33 MAC Pt. 2, R. 3.7.2.3

The contractor, registered engineer, and the loan recipient must furnish the

Year: 2026Length: 83 wordsOfficial source

Cite as 33 Miss. Admin. Code Pt. 2, R. 3.7.2.3

The contractor, registered engineer, and the loan recipient must furnish the Department with every reasonable opportunity and means for determining whether the loan recipient and registered engineer are assuring that the work is in accordance with the requirements of the approved plans, specifications and contract documents. The Department is authorized to observe and require submission by the loan recipient of daily logs, full scale record drawings, file notes, and any other documents prepared by any party in relation to the DWSIRLF funded project.
33 MAC Pt. 2, R. 3.7.2.3: The contractor, registered engineer, and the loan recipient must furnish the | Justis AI