caused by flooding and are akin to a river of
liquid and flowing mud on the surfaces of normally dry land areas, as when earth is carried by a
current of water and deposited along the path of the current.
d.) The collapse or subsidence of land along the shore of a lake or other body
of water as a result of erosion or undermining caused by waves or currents of water
exceeding anticipated cyclical levels or suddenly caused by an unusually high water
level in a natural body of water, accompanied by a severe storm, or by an
unanticipated force of nature, such as flash flood or an abnormal tidal surge, or by
some similarly unusual and unforeseeable event which results in flooding.
Flood (insurance definition) means a general and temporary condition of partial or complete
inundation of two or more acres of normally dry land areas or of two or more properties (e.g. a
building and a public street) from (1) overflow of inland or tidal waters (2) unusual and rapid
accumulation or runoff of surface waters (3) mudflows caused by flooding.
3986829.1/00520.00006
Flood Insurance Rate Map (FIRM) means an official map of a community, on which FEMA
has delineated both the areas of special flood hazard and the risk premium zones applicable to
the community.
Flood Insurance Study (FIS) is the document which provides an examination, evaluation, and
determination of flood hazards and, if appropriate, corresponding water surface elevations, or an
examination, evaluation, and determination of mudslide and/or flood-related erosion hazards.
Floodplain means any land area susceptible to being inundated by flood waters from any source.
Floodplain Administrator is the individual appointed to administer and enforce the floodplain
management regulations.
Floodplain management means the operation of an overall program of corrective and
preventive measures for reducing flood damage and preserving and enhancing, where possible,
natural resources in the floodplain, including but not limited to emergency preparedness plans,
flood control works, floodplain management regulations, and open space plans.
Floodplain management regulations means this Regulation and other zoning Regulations,
subdivision regulations, building codes, health regulations, special purpose Regulations, and
other applications of police power which control development in flood-prone areas. This term
describes federal, state, or local regulations in any combination thereof, which provide standards
for preventing and reducing flood loss and damage.
Floodproofing Certificate is an official FEMA form used to certify compliance for non-
residential structures in non-Coastal High Hazard Areas as an alternative to elevating buildings
to or above the base flood elevation.
Floodway see Regulatory Floodway.
Floodway fringe means that area of the special flood hazard area on either side of the regulatory
floodway.
Flood Protection Elevation is the base flood elevation plus the community freeboard. In areas
where no base flood elevations exist from any authoritative source, the flood protection elevation
can be historical flood elevations or base flood elevations determined and/or approved by the
floodplain administrator plus freeboard.
Freeboard means a factor of safety, usually expressed in feet above the BFE, which is applied
for the purposes of floodplain management. {Communities are encouraged to adopt at least an
18 inch freeboard to account for the one foot rise built into the concept of designating a
floodway, where floodways have not been designated.}
3986829.1/00520.00006
Functionally dependent use means a use which cannot perform its intended purpose unless it is
located or carried out in close proximity to water. The term includes only docking facilities, port
facilities that are necessary for the loading and unloading of cargo or passengers, ship building
and ship repair facilities and seafood offloading facilities. The term does not include long-term
storage, manufacture, processing functions, sales, administrative functions, or service facilities.
Hardship (as related to variances of this Regulation) means the exceptional difficulty that would
result from a failure to grant the requested variance. The Board of Directors requires that the
variance is exceptional, unusual, and peculiar to the property involved. Mere economic or
financial hardship alone is NOT exceptional. Inconvenience, aesthetic considerations, physical
handicaps, personal preferences, or the disapproval of one’s neighbors likewise cannot, as a rule,
qualify as an exceptional hardship. All of these problems can be resolved through other means
without granting a variance, even if the alternative is more expensive, or requires the property
owner to build elsewhere or put the parcel to a different use than originally intended.
Hazard potential means the possible adverse incremental consequences that result from the
release of water or stored contents due to failure of a dam or mis-operation of a dam or
appurtenances. The hazard potential classification of a dam does not reflect in any way on the
current condition of a dam and its appurtenant structures (e.g. safety, structural integrity, and
flood routing capacity).
High hazard dam means a class of dam in which failure may cause loss of life, serious damage
to residential, industrial, or commercial buildings; or damage to, or disruption of, important
public utilities or transportation facilities such as major highways or railroads. Dams which meet
the statutory thresholds for regulation that are proposed for construction in established or
proposed residential, commercial, or industrial areas will be assigned this classification, unless
the applicant provides convincing evidence to the contrary. A development permit is required
for a structure and any associated fill downstream from a dam at any location where flooding can
be reasonably anticipated from principal or emergency spillway discharges, or from overtopping
and failure of the dam.
Highest adjacent grade means the highest natural elevation of the ground surface, prior to
construction, net to the proposed walls of a building.
Historic Structure means any structure that is:
a.) Listed individually in the National Register of Historic Places (a listing
maintained by the Department of Interior) or preliminarily determined by the
Secretary of the Interior as meeting the requirements for individual listing on the
National Register;
3986829.1/00520.00006
b.) Certified or preliminarily determined by the Secretary of the Interior as
contributing to the historical significance of a registered historic or a district
preliminarily determined by the Secretary to qualify as a registered historic district;
c.) Individually listed on the State of Mississippi inventory of historic
structures, or;
d.) Individually listed on a local inventory historic places in communities with
historic preservation programs that have been certified by an approved state program
as determined by the Secretary of the Interior.
Hydrologic and hydraulic engineering analyses means the analyses performed by a
professional engineer, registered in the state of Mississippi, in accordance with standard
engineering practices as accepted by FEMA, used to determine flood elevations and /or floodway
boundaries.
Increased Cost of Compliance (ICC) coverage means under the standard flood insurance
policy the cost to repair a substantially flood damaged building that exceeds the minimal repair
cost and that is required to bring a substantially damaged building into compliance with the local
flood damage prevention Regulation. Acceptable mitigation measures are floodproofing
(nonresidential), relocation, elevation, demolition, or any combination thereof. All renewal and
new policies with effective dates on or after June 1, 1997, include ICC coverage.
Letter of Map Change (LOMC) is an official FEMA determination, by letter, to amend or
revise effective Flood Insurance Rate Maps, Flood Boundary and Floodway Maps, and Flood
Insurance Studies. LOMC’s are broken down into the following categories:
Letter of Map Amendment (LOMA)
An amendment based on technical data showing that a property was incorrectly included in a
designated SFHA, was not elevated by fill (only by a natural grade elevation) and will not be
inundated by the one percent chance flood. A LOMA amends the current effective FIRM and
establishes that a specific property is not located in a SFHA.
Letter of Map Revision (LOMR)
A revision based on technical data that, usually due to manmade changes, shows changes to
flood zones, flood elevations, floodplain and floodway delineations, and planimetric features.
One common type of LOMR, a LOMR-F, is a determination concerning whether a structure or
parcel has been elevated by fill above the BFE and is, therefore, excluded from the SFHA.
Conditional Letter of Map Revision (CLOMR)
A formal review and comment by FEMA as to whether a proposed project complies with the
minimum NFIP floodplain management criteria. A CLOMR does not revise effective Flood
Insurance Rate Maps, Flood Boundary and Floodway Maps, or Flood Insurance Studies.
3986829.1/00520.00006
Levee means a man-made structure; usually an earthen embankment designed and constructed in
accordance with sound engineering practices to contain, control, or divert the flow of water so as
to provide protection from temporary flooding.
Levee system means a flood protection system which consists of a levee, or levees, and
associated structures, such as closure and drainage devices, which are constructed and operated
in accordance with sound engineering practices. For a levee system to be recognized, the
following criteria must be met. All closure devices or mechanical systems for internal drainage,
whether manual or automatic, must be operated in accordance with an officially adopted
operation manual (a copy of which must be provided to FEMA by the operator when levee or
drainage system recognition is being sought or revised). All operations must be under the
jurisdiction of a Federal or State agency, an agency created by Federal or State law, or an agency
of a community participating in the NFIP.
Limit of Moderate Wave Action (LiMWA) is the limit of the AE Zone category area exposed
to wave attack from waves greater than 1.5 feet during the base (one percent chance) flood on
open coastal and inland areas exposed to erosion and wave propagation.
Low hazard dam means a class of dam in which failure would at the most result in damage to
agricultural land, farm buildings (excluding residences), or minor roads.
Lowest adjacent grade means the elevation of the sidewalk, patio, deck support, or basement
entryway immediately next to the structure and after the completion of construction. It does not
include earth that is placed for aesthetic or landscape reasons around a foundation wall. It does
include natural ground or properly compacted fill that comprises a component of a building’s
foundation system.
Lowest floor means the lowest floor of the lowest enclosed area (including basement). An
unfinished or flood resistant enclosure, used solely for parking of vehicles, building access, or
storage, in an area other than a basement, is not considered a building’s lowest floor, provided
that such enclosure is not built so as to render the structure in violation of the non-elevation
provisions of this code.
Manufactured home (44 CFR 59.1 definition / FEMA) means a structure, transportable in one
or more sections, which is built on a permanent chassis and designed to be used with or without a
permanent foundation when attached to the required utilities. The term manufactured home does
not include a “recreational vehicle.”
Manufactured housing (24 CFR 3280.3 and 3285.5 definitions / HUD) means “…a structure,
transportable in one or more sections, which in the traveling mode is 8 body feet or more in
width or 40 body feet in length or which the private insurance industry.
3986829.1/00520.00006
National Geodetic Vertical Datum (NGVD) means a vertical control, corrected in 1929, used
as a reference for establishing varying elevations within the floodplain.
New Construction means a structure or an addition to an existing structure for which the start of
construction commenced on or after the effective date of a floodplain management regulation
adopted by a community and any subsequent improvements to such structure or the addition.
New manufactured home park or subdivision means a manufactured home park or
subdivision for which the construction of facilities for servicing the lots on which the
manufactured homes are to be affixed (including at a minimum, the installation of utilities, the
construction of streets, and either final site grading or the pouring of concrete pads) is completed
on or after the effective date of floodplain regulations adopted by a community.
Non-Residential means, but is not limited to; small business concerns, churches, schools, farm
buildings (including grain bins and silos), pool houses, clubhouses, recreational buildings,
mercantile structures, agricultural and industrial structures, warehouses, and hotels and motels
with normal room rentals for less than 6 months duration.
North American Vertical Datum (NAVD) of 1988 means a vertical control, corrected in 1988,
used as a reference for establishing varying elevations within the floodplain.
Obstruction means, but is not limited to, any dam, wall, wharf, embankment, levee, dike, pile,
abutment, protection, excavation, channel construction, bridge, culvert, building, wire, fence,
rock, gravel, refuse, fill, structure, vegetation or other material in, along, across or projecting into
any watercourse which may alter, impede, retard or change the direction and/or velocity of the
flow of water, or due to its location, its propensity to snare or collect debris carried by the flow
of water, or its likelihood of being carried downstream.
One Percent Flood (aka 100-Year Flood) is the flood that has a one percent chance of being
equaled or exceeded in any given year. Any flood zone that begins with the letter A or V is
subject to inundation by the one percent chance flood. Over the life of a 30-year loan, there is a
26-percent chance of experiencing such a flood within the SFHA.
Participating Community is any community that voluntarily elects to participate in the NFIP by
adopting and enforcing floodplain management regulations that are consistent with the standards
of the NFIP.
Post-FIRM Construction means new construction and substantial improvements for which start
of construction occurred after December 31, 1974, or on or after the effective date of the initial
FIRM of the community, whichever is later.
3986829.1/00520.00006
Pre-FIRM Construction means new construction and substantial improvements for which start
of construction occurred on or before December 31, 1974, or before the effective date of the
initial FIRM of the community, whichever is later.
Probation is a means of FEMA formally notifying participating communities of the first of the
two NFIP sanctions due to their failure to correct violations and deficiencies in the
administration and enforcement of the local floodplain management regulations.
Public safety and nuisance means anything which is injurious to the safety or health of an entire
community or neighborhood, or any considerable number of persons, or unlawfully obstructs the
free passage or use, in the customary manner, of any navigable lake, or river, bay, stream, canal,
or basin.
Recreational vehicle means a vehicle that is:
a.)
Licensed and titled as an RV or park model (not a permanent residence);
b.)
Built on a single chassis;
c.)
400 square feet or less when measured at the largest horizontal projection;
d.)
Has no attached deck, porch, or shed;
e.)
Has quick-disconnect sewage, water, and electrical connectors;
f.)
Designed to be self-propelled or permanently towable by a light duty truck, and;
g.) Designed primarily not for use as a permanent dwelling but as temporary
living quarters for recreational, camping, travel, or seasonal use.
Regular Program means the second phase of the community’s participation in the NFIP in
which second layer coverage is available based upon risk premium rates only after FEMA has
competed a risk study for the community.
Regulatory floodway means the channel of a river or other watercourse and the adjacent land
areas that must be reserved in order to discharge the base flood without cumulatively increasing
the water surface elevation more than one foot.
Repair means the reconstruction or renewal of any part of an existing building for which the
start of construction commenced on or after the effective date of a floodplain management
regulation adopted by a community and all such regulations effective at the time of permitting
must be met.
3986829.1/00520.00006
Repetitive Loss means flood-related damages sustained by a structure on two separate occasions
during a 10-year period for which the cost of repairs at the time of each such flood event, on the
average, equals or exceeds 25 percent of the market value of the structure before the damage
occurred.
Repetitive Loss Property is any insurable building for which two or more claims of more than
$1,000 were paid by the National Flood Insurance Program (NFIP) within any rolling 10-year
period, since 1978. At least two of the claims must be more than ten days apart but, within ten
years of each other. A RL property may or may not be currently insured by the NFIP.
Section 1316 means that section of the National Flood Insurance Act of 1968, as amended,
which states that no new flood insurance coverage shall be provided for any property that FEMA
finds has been declared by a duly constituted state or local zoning authority or other authorized
public body to be in violation of state or local laws, regulations, or Regulations that are intended
to discourage or otherwise restrict land development or occupancy in flood-prone areas.
Severe Repetitive Loss Structure means any insured property that has met at least one of the
following paid flood loss criteria since 1978, regardless of ownership:
1. Four or more separate claim payments of more than $5,000 each
(including buildings and contents payments); or
2. Two or more separate claim payments (building payments only) where the
total of the payments exceeds the current market value of the property.
In either case, two of the claim payments must have occurred within ten years of each other.
Multiple losses at the same location within ten days of each other are counted as one loss, with
the payment amounts added together.
Significant hazard dam means a dam assigned the significant hazard potential classification
where failure may cause damage to main roads, minor railroads, or cause interruption of use, or
service of relatively important public utilities.
Special flood hazard area (SFHA) means that portion of the floodplain subject to inundation by
the base flood and/or flood-related erosion hazards as shown on a FHBM or FIRM as Zones A,
AE, AH, AO, AR, AR/AE, AR/AO, AR/AH, AR/A, A99, or VE.
Start of construction (for other than new construction or substantial improvements under the
Coastal Barrier Resources Act P. L. 97-348), includes substantial improvement, and means the
date the building permit was issued, provided the actual start of construction, repair,
reconstruction, or improvement was within 180 days of the permit date. The actual start means
the first placement of permanent construction of a building (including a manufactured home) on
a site, such as the pouring of slabs or footings, installation of piles, construction of columns, or
3986829.1/00520.00006
any work beyond the stage of excavation or placement of a manufactured home on a foundation.
Permanent construction does not include land preparation, such as clearing, grading and filling;
nor does it include the installation of streets and/or walkways; nor does it include excavation for
a basement, footings, piers or foundations or the erection of temporary forms; nor does it include
the installation on the property of accessory buildings, such as garages or sheds not occupied as
dwelling units or not part of the main building. For substantial improvement, the actual start of
construction means the first alteration of any wall, ceiling, floor, or other structural part of a
building, whether or not that alteration affects the external dimensions of the building.
Structure (for floodplain management purposes), means a walled and roofed building, including
a gas or liquid storage tank that is principally above ground, as well as a manufactured home.
Structure (for insurance purposes), means a building with two or more outside rigid walls and a
fully secured roof, that is affixed to a permanent site; a manufactured home built on a permanent
chassis, transported to it site in one or more sections, and affixed to a permanent foundation; or a
travel trailer without wheels, built on a chassis and affixed to a permanent foundation, that is
regulated under the community’s floodplain management and building Regulations or laws. The
term does not include a recreational vehicle or a park trailer or other similar vehicle, except as
described in the last part of this definition, or a gas, or a liquid storage tank.
Subrogation means an action brought by FEMA when flood damages have occurred, a flood
insurance claim has been paid, and all or part of the damage can be attributed to acts or
omissions by a community or other third party.
Substantial Damage means damage of any origin sustained by a structure whereby the cost of
restoring the structure to its before damaged condition would equal or exceed 50 percent of the
market value of the structure before the damage occurred. Substantial damage also means flood-
related damages sustained by a structure on two separate occasions during a 10-year period for
which the cost of repairs at the time of each flood event, on the average, equals or exceeds 25
percent of the market value of the structure before the damage occurred
Substantial Improvement means any combination of reconstruction, rehabilitation, or other
improvement of a structure taking place over a designated 10-year period in which the
cumulative percentage of improvement equals or exceeds 50 percent of the current market value
of the structure before the “start of construction” of the improvement. The designated 10-year
period begins at the date of the initial improvement to the structure. The costs for determining
substantial improvement include the costs of additions. This term includes structures which have
incurred repetitive loss or substantial damage, regardless of the actual repair work performed.
The term does not apply to:
a.) Any project for improvement of a building required to comply with
existing health, sanitary, or safety code specifications which have been identified by
the Code Enforcement Official and which are solely necessary to assure safe living
3986829.1/00520.00006
conditions, provided that said code deficiencies were not caused by neglect or lack of
maintenance on the part of the current or previous owners or;
b.) Any alteration of a “historic structure” provided that the alteration will not
preclude the structure’s continued designation as a “historic structure.”
Substantially improved existing manufactured home parks or subdivisions means
manufactured home parks or subdivisions where the repair, reconstruction, rehabilitation or
improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the
streets, utilities and pads before the repair, reconstruction or improvement commenced.
Suspension means the removal, with or without probation, of a participating community from
the NFIP because the community failed to adopt and enforce the compliant floodplain
management regulations required for participation in the NFIP.
VE Zone see Coastal High Hazard Area.
Variance is a grant of relief from the requirements of this Regulation.
Violation means the failure of a structure or other development to be fully compliant with this
Regulation. A structure or other development without the elevation certificate, other
certifications, or other evidence of compliance required in this Regulation is presumed to be in
violation until such time as that documentation is provided.
Watercourse means any flowing body of water including a river, creek, stream, or a branch.
Water surface elevation means the height, in relation to the National Geodetic Vertical Datum
(NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, (or other datum, where
specified) of floods of various magnitudes and frequencies in the floodplains of coastal or
riverine areas.
Wet floodproofing means a method of construction which allows water to enter a structure in
such a way that will minimize damage to the structure and its contents. Wet floodproofing is
appropriate for functionally dependent use and uses that facilitate open space use by variance
only, structures utilized for parking or limited storage, or when all other techniques are not
technically feasible. Wet floodproofing shall not be utilized as a method to satisfy the
requirements of this Regulation for bringing substantially damaged or improved structures into
compliance. Wet floodproofing is not allowed in lieu of complying with the lowest floor
elevation requirements for new residential buildings.
X Zones (shaded) are areas of 0.2 percent chance flood that are outside of the SFHA subject to
the one percent chance flood with average depths of less than one foot, or with contributing
3986829.1/00520.00006
drainage area less than one square mile, and areas protected by certified levees from the base
flood.
X Zones (unshaded) are areas determined to be outside the 0.2 percent chance floodplain.
Zone means a geographical area shown on a Flood Hazard Boundary Map or a Flood Insurance
Rate Map that reflects the severity or type of flooding in the area.