33 MAC Pt. 8
Drinking Water Systems Improvements Revolving Loan Fund Program Regulations
Cite as 33 Miss. Admin. Code Pt. 8
- 1 -
FINAL
STATE OF MISSISSIPPI
LOCAL GOVERNMENTS AND RURAL WATER SYSTEMS IMPROVEMENTS BOARD
Title 33: Public Health - Local Governments & Rural Water Systems Improvements Board
Part 8: Drinking Water Systems Improvements Revolving Loan Fund Program Regulations
STATE OF MISSISSIPPI
DRINKING WATER SYSTEMS IMPROVEMENTS
REVOLVING LOAN FUND PROGRAM
FINAL
FFY-2017 INTENDED USE PLAN
Presented to the Board for Adoption
on January 20, 2017
LOCAL GOVERNMENTS AND RURAL WATER SYSTEMS
IMPROVEMENTS BOARD
P. O. BOX 1700 SUITE U-232
JACKSON, MISSISSIPPI 39215-1700
- 2 -
(Blank)
- 3 -
FINAL
STATE OF MISSISSIPPI
LOCAL GOVERNMENTS AND RURAL WATER SYSTEMS IMPROVEMENTS BOARD
Title 33: Public Health - Local Governments & Rural Water Systems Improvements Board
Part 8: Drinking Water Systems Improvements Revolving Loan Fund Program Regulations
DRINKING WATER SYSTEMS IMPROVEMENTS REVOLVING LOAN FUND
FFY-2017 INTENDED USE PLAN
TABLE OF CONTENTS
I.
INTRODUCTION
A. State of Mississippi’s Drinking Water State Revolving Fund
B. Program Overview
C. Public Input, Review, and Comment Procedures
II.
GOALS OF MISSISSIPPI’S DRINKING WATER SYSEMS
IMPROVEMENTS REVOLVING LOAN FUND (DWSIRLF)
PROGRAM
A. Basic Goals
B. Long-Term DWSIRLF Goals
C. Short-Term DWSIRLF Goals
III.
STRUCTURE OF MISSISSIPPI DWSIRLF
A. DWSIRLF Loan/Operations Fund
1. Types of Eligible Projects:
2. Set-aside Accounts:
B. DWSIRLF State Match Funds
C. Drinking Water Systems Emergency Loan Fund (DWSELF)
IV.
FINANCIAL STATUS OF THE DWSIRLF
A. Source and Use of Fund
1. Federal Allotment
2. State Match Requirements
3. Loan Increase Reserve
B. Financial Planning Process
1. Efficient Bond Management
2. Interest Rate Determination
3. Investment
C. Financial Terms of Loans
1. Funding Limit
2. Interest Rate
3. Administration Fee
4. FFY-2017 Appropriation Special Provisions
5. Other Related Issues
- 4 -
- 5 -
V.
SET-ASIDE ACTIVITIES
A. Administration
B. Small System Technical Assistance
C. State Program Management
D. Local Assistance and Other State Programs
VI.
PRIORITY SYSTEM
A. Funding and Ranking Rationale
1. Funding Lists and Bypass Procedure
2. FFY-2017 Green Infrastructure Requirement
3. Loan Decreases
4. Match for Special Appropriations Project (SPAP) Grants
5. Subsidization from FFY-2017 Federal Appropriation
B. Priority System Categories
C. Priority Ranking Criteria
D. Priority System Deadlines
VII.
FFY-2017 PRIORITY LIST
VIII.
EXPECTED PUBLIC HEALTH OUTCOMES & PERFORMANCE
MEASURES
APPENDICES
A. FFY-2017 Anticipated Available Funds for the Mississippi Drinking
Water Improvements Revolving Loan Fund (DWSRF) Program
FFY-2016 End of Year Funds Report-Mississippi DWSIRLF Program --
October 1, 2016
B. PROJECTED SCHEDULE OF OUTLAYS
C. PROJECTED PAYMENT (FEDERAL LETTER OF CREDIT)
SCHEDULE
D. PROJECTED SCHEDULE OF DRAWDOWNS AGAINST FEDERAL
LETTER OF CREDIT
E. MISSISSIPPI SMALL SYSTEMS TECHNICAL ASSISTANCE SET-
ASIDE WORK PLAN
F. MISSISSIPPI STATE PROGRAM MANAGEMENT SET-ASIDE
ANNUAL WORK PLAN
G. LOCAL ASSISTANCE AND OTHER STATE PROGRAMS ANNUAL
WORK PLAN
H. MISSISSIPPI STATE PROGRAM SET-ASIDE MATCH
REQUIREMENTS – MISSISSIPPI 1:1 REQUIREMENT FOR FFY-2017
STATE PROGRAM MANGEMENT SET-ASIDE
I. COORDINATION SCHEDULES FOR JOINTLY FUNDED PROJECTS
J. DRINKING WATER SYSTEMS EMERGENCY LOAN FUND
PROGRAM
K. CERTIFICATIONS
I.
Introduction
A. State of Mississippi’s Drinking Water State Revolving Loan Fund
The Safe Drinking Water Act Amendments of 1996 (SDWA) established the national
Drinking Water State Revolving Fund (DWSRF) Program. That program allows the
Environmental Protection Agency (EPA) to make capitalization (Cap) grants to states to,
in turn, provide low cost loans to public water systems to help achieve or maintain
compliance with SDWA requirements. Accordingly, the State Legislature (through
Section 41-3-16, MS Code of 1972 Annotated) created what is now called the Drinking
Water Systems Improvements Revolving Loan Fund (DWSIRLF) Program, to receive the
federal DWSRF capitalization grants from EPA, and to provide low cost loans to the
state’s public water systems to finance needed infrastructure improvements. This
legislation also allows the DWSIRLF, subject to the authority of State Law, to make
loans that may utilize additional subsidization beyond standard DWSIRLF loans as well
as setting appropriate criteria to determine eligible recipients.
That same legislation created the "Local Governments and Rural Water Systems
Improvements Board" (Board), to oversee the administration of the DWSIRLF Program.
The Mississippi State Department of Health (Department), as the state’s drinking water
primacy agency, supplies the staff and facilities necessary to administer the program.
The Board is composed of the following nine (9) members: the State Health Officer, who
shall serve as chairman of the Board; the Executive Director of the Mississippi
Development Authority; the Executive Director of the Department of Environmental
Quality; the Executive Director of the Department of Finance and Administration; the
Executive Director of the Mississippi Association of Supervisors; the Executive Director
of the Mississippi Municipal League; the Executive Director of the American Council of
Engineering Companies; the State Director of the United States Department of
Agriculture, Rural Development; and a manager of a rural water system. Each agency
director may appoint a designee to serve in his or her place on the Board. The rural water
system manager is appointed by the Governor. In the creation of the Program it was the
intent of the Legislature that the Board endeavor to ensure that the costs of administering
the DWSIRLF Program are as low as possible in order to provide the water consumers of
Mississippi with safe drinking water at affordable prices.
As a condition of receiving the DWSRF Cap grants, the SDWA requires that each state
annually prepare an Intended Use Plan (IUP) designed to outline how a state will utilize
DWSRF funds to assist in protecting public health. The DWSIRLF Fund consists of both
state and federal funds. Federal funds are provided to the states in the form of awarded
Cap grants. Each state’s allotment of those grants is based on EPA’s Needs Survey that
is performed every four years. State matching funds totaling 20% of the federal grant
amount to that state are required to be deposited into the Fund and have historically been
provided through the issuance of bonds; however, in 2014 the State legislature began
providing the required State match funds as a direct agency appropriation. The purpose
of this IUP is to convey the State of Mississippi’s (State) DWSRF plan for Federal Fiscal
Year (FFY) 2017 to EPA, other state agencies, the state’s public water supplies, and the
general public.
B. Program Overview
The basic framework under which the DWSIRLF Program operates is established by two
documents. The first document is the Drinking Water State Revolving Fund Loan
Program Operating Agreement (Operating Agreement) between the Mississippi State
Department of Health and the Environmental Protection Agency, Region IV. The current
Operating Agreement was agreed to by both parties and approved on February 3, 2009.
The Operating Agreement establishes the basic framework of the DWSIRLF that is not
expected to change from year-to-year. The second document is the IUP which describes
how the State of Mississippi will use the funding received from the EPA Cap grant which
is received each year.
The amount of the FFY-2017 Cap Grant from EPA for Mississippi is not known at this
time; therefore, the grant amount received by Mississippi in FFY-2016 will be used in
this IUP for planning purposes until the actual Cap Grant amount is known. A Cap Grant
amount of $8,607,000 will be used for these purposes. The FFY-2017 DWSRF Cap
grant application will request an amount of $8,607,000; these funds must be used in the
time period of July, 2017, through June, 2021. The FFY-2017 IUP will show in detail the
goals (basic, long-term and short-term), the structure, and the financial status of the
Program; the role of the set-aside activities within the state; and most importantly, the
distribution of funds towards public water system improvements projects and the criteria
used to determine their ranking within the priority system. Those desiring to receive a
copy of this document may contact Ulysses Conley, Program Support Specialist, at (601)
576-7518.
C. Public Input, Review, and Comment Procedures
To ensure that the public has an ample opportunity to review and comment upon the IUP,
the Department and the Board follows the requirements of the “Mississippi
Administrative Procedures Law” prior to final submission of the IUP to EPA. A public
notice period of at least twenty-five (25) days allows for review and comment before an
oral proceeding. After adoption by the Board, a second filing with the Secretary of
State’s Office occurs; if no additional comments are received the IUP becomes law 30
days after the second filing.
Public notice will be given in The Clarion Ledger, a newspaper of statewide circulation,
for written and oral comments on this IUP. An oral proceeding is scheduled for 9:00 a.m.
on Thursday, January 12, 2017. A transcript of the oral proceeding, recording any
comments and recommended solutions, will be submitted to EPA along with the Final
IUP. Those desiring to receive a copy of the oral proceeding transcript should contact
Ulysses Conley, Program Support Specialist, at (601) 576-7518. A copy of the
“Mississippi Administrative Procedures Law” may be obtained from the Mississippi
Secretary of State’s Office, and can also be found on the Mississippi State Department of
Health’s website at www.healthyms.com/dwsrf.
II.
Goals of Mississippi’s Drinking Water Systems Improvements Revolving Loan
Fund (DWSIRLF) Program
The Board has established certain goals for the DWSIRLF Program with the objective of
improving the Program on an ongoing basis. The goals have been classified into three
categories that include basic, long-term, and short-term. These goals were developed to
address the necessary requirements of federal and state regulations, as well as the state’s
need and desire to maintain and enhance the Program. Congress and the State of
Mississippi have placed particular emphasis on assisting smaller drinking water systems
under the DWSIRLF to ensure that these systems have adequate technical, managerial,
and financial resources to achieve or maintain compliance and provide safe drinking
water.
A. Basic Goals
1. Maintain a financially sound DWSIRLF in perpetuity; meet a portion of the drinking
water needs in the state within a reasonable period of time; and fund projects in order
of public health importance. Attaining these basic goals will help ensure that
Mississippi's drinking water supplies remain safe and affordable, and that those
public water systems that receive funding will be properly operated and maintained.
2. Determine the DWSIRLF’s yearly interest rate, taking into consideration that it must
be competitive with the private sector, as well as with other available funding sources
within the state. This will ensure the timely use of available funds, as well as ensure
sufficient income is generated to provide for the perpetuity of the Fund. Further
details of loan terms and priority ranking are outlined in Sections IV and VI of this
IUP.
B. Long-Term DWSIRLF Goals
1. Enhance and/or improve loan application and repayment procedures. MSDH
intends to periodically evaluate the existing Program requirements and procedures
to determine ways to streamline the DWSIRLF Program’s application and
repayment procedures, making it more user-friendly, attractive and beneficial to
loan recipients, while ensuring continued compliance with all federal and state
regulations and requirements.
2. Program staff are exploring the feasibility of creating a universal web-based
ranking form for all lending agencies within the state. The proposed form would
ask a few simple questions, recommend a lending program based on the
responses, and submit the ranking form to the appropriate agency. This could
help potential loan recipients find the program that is right for their water utility,
quickly and easily.
3. Continue programs to protect the State’s ground water by using designated funds
from the Cap grants to fund abandonment and plugging of wells. Since FFY-
2012 the Program has been using the Local Assistance and Other State Programs
set-asides to properly abandon inactive wells and open holes. Inactive wells and
open holes are potential avenues of contamination to the aquifer and a danger to
humans. This program is a worthwhile endeavor that will protect the source water
of the state’s water supplies.
4. Develop a tracking system to manage programmatic and financial documentation.
A tracking system will provide DWSIRLF loan recipients and their
representatives an opportunity to view the status and/or location of documents
mailed to the Program for review and/or processing. This tracking system will
also assist Program staff in tracking/monitoring program documentation reviews
as well as disbursements.
5. Develop a comprehensive engineering project manager (PM) manual. The
Bureau of Public Water Supply continues to make changes to the personnel
involved with the DWSIRLF Program as the need arises. A comprehensive
manual for project management will help ensure new PMs will have all the
necessary tools and reference materials at their disposal to ensure the ongoing
project flow will be uninterrupted. Since regulations change periodically, once
the manual is completed it will be maintained by assigned staff.
C. Short-Term DWSIRLF Goals
1. Enhance and/or improve the Program by making it more attractive to public water
systems. The evaluation of this goal will be based on input received from “one-
on-one” visits with staff at engineering firms, town conferences, and general
feedback obtained from loan recipients and consulting engineers during the loan
process. These meetings will be conducted with firms currently participating in
the DWSIRLF Program to collect data regarding the effectiveness of the loan
application process currently being implemented.
2. Explore the possibility of developing web-based checklists and forms to
electronically store and process project management information.
3. Assist applicants in addressing capacity assessment deficiencies found during
annual inspections by using technical solutions afforded by the technical
assistance set-aside contractors. New or forthcoming regulations may make this a
key goal in the future.
4. Train new staff members using available training sessions provided by EPA
Region IV staff.
5. Meet special funding goals: The FFY-2017 federal appropriation may introduce
additional provisions that will require additional compliance monitoring, thus
creating an additional burden to the Program.
6. Automatic repayment collection system: Continue the implementation of an
automatic repayment collection system; many loan recipients in the Program’s
repayment mode desire an automatic electronic repayment system as is available
in the public sector. The DWSIRLF, by instituting this payment option, will
ensure a more timely receipt of monthly repayments, as well as make the
repayment process much more convenient for our loan recipients.
III.
Structure of the Mississippi DWSIRLF
The Mississippi DWSIRLF is structured around three separate funds that sustain the
Program and help it achieve the basic, short-term, and long-term goals. The funds are
broken down further into designated accounts, each having a specific function.
A. DWSIRLF Loan/Operations Fund
Monies in the Fund support a majority of the functions of the DWSIRLF. These
functions include: program administration, set-aside operations, and most importantly
provide disbursements to public water systems for eligible projects. The DWSIRLF
is a reimbursement program, meaning that after the loan is awarded, costs associated
with planning, designing and constructing the project are reimbursed to the recipient.
Cap grants from EPA, loan repayments and interest earnings are deposited into this
Fund.
1. Types of Eligible Projects:
Many types of projects are eligible for funding by the Program. For a more
detailed explanation of eligible costs for projects, please reference Appendix A of
the DWSIRLF Regulations.
2. Set-aside Accounts:
The set-aside accounts reside under the umbrella of the Fund and are distinctly
designated by reporting categories. A listing of the set-asides taken by
Mississippi includes the following:
a. Administrative Set-aside: Provides financial support to administer the loan
Program and other non-project-related activities.
b. Small System Technical Assistance Set-aside: Provides technical assistance
to small water systems through the current contractual services with
Mississippi State University – Extension Service (MSU-ES) and the
Mississippi Rural Water Association (MsRWA).
c. State Program Management Set-aside: Provides additional financial support
to MSDH – Bureau of Public Water Supply for Public Water System
Supervision Program.
d. Local Assistance and Other State Programs: Provides funding for the
implementation of a wellhead protection program through current contractual
services with the Mississippi Rural Water Association (MsRWA) and a well
decommissioning contractor.
B. DWSIRLF State Match Funds
As required by the SDWA, the State of Mississippi must match the Cap grant with
state funds equaling 20% of the federal allotment. Mississippi historically has
received the required 20% state match from the sale of General Obligation bonds
authorized by the State Legislature and sold by the Mississippi State Bond
Commission; however, since the 2014 legislative secession, the State Legislature has
authorized a direct appropriation for the state match. While state match monies are
maintained separately from the Fund for accounting purposes, they are still
considered to be under the “umbrella” protection of the DWSRF Fund.
C. Drinking Water Systems Emergency Loan Fund (DWSELF)
The DWSELF Fund contains state monies that are utilized only for public water
supply loans which meet the definition of emergency. For further information see
Appendix J.
IV.
Financial Status of the DWSIRLF
This section outlines all sources of funding available to the DWSIRLF Program and
indicates intended uses. This section also describes the financial assistance terms
available through the Program.
A. Source and Use of Funds
The amount of the FFY-2017 Cap Grant from EPA for Mississippi is not known at
this time; therefore, the grant amount received by Mississippi in FFY-2016 will be
used in this IUP for planning purposes until the actual Cap Grant amount is provided.
A Cap Grant amount of $8,607,000 is used for these purposes. Funding amounts and
their use are outlined in Appendix A.
Using an anticipated FFY-2017 EPA Capitalization Grant allotment for Mississippi of
$8,607,000 a 20% state match of $1,721,400 is required; this provides an anticipated
amount of $10,328,400 for both loans and set-aside activities.
With $2,108,680 being utilized for set-aside activities $8,219,720 will remain for
loans to Mississippi public water supplies; additionally, unobligated funds from the
previous year, anticipated loan repayments and interest earnings (all of which are not
classified as state match) will also be available as additional funding sources.
The FFY-2017 “Set-aside” use for the standard Cap grant is outlined in Section V of
this IUP. Necessary work plans showing utilization of these funds are found at the
end of this IUP.
1. Federal Allotment
If the FFY-2017 Capitalization Grant for Mississippi is $8,607,000 the state
match requirement to federal grant funds (cash draw ratio) will be 20.94% state
match funds to 79.06% federal grant funds; this requirement will be stated in the
grant application.
2. State Match Requirements
Until 2014 the state 20% match was provided through the sale of General
Obligation bonds authorized by the State Legislature. The Legislature passed
House Bill No. 209 to establish a Local Governments and Rural Water Systems
Improvements Revolving Loan Program and authorized the sale of $15,000,000 in
General Obligation Bonds which were deposited into the Fund. As stated in the
law, one of the purposes for these funds is that, “All or any portion of the monies
in the fund may be used to match any federal funds that are available for the same
or related purposes for which funds are used and expended under this act.”
Initially, $10,000,000 of these General Obligation bonds were sold in May of
1997 and the proceeds were deposited into the Fund on May 29, 1997. Later, the
remaining $5,000,000 of the original bonding authority was sold and deposited
into the Fund on October 5, 2000.
ď‚· $3,294,840 was used as match for the FFY-1997 Cap grant,
ď‚· $1,654,340 was used as match for the FFY-1998 Cap grant,
ď‚· $1,733,900 was used as match for the FFY-1999 Cap grant,
ď‚· $1,802,020 was used as match for the FFY-2000 Cap grant,
ď‚· $1,809,480 was used as match for the FFY-2001 Cap grant,
ď‚· $1,610,500 was used as match for the FFY-2002 Cap grant,
ď‚· $1,600,820 was used as match for the FFY-2003 Cap grant,
ď‚· $1,494,100 was used as match for $7,470,500 of the FFY-2004 Cap grant.
During the Spring 2003 Legislative Session, the Legislature provided the Board
with an additional $130,000 in bonding authority. Additionally, during the Spring
2004 Legislative Session, the Legislature authorized $1,613,000 in general
obligation bonds. A total of $1,740,000 was deposited in the DWSIRL Fund
during the 1st Quarter of FFY-2005.
ď‚· $129,776 was used as match for $648,880 of the FFY-2004 Cap grant.
ď‚· $36,744 was used as match for $183,720 which was the remaining FFY-
2004 Cap grant.
ď‚· $1,573,480 was used as match for $7,867,400 of the FFY-2005 Cap grant.
During the 2006 Regular Legislative Session, the Legislature authorized the sale
of general obligation bonds in the amount of $4,003,000, which were sold and
deposited in the SRF Fund during the 1st Quarter of FFY-2007. After paying the
issuance cost of $2,128.26:
ď‚· $83,620 was used to match the remaining $418,100 of the FFY-2005 Cap
grant.
ď‚· $1,645,860 was used to match the FFY-2006 Cap grant ($8,229,300).
ď‚· $1,645,800 was used to match the FFY-2007 Cap grant ($8,229,000).
ď‚· $625,591 was used to match a portion ($3,127,955) of the FFY-2008 Cap
grant.
During the 2008 Regular Legislative Session, the State Legislature authorized an
additional $4,000,000 in general obligation bonds which were sold and deposited
into the Fund during the 1st Quarter of FFY-2009. After paying issuance costs of
$2,256.05:
ď‚· $1,003,609 was used to match the remaining FFY-2008 Cap grant.
ď‚· $1,629,200 was used to match the FFY-2009 Cap grant ($8,146,000).
ď‚· $1,364,935 was used to match a portion of the FFY-2010 Cap grant or
$6,824,675.
During the 2010 Regular Legislative Session, the State Legislature authorized an
additional $1,400,000 in general obligation bonds which were sold and deposited
into the Fund during the 4th Quarter of FFY-2010. After paying issuance cost of
$9,087:
ď‚· $1,390,913 was used to match a portion ($6,954,566) of the FFY-2010
Cap grant.
During the 2011 Regular Legislative Session, the State Legislature authorized an
additional $2,700,000 in general obligation bonds which were sold and deposited
into the Fund during the 4th Quarter of FFY-2011. After paying issuance and
discount costs of $13,105:
ď‚· $69,152 was used to match the remaining FFY-2010 Cap grant
($345,760).
ď‚· $1,960,400 was used to match the FFY-2011 Cap grant (9,802,000).
ď‚· $1,834 was used to match $9,166 which was transferred to DWSIRLF
from the remaining balance of the MS Operator Certification Grant for
making additional loans.
ď‚· The remaining $655,509 was used to match $3,277,545 of the FFY-2012
capitalization grant leaving a balance of $6,063,455 to be matched.
During the 2013 Regular Legislative Session, the State Legislature authorized an
additional $1,000,000 in general obligation bonds. These bonds were sold and the
funds were deposited into the DWSIRLF in December 2013. No issuance or
discount costs were charged, therefore, the full $1,000,000 bond amount is
available to match a portion ($1,902,240) of the FFY-2013 Cap grant and match a
portion of ($3,097,760) of the remaining FFY-2012 Cap grant. The $1,000,000
state bond funds will be used as follows.
ď‚· $380,448 will match the FFY-2013 Cap Grant Set-aside amount
($1,902,240).
ď‚· $619,552 will match $3,097,760 of the remaining FFY-2012
Capitalization Grant.
ď‚· $593,139 from the Drinking Water Systems Emergency Loan Fund
(DWSELF) will be used to complete the match of the remaining FFY-
2012 Capitalization Grant ($2,965,695). (That portion of the DWSELF
which exceeds the $5,000,000 initially deposited in the fund may be used
to match capitalization grant funds).
ď‚· $26,861 remaining from the $620,000 used from the DWSELF Fund will
be used to match a portion ($134,305) of the FFY-2013 Cap Grant.
During the 2014 Regular Legislative Session, the State Legislature (House Bill
No. 1495) authorized $1,000,000 in direct funding for the DWSRF program and
the use of $2,000,000 in an existing MSDH account for the DWSRF program.
Additionally, $180,000 was used from the Drinking Water Systems Emergency
Loan Fund (DWSELF). The total of all the state match funds matched all
outstanding EPA Grant funds; the remaining portion of the FFY-2013 Cap Grant
($6,727,455) and the total FFY-2014 Cap Grant ($9,159,000). The $3,180,000 of
state funds was used as follows.
ď‚· $1,345,491 matched the remainder of the FFY-2013 Cap Grant amount
($6,727,455).
ď‚· $1,831,800 matched the FFY-2014 Capitalization Grant ($9,159,000).
ď‚· $2,709 from the Drinking Water Systems Emergency Loan Fund
(DWSELF) will remain to be used as match for future Capitalization
Grants.
During the 2015 Regular Legislative Session, the State Legislature (House Bill No.
1555) authorized $1,200,000 in direct funding for the DWSRF program; however,
in July 2015 due to a shortfall in State funds the authorized $1,200,000 was reduced
by $99,520.00 to $1,100,479.80. In January 2016, due to a continuing shortfall in
State revenue the Governor mandated an additional $18,000 be reduced from the
State match funds authorized by the 2015 Legislature, this reduced the authorized
State match to $1,082,479.80. In March 2016, $35,509.77 was returned to the State
match funds; in April 2016 an additional $5,180.00 was removed from the State
match funds; then in May 2016 $64,010.43 was returned to the State match funds.
With all the removals and returns the final amount provided by the 2015 State
Legislature was $1,176,820.
In September 2015, EPA reduced the amount of the FFY-2015 Federal Cap Grant
to $9,099,000 at the award of the FFY-2015 Cap Grant to comply with Federal debt
reduction requirements; therefore, a 2015 State match of only $1,819,800 was
needed for the FFY-2015 Cap Grant. The difference between the required 2015
State match and the available 2015 State match is $642,980.00.
To provide the remainder of the required 2015 State match for the FFY-2015 Cap
Grant, the following amounts were available or transferred in 2015 from the
Drinking Water Systems Emergency Loan (DWSELF) Fund;
ď‚· $2,709 remaining from a DWSELF transfer for the FFY-2014 Cap Grant
match.
ď‚· $728,611.20 transferred from the DWSELF Fund in August 2015 for the
original FFY-2015 Cap Grant amount match.
ď‚· $6,000 transferred from the DWSELF Fund in February 2016 after the
second reduction in the FFY-2015 Cap Grant match by the State.
The transfers from the Drinking Water Systems Emergency Loan Fund (DWSELF)
in 2015 provided an amount of $737,320.20; only $642,980.00 is required,
therefore, an amount of $94,340.20 remains to be used as match for the FFY-2016
Capitalization Grant.
During the 2016 Regular Legislative Session, the State Legislature (House Bill
No. 1651 Amended) authorized $1,220,000 in direct funding for the DWSRF
program. The FFY-2016 EPA Cap Grant amount is $8,607,000; the required
State match amount is $1,721,400. In September 2016 due to a continuing
shortfall in State revenue the Governor mandated that the funds authorized by the
2016 Legislature be reduced by $19,834 to $1,200,166. In January 2017 due to
the continuing shortfall in State revenue the Governor mandated a second
reduction in the amount of $17,746; this reduced the available State funds to
$1,182,420. With the $94,340.20 remaining from the match funds for the FFY-
2015 EPA Cap Grant, an additional $444,639.80 will be needed as State match for
the FFY-2016 Capitalization Grant; the Board will be requested to authorize the
use of additional funds from DWSELF as the State match.
It is anticipated that the State Legislature will continue to provide a direct
appropriation for the State’s 20% match portion of the FFY-2017 EPA
Capitalization Grant. If this happens, the match amount would be $1,721,400 for
a grant amount of $8,607,000.
3. Loan Increase Reserve
Beginning in FFY-2003 the Board began to make loan awards after approval of
the facilities plans and loan application, rather than after completion of the project
design. This change in the loan award sequence increased the likelihood that bid
overruns on some projects could be greater than the construction contingency
included in the loan agreement. In order to be able to provide loan increases
(when needed) to existing loans, the Board intends to set-aside the amount
indicated in Appendix A for such loan increases; loan increases will be awarded
on a first-come, first-served basis. Any funds not obligated for these purposes by
the end of the fiscal year may be made available for new loan awards to the
highest ranking project(s) that is ready for loan award at the time funds become
available.
B. Financial Planning Process
In accordance with the Board's desire to maintain a financially sound DWSIRLF loan
Fund in perpetuity, while at the same time meeting a substantial portion of the drinking
water needs in the state within a reasonable period of time, the following financial
decisions were made regarding the Fund:
1. Efficient Bond Management
The Board intends that the MSDH apply for the entire state Cap grant allotment
under the federal DWSRF, including the set-asides described in Section V below.
State bond proceeds obtained shall be deposited into the DWSIRLF Fund and
shall be used as the state match for federal DWSRF Cap grants.
2. Interest Rate Determination
It is the Board’s intention to adjust interest rates such that the demand will equal
the funds available. In order to ensure that this interest rate will be at or below the
prevailing market rates at the time a loan is made, this rate will be compared to
the twenty-year (20) triple-A rated, tax-exempt insured revenue bond yield
published by The Bond Market Association/ Bloomberg (Bloomberg Online,
http://www.bloomberg.com/markets/rates/index.html).
3. Investment
Investment Procedures for Excess Cash - According to the State Treasurer, the
excess cash in the Fund is invested by the State Treasurer in securities prescribed
in Section 27-105-33, et. Seq., of the Mississippi Code of 1972 Annotated, as
amended. The securities in which state funds may be invested include certificates
of deposit with qualified state depositories, repurchase agreements (fully secured
by direct United States Treasury obligations, United States Government agency
obligations, United States Government instrumentalities or United States
Government sponsored enterprise obligations), direct United States Treasury
obligations, United States Government agency obligations, United States
Government instrumentalities or United States Government sponsored enterprise
obligations, and any other open-ended or closed-ended management type
investment company or investment trust registered under the provisions of 15
U.S.C. Section 80(a)-1 et. Seq, provided that the portfolio is limited to direct
obligations issued by the United States of America, United States Government
agency obligations, United States Government instrumentalities or United States
Government sponsored enterprise obligations and to repurchase agreements fully
collateralized by the securities listed above for repurchase agreements.
C. Financial Terms of Loans
The following terms will be used for the purpose of making loans to the public water
systems within the State of Mississippi.
1. Funding Limit
Under state law, the Board has the discretion to set the maximum amount for
DWSIRLF loans. For FFY-2017 a maximum loan amount of $5,000,000 per
borrower has been set by the Board. The Board may allow (on a case-by-case
basis if requested by the borrower and the need has been justified) the maximum
loan limit to be exceeded by a vote of the Board. Furthermore, during FFY-2017,
no more than one loan per borrower will be allowed. At the end of the fiscal year,
in the event that funds are available, systems previously receiving an award
during FFY-2017 may obtain an additional award(s) or an increase to a previous
FFY-2017 award, if no other eligible systems are evident.
2. Interest Rate
All loan terms will be at 1.95% annual interest rate, compounded monthly, with a
maximum 20-year repayment period. The interest will not accrue during
construction, but will commence at the date of completion of the original
construction period.
3. Administration Fee
Revenues to pay for Program administrative costs will be collected through an
administration fee of 5% of the initial loan principal. This fee will be collected
from the interest portion of loan repayments on all FFY-2015 loans.
4. FFY-2017 Appropriation Special Provisions
The Federal 2017 appropriations bill has not been finalized and the final EPA
FFY-2017 Cap Grant allotment amounts and any additional federal requirements
are not known. It is anticipated that subsidization requirements will be required
for the FFY-2017 Cap Grant; the subsidization is expected to be in the form of
“principal forgiveness”, “negative interest rates”, or a combination of the two.
The anticipated amount of subsidization is expected to be a minimum of 20% of
the Cap Grant amount. If the FFY-2017 Cap Grant is $8,607,000 the
subsidization amount would be $1,721,400 (20%) of the Cap Grant amount.
Furthermore, all loans made with all or part FFY-2017 federal appropriation funds
are expected to include the Davis-Bacon Act requirements and American Iron and
Steel requirements. Appropriate language will be added to all FFY-2017 loan
agreements identifying the additional responsibilities for loan recipients. “Green
Infrastructure” requirements are not expected to be an appropriation requirement;
however, the Program will continue to encourage those types of projects to seek
funding from the DWSIRLF.
5. Other Related Issues
a. Type of Assistance Provided: The assistance to be provided under the
DWSIRLF Program will be loans to public, tax-exempt entities which are
authorized under state law to collect, treat, store and distribute piped water for
human consumption; able to enter into a DWSIRLF loan agreement; and have
the ability to repay the DWSIRLF loan. With the funds provided through the
FFY-2017 federal appropriation, the DWSIRLF will be able to make loans
that will have an amount of “principal forgiveness”, if the loan recipient is
designated a disadvantaged community. To insure that the assistance is
dispersed as far as possible, the Board has set a limit ($500,000) which a loan
recipient may receive in subsidy for one loan. Once the limit of the
appropriation subsidy funds has been reached for FFY-2017, loans will return
to the DWSIRLF’s standard terms without principal forgiveness. In all cases,
loans will be for the construction of eligible drinking water production,
treatment and distribution facilities.
b. Project Costs Eligibility: Eligible/allowable project costs will include those
costs that are eligible, reasonable, necessary, and allocable to the project,
within the established project scope and budget, in conformance with the
DWSIRLF regulations and approved by MSDH.
c. Loan Participation: DWSIRLF loan participation will be at 100% of eligible
project costs, less any funding made available from other agencies for these
same eligible project costs.
d. Pre-Award Costs: Project costs incurred prior to loan award will be
DWSIRLF loan eligible provided:
i. The debt is for work under a construction contract for which the “Notice
To Proceed” was issued on or after October 1, 2016, and the DWSIRLF
loan is awarded by September 30, 2017.
ii. The project is in compliance with all applicable DWSIRLF Program
regulations and obtains MSDH approval of all applicable documents prior
to award of the DWSIRLF loan.
iii. The prospective loan recipient agrees that by incurring costs prior to loan
award, it proceeds at its own risk and relieves the Board, the Department,
and the Department’s staff of all responsibility and liability should such
costs later be determined unallowable for any reason or should such
funding not become available for any reason.
iv. The prospective loan recipient agrees that by incurring costs prior to loan
award, no future commitment of funding a refinanced project is provided.
e. Priority List: The FFY-2017 Priority List expires on September 30, 2017.
Projects listed in the FFY-2017 Priority List that do not receive funding by
this date will not be funded under the FFY-2017 funding cycle and will be
subject to the requirements of subsequent IUPs and Priority Lists. Detailed
information for the FFY-2017 DWSIRLF projects is shown in Section VIII of
this IUP. To facilitate the use of FFY-2017 federally appropriated funds, the
priority list may be adjusted to allow funds to be disbursed according to the
federal requirements.
V.
Set-Aside Activities
The SDWA allows each state to set-aside up to 31 percent of its federal Cap grant to
support non-project-related drinking water programs which includes administration of the
loan program, technical assistance to public water systems, state program management,
and other special activities. If the FFY-2017 EPA Capitalization Grant amount is
$8,607,000, the state plans to use $2,108,680 of the FFY-2017 Federal Capitalization
grant to support the non-project-related drinking water programs activities along with an
additional $860,700 in state money needed for state program management match. These
non-project-related programs will be operated by MSDH within the agency itself or
through contracts with other agencies or organizations. Contracts between the MSDH
and other agencies or organizations will be approved by the Board. Work plans showing
how the set-asides funds will be expended are included as appendices within this IUP;
additionally, progress reports will be included in the Annual Report. The state has
elected not to take any additional set-asides from the FFY-2017 Local Assistance and
Other State Programs set-aside, but reserves the right to make revisions to utilize
additional funds from this set-aside. The amount of funds used from the FFY-2017 Cap
Grant-Local Assistance and Other State Programs assistance set-aside will be $750,000
(8.71%).
A. Administration
Standard Capitalization Grant
The state plans to reserve for use at a later date the 4% administrative set-aside from
the FFY-2017 Capitalization Grant ($344,280); the state will use the 4%
administrative set-aside amount previously reserved from the FFY-2010
Capitalization Grant ($282,500) by taking an equal amount from the FFY-2017
Capitalization Grant for the administration of the Program in FFY-2017. Costs
beyond this set aside amount will be paid from the funds generated by the 5%
administrative fee taken from loan repayments. This change will decrease the total
set-aside amount for the FFY-2017 Cap grant from $2,127,120 to $2,065,340.
The state will continue to exercise its right to reserve the Administrative amounts
from the previous Cap Grants; the remaining balance of the FFY-2011 Cap Grant
($392,080), the FFY-2014 Cap Grant ($366,360), the FFY-2015 Cap Grant
($363,960) and the FFY-2016 Cap Grant ($344,280). These amounts are planned to
be taken from future capitalization grants (over the next several years) for
administration of the Program. Reserving previous years’ 4% administrative set-
aside will ensure that the Program will continue to operate with an adequate
DWSIRLF staff for proper management of the Program. The reserved set-aside
amounts are based on the original capitalization grants awarded during those previous
fiscal years.
B. Small System Technical Assistance
Standard Capitalization Grant
The state will use the Small Systems Technical Assistance (2%) set-aside from the
FFY-2017 Cap Grant ($172,140) to provide technical assistance to public water
systems serving areas with populations of 10,000 or less. With approval by the
Board, the state intends to use this set-aside to fund contracts for the following
activities: Special Technical Assistance to Referred Systems; Board Management
Training for Water System Officials; On-Site Technical Assistance; PEER Review
Program; and Hands-on Operator Training. Each of these activities is described in
detail in the State of Mississippi’s Small Systems Technical Assistance Set-Aside
Work Plan included as Appendix F to this IUP.
C. State Program Management
Standard Capitalization Grant
The state intends to use the full 10% set-aside from the FFY-2017 Cap grant
($860,700), as authorized by Section 1452(g)(2) of the Safe Drinking Water Act of
1996 for State Program Management. The funds will be used for Public Water
System Supervision (PWSS) activities conducted under Section 1443(a) of the Act.
These activities are described in more detail in the State of Mississippi’s State
Program Management Set-aside Annual Work Plan included as Appendix G to this
IUP. The state must provide a dollar-for-dollar match (100% match) for the Cap
grant funds used for these activities. The dollar-for-dollar match is in addition to the
twenty (20%) percent state match required for the Cap grant.
The state is allowed to offset the 100% match requirement by claiming credit for
State FFY-2017 PWSS expenditures that exceed the State’s FFY-2017 PWSS match
requirement. The state is further allowed to use state FFY-2017 PWSS expenditures
as a “coupon” to offset the 100% match requirement as long as this amount does not
exceed the amount that can be claimed from FFY-2017 expenditures. The MSDH
Bureau of Public Water Supply has elected to decline the “coupon” since it sees this
as providing no additional monetary benefit to the State Program Management
Program.
A tabulation showing amount and source of funds to satisfy match requirements for
the FFY-2017 State Program Management set-aside is furnished as Appendix H to
this IUP.
D. Local Assistance and Other State Programs
The state intends to use $750,000 (8.71%) of the 15% set-aside amount which is
allowed from the FFY-2017 Cap grant to provide funding for wellhead protection
projects throughout the state. These funds will be used to properly abandon inactive
wells that pose a risk to existing active public water supply source water wells, as
well as the environment.
VI.
Priority System
The SDWA provides the state with the flexibility to determine how to best utilize the Cap
grant. To meet the particular and unique issues facing the public water systems in
Mississippi, SDWA requirements allow states to give priority to those projects which:
o address the most serious risk to human health
o are necessary to ensure compliance with the SDWA requirements
o assist systems most in need, on a per household basis
A. Funding and Ranking Rationale
Projects will be placed on the fundable portion of the Priority List according to both
priority ranking and readiness to proceed. The term “ready to proceed” means that all
loan application requirements established in the Program regulations are met, and all
documents necessary for loan award are approved. If a project cannot reasonably be
expected to meet the Priority System deadlines, then the project will not be placed on
the current year’s Priority List, but will be placed on the Planning List. It is the
Board’s judgment with input from the DWSIRLF staff as to when a project is ready
to proceed. Loans will be awarded to projects (within available funds) that are above
the funding line on the current year’s Priority List, that have met all Priority System
deadlines and are ready to proceed.
1. Funding Lists and Bypass Procedure
Should any projects on the FFY-2017 Priority List (which are above the funding
line) fail to comply with the deadlines in Section D, the project shall be bypassed
and the funds reserved for said project will be released. Released funds will first
be made available to listed projects, to ensure that all projects above the funding
line meeting priority system deadlines are funded. Any remaining funds will be
made available to the highest ranking project(s) shown below the funding line that
is ready for loan award at the time funds become available. If no projects above
the funding line are ready for loan award at the time funds become available,
projects shown below the funding line will be funded on a first-come, first-served
basis as they become ready for loan award and until the released funds are
awarded. This same process will continue as each deadline passes and released
funds become available.
2. FFY-2017 Green Infrastructure Requirement
The FFY-2017 federal appropriation is not expected to require that a percentage
of the funds appropriated for the Revolving Funds be designated for projects that
exhibit the elements of green infrastructure, water efficiency improvements,
energy efficiency improvements or other environmentally innovative projects.
However, projects that wish to be classified in the following elements will be
reported as green infrastructure to the EPA through its “Project and Benefits
Report Database” and noted in the future annual report. Projects may exhibit one
or more of the “green” elements and the details of the project’s “green” content
will be identified in the business case required for each project if the recipient so
chooses.
- Green infrastructure projects include a wide array of practices at multiple
scales; green infrastructure projects will manage wet weather and will maintain
and restore natural hydrology by infiltrating, evapotranspiring and harvesting
and using storm water. On a regional scale, green infrastructure is the
preservation and restoration of natural landscape features, such as forests,
floodplains and wetlands, coupled with policies such as infill and
redevelopment that reduce overall imperviousness in a watershed. On the local
scale, it may consist of site- and neighborhood-specific practices, such as bio-
retention, trees, green roofs, permeable pavements and cisterns.
- Water efficiency projects are designed to use improved technologies and
practices to deliver equal or better services with less water. It encompasses
conservation and reuse efforts, as well as water loss reduction and prevention, to
protect water resources for the future.
- Energy efficiency projects are designed to use improved technologies and
practices to reduce the energy consumption of water projects, use energy in a
more efficient way, and/or produce/utilize renewable energy.
- Environmentally innovative projects include projects that demonstrate new
and/or innovative approaches to deliver services or manage water resources in a
more sustainable way.
Projects desiring to be classified as “green” will be judged for eligibility based on
the guidance supplied by the EPA and that is available at our website
www.healthyms.com/dwsrf. Systems desiring “Green Infrastructure”
classification will be required to present a “business case” establishing
justification for the classification request. Guidance for establishing a “business
case” is available to assist potential loan recipients in preparation of the
documentation.
3. Loan Decreases
Any funds recovered from loan decreases during the year will be used:
a) first to fund bid overruns, if funds from the loan increase reserve are not
sufficient to cover the bid overruns;
b) then to ensure that all projects above the funding line meeting the priority
system deadlines are funded (for at least the amount shown on the priority list)
and
c) then to fund other loans and/or increases on a first-come, first-served basis.
Any funds not obligated for these purposes may be made available for new loan
awards ready to proceed on a first-come, first-served basis.
4. Match for Special Appropriations Project (SPAP) Grants
On October 10, 2001, EPA issued policy memorandum DWSRF 02-01 to notify
regions and states of a change in policy regarding the use of DWSRF monies for
providing local match for SPAP grants. This change in EPA policy will allow the
state to use non-federal, non-state match DWSIRLF funds to provide loans that can
be used as local match for SPAP grants awarded for drinking water projects.
These non-federal, non-state match DWSIRLF loan funds may be made available
to eligible SPAP grant recipients that are on the priority list for use as local match
funds for their SPAP grants, provided the grant is for loan eligible work. Such
projects will be funded in accordance with the Priority System and until all non-
federal, non-state match monies have been obligated or demand for such funds
has been met.
5. Subsidization from FFY-2017 Federal Appropriation
EPA is expected to mandate that a minimum 20% of the FFY-2017 Cap grant be
provided as additional subsidization to disadvantaged communities. Based on the
FFY-2017 grant amount of $8,607,000 the amount of subsidization will be
between $1,721,400. The DWSIRLF’s subsidization will be in the form of
“Principal Forgiveness” (PF) to individual public water supplies that are
considered disadvantaged communities and which received reimbursements with
Federal Cap grant funds during the construction of the project. If the amount of
PF which a project is eligible exceeds the amount of Federal Cap grant funds
which it received, the amount of PF extended will be limited to the amount of
Federal Cap grant funds used for reimbursement.
Subsidization may be used over a two year period. Subsidization remaining from
a previous year may be awarded to loans which are eligible for PF over a two year
time period. Subsidization for FFY-2016 may be awarded to projects eligible for
PF in FFY-2017 and FFY-2018.
Disadvantaged Community Program
During FFY-2017, the following PF methodology will be used since it is
anticipated that the FFY-2017 federal appropriation will continue to require
the state to provide additional subsidy for disadvantaged communities.
The amount of PF for which a potential “Loan Recipient” (LR) may be
eligible will be determined by calculating the percentage of the “Median
Household Income” (MHI) of the potential LR versus the MHI of the State of
Mississippi as a whole.
90% < LR MHI < 100%
- 15% Principal Forgiveness
80% < LR MHI < 90%
- 25% Principal Forgiveness
70% < LR MHI < 80%
- 35% Principal Forgiveness
LR MHI < 70%
- 45% Principal Forgiveness
This PF will be extended to projects until all mandated subsidy funds are
obligated. The amount of PF given will be assigned at loan award and will
not change after the project goes to the bid phase. Additionally, due to the
limited amount of PF funds, the maximum amount of PF funds a loan
recipient may receive for a project will be set at $500,000. Once subsidy
funds are depleted, only standard loans will be made with DWSIRLF funds.
MHI’s to be used for calculating PF will be as determined by the MSDH
program “Household Income Estimates within Water System Boundaries for
each Public Water Supply within the State of Mississippi”. If the “Household
Income Estimates within Water System Boundaries for each Public Water
Supply within the State of Mississippi” program is not available “The
Sourcebook of Zip Code Demographics”, Twenty-third Edition, will be used,
and where an affected community is included in more than one zip code area,
an average will be used for the community’s MHI.
In the event that a LR declines their loan that includes PF, the released PF
may be reallocated to other projects for the present fiscal year that are eligible
for PF or the PF may be carried over to projects for the next fiscal year.
If returned PF funds are reallocated to projects awarded during the existing
fiscal year. The reallocation of PF will be given first to projects which did not
receive their full allowable amount based on the above table up to the
maximum allowed limit.
If all projects have received their full allowable amount, returned PF funds
may be reallocated to projects awarded PF during the existing fiscal year
based on a percentage of the individual LR’s initial loan amount to the total
loan amount of loans awarded PF during the fiscal year.
In all cases, the amount of PF which is awarded to a project may not exceed
the amount of Federal Cap grant funds which the project was reimbursed
during the construction of the project.
B. Priority System Categories
Projects in Category I are funded each year to the extent funds are available. Projects
in Categories II through XI are ranked in priority order; that is, all Category II
projects are ranked higher than Category III projects, etc. Ranking is established in
like manner through all remaining categories. Adjustments are made as necessary to
comply with small community set-aside provisions of the Federal SDWA and as
established by the Board [Section 1542(a)(2) of SDWA]. As stated previously, the
order of Categories II - XI is intended to give highest priority to those projects that
address the most serious risks to human health. Projects within each category will be
ranked as described in Section C.
1. Category I - Segmented Projects
This category of projects includes any remaining segments of projects that
previously received funding for an integral portion of that project, and are
necessary for the entire project to be functional. Projects will be funded under
this category in order of their regular priority ranking provided they meet the
deadlines established in Section D.
In order to maintain continuity, the Board intends to make some amount of funds
available for each ongoing-segmented project. Preference in the amount of funds
to be provided will be given to the projects that received the earliest loan award
for their initial segment.
2. Category II - Previous Year Certified Projects
Priority for this category will be given to the previous year Category II projects to
the maximum extent practicable. This category of projects includes projects that:
(1) were listed immediately below the funding line on the previous year’s Priority
List within an amount of approximately 25% of that year’s total available funds;
(2) met all Priority System deadlines in the previous fiscal year; and (3) were not
funded due to lack of DWSIRLF funds or did not receive an assurance of CDBG,
ARC, RUS, or other match funding in the previous fiscal year. Within this
category, projects will be ranked according to the current Priority Ranking
Criteria.
3. Category III - Primary Drinking Water Standards
This category includes projects to facilitate compliance with Primary Drinking
Water Standards. To qualify for this category, projects must correct deficiencies
resulting in non-compliance with the primary drinking water standards.
Depending on the nature of the project, additional treatment requirements may be
necessary as part of the proposed project.
4. Category IV - One Well
This category includes projects to provide additional water supply to systems that
have neither a backup well or an MSDH-approved emergency tie-in to another
system to ensure safe drinking water; thereby protecting the health of the existing
population. Depending on the nature of the project, additional treatment
requirements may be necessary as part of the proposed project.
5. Category V – Pressure Deficiencies
This category includes projects to correct documented deficiencies that result in
existing systems routinely failing to maintain minimum acceptable dynamic
pressure. Experience has shown that failure of water systems to maintain
minimum acceptable dynamic pressure is the major cause of system
contamination in Mississippi. System contamination that results from inadequate
water system pressure is considered by the MSDH to be one of the most serious
drinking water-related threats to public health in Mississippi
6. Category VI - Source Water Protection Projects
This category includes projects to manage potential sources of
contaminants/pollutants and/or prevent contaminants/pollutants from reaching
sources of drinking water. To be eligible for loan participation, potential
contaminants/pollutants and source water protection areas must have been
identified in the public water systems Source Water Assessment Plan Report
(SWAPR) prepared by the Mississippi Department of Environmental Quality’s
Groundwater Planning Branch (DEQ-GPB). If the public water system has not
received its SWAPR from the DEQ-GPB yet, or has documentation that may
change its SWAP, it shall provide in the facilities plan suitable documentation of
potential sources of contaminants/pollutants that is acceptable to the DEQ-GPB
before the project will be deemed eligible.
The projects will be ranked: first in order of the highest source water
classification that would be negatively impacted by source water contaminants;
secondly, within each classification in order of the public water systems
susceptibility assessment ranking as determined by the DEQ-GPB; and thirdly,
within each susceptibility assessment ranking in order of the highest number of
connections served by the public water system. Source water classifications will
be ranked in the following order: surface water sources; shallow (generally ≤ 300’
in depth) unconfined water wells; shallow (generally ≤ 300’ in depth) confined
water wells; and deep confined water wells.
7. Category VII - System Capacity Expansion To Serve Existing Unserved
Residences/Businesses
This category includes projects to either expand existing system capacity or
construct a new drinking water system to ensure safe drinking water (source,
treatment and/or distribution) to serve existing residences/businesses in currently
unserved areas.
8. Category VIII - Back-up Water Supply Sources Projects
This category includes projects to provide additional supply to systems with
insufficient back-up water supply sources to ensure safe drinking water, and
thereby protect the health of the existing population. As a minimum, a system
using ground water should be able to lose any one of the wells supplying the
system and still maintain minimum acceptable dynamic pressure throughout the
entire system.
9. Category IX – Existing Facilities Upgrades (Meeting Primary Standards)
This category includes projects to rehabilitate, replace, protect or upgrade
deteriorated, worn, aged or obsolete equipment, facilities, etc., to assure
continued, dependable operation of water systems where such systems are already
meeting Primary Drinking Water Standards. Depending on the nature of the
project, additional treatment requirements may be necessary as part of the
proposed project.
10. Category X - Fluoride Addition
This category is for projects that either rehabilitate existing fluoride treatment
facilities at well or treatment plant sites, or add new facilities to existing well or
treatment plants.
11. Category XI - Secondary Drinking Water Standards Projects
This category includes projects to provide treatment that brings systems into
compliance with Secondary Drinking Water Regulations. Depending on the
nature of the project, additional treatment requirements may be necessary as part
of the proposed project.
12. Category XII – Consolidation Projects
This category includes projects to consolidate separate systems into a single
system for purposes other than those related to Categories II through IX.
Consolidation will also be considered in establishing priority ranking within all
categories, as described in the Priority Ranking Criteria in Section C.
13. Category XIII – Other
This category includes projects that do not meet the criteria of any other listed
category, and have been determined loan eligible in accordance with the
DWSIRLF loan program regulations.
C. Priority Ranking Criteria
The criteria for ranking projects within each category is intended to give priority to
projects that: (1) benefit the most people per dollar expended; (2) assist systems most
in need on a per household affordability basis as required by the SDWA (3) use
consolidation with other systems to correct existing deficiencies and improve
management; (4) take into consideration the system’s current capacity; (5) encourage
participation in short-term and long-term technical assistance programs; and (6)
encourage participation in the Drinking Water Needs Survey. These considerations
are addressed by the Priority Ranking Criteria in the following manner:
1. Benefit/Cost
Benefit/Cost points assigned to each project will be determined using the
following formula:
Benefit/Cost Points
=
Number of benefiting connections
Total eligible cost of improvements (in $1.0
millions)
The number of benefiting connections must be included in the facilities plan
submitted by the applicant; be defined as the sum of individual connections
currently experiencing deficiencies that will be corrected by the
improvement; and include only existing residences, businesses, and public
buildings. Applicants must furnish information (including hydraulic analysis, if
necessary) to support their estimate of the number of benefiting connections. The
total eligible cost is in millions of dollars (i.e., $800,000 = $0.8 M).
2. Affordability Factor
An affordability factor will be assigned to each project to reflect the relative needs
of applicants on a per household basis. The Benefit/Cost points calculated in
Section C.1. will be adjusted using the affordability factor in the following
formula:
Adjusted Benefit/Cost Points = (Affordability Factor) x (Benefit/Cost Points)
The affordability factor used in the calculation is defined as the ratio of the
“Median Household Income” (MHI) for the State of Mississippi to the MHI for
the affected community. The affordability factor used in the calculation will be
no less than 1.0 and no greater than 1.5.
The MHI to be used in the calculations will be those as determined by the MSDH
program “Household Income Estimates within Water System Boundaries for each
Public Water Supply within the State of Mississippi”. If the “Household Income
Estimates within Water System Boundaries for each Public Water Supply within
the State of Mississippi” program is not available; the MHI to be used in the
calculations will be those displayed in the publication “The Sourcebook of Zip
Code Demographics”, Twenty-third Edition or from the publisher’s website at
http://www.esribis.com/reports/ziplookup.html. Where the affected community
is included in more than one zip code area, an average will be used for the
community’s median household income
3. Consolidation
Any project that includes consolidation (ownership and management) of separate
existing systems into a single system will receive consolidation points equal to 0.5
times the Adjusted Benefit/Cost points assigned to the project. The purpose of
assigning consolidation points is to promote reliability, efficiency and economy of
scale that can be achieved with larger water systems while discouraging the
proliferation of numerous separate small systems with their inherent inefficiencies
and limitations. Projects, in any priority category, that do not include
consolidation will receive zero consolidation points in the final calculation of total
priority points.
Consolidation Points = 0.5 x (Adjusted Benefit/Cost Points)
4. System Capacity
Any project that includes scope of work to address critical design capacity issues
(systems that are currently overloaded or within two (2) years of reaching their
current design capacity, as determined by MSDH) will receive additional priority
points equal to 25% of the Adjusted Benefit/Cost points assigned to the project.
Documentation of the system capacity analysis and recommendations to address
the design capacity issues must be addressed in the facilities plan to be eligible for
these additional priority points.
System Capacity Points = 0.25 x (Adjusted Benefit/Cost Points)
5. Participation in Short-Term & Long-Term Assistance Programs
The MSDH, with the Board’s approval, has contracted with Community
Resources Group (CRG) to provide both short-term and long-term assistance to
designated water systems in the state based on their scores on the latest Capacity
Assessment Form (CAF). This assistance is provided at no cost to the water
systems.
Participation by the water systems in these assistance programs is voluntary;
however, any water system that has participated in either of these assistance
programs within the past two years will be eligible to receive additional priority
points equal to 5% of their Adjusted Benefit/Cost Points. Water systems that
have implemented all of the recommendations made by CRG will receive
additional priority points equal to 5% of their Adjusted Benefit/Cost Points for a
total of 10%. Documentation of participation in either of these assistance
programs and implementation of the recommendations made by CRG must be
included in the facilities plan before additional priority points will be granted.
Assistance Points = ** x (Adjusted Benefit/Cost Points)
** 5% if the water system participates in the assistance, or 10% if the
water system participates in the assistance and implements all
recommendations
6. Participation in the EPA or MSDH Drinking Water Needs Survey
Any water system that participated in the most recent MSDH Public Water
Supply Improvements Needs Survey or the EPA Drinking Water Needs Survey
by satisfactorily completing and returning this form to MSDH will be eligible to
receive additional priority points equal to 10% of their Adjusted Benefit/Cost
Points.
Needs Survey Points = 0.10 x (Adjusted Benefit/Cost Points)
7. Ranking Within Each Category
Within each category, projects will be ranked in order based on the total points
assigned the project using the following formula:
Total Priority Points = Adjusted Benefit/Cost Points + Consolidation Points +
System Capacity Points + Assistance Program Points + Needs Survey Points
Projects receiving the most priority points will be given the highest ranking on the
Priority List. In case of a tie in the number of priority points, projects with the
lowest median household income will receive the highest ranking.
8. Small Community Set-Aside
Following completion of the ranking process, the Priority List will be reviewed to
determine if at least 15% of available funding for projects above the funding line
is for public water systems which regularly serve fewer than 5,000 people, which
the Board has defined as a small community for the purposes of this set-aside. If
this is not the case, the Priority List will be adjusted by exchanging the lowest
ranking projects above the funding line that serve 5,000 or more with the highest
ranking projects below the funding line that serve fewer than 5,000, until the 15%
requirement is satisfied.
D. Priority System Deadlines
1. By October 1, 2016, a complete DWSIRLF facilities plan, prepared in accordance
with the DWSIRLF loan program regulations, must be submitted to MSDH.
A complete DWSIRLF facilities plan includes: all Intergovernmental Review
(IGR) agency comments; proof of publication of advertisement for public hearing;
a transcript of the public hearing comments; copies of any comments received
from the public; and a summary of how each comment was addressed. The loan
applicant should provide a copy of the facilities plan to USDA - Rural Utilities
Service (RUS); if the loan applicant has an existing debt with RUS, their approval
to incur the additional debt must be obtained and provided as part of the plan.
Any significant changes made to the facilities plan (i.e., changes in the chosen
alternative location of the facility, cost increases that substantially affect the
financial capability of the loan recipient) after this date will be considered a first
submittal of the facilities plan. The loan applicant will then be considered to be in
violation of the Priority System deadline and the project will be placed on the
planning portion of the priority list. If the change is made after adoption of the
IUP, funds reserved for this project may be released and made available to other
projects.
This deadline also applies to all projects competing for released funds during
FFY-2017 and to be able to qualify for the Previous Year Certified Projects
Category in the FFY-2017 IUP.
2. By May 1, 2017, a completed DWSIRLF loan application and all associated
documents as described in the DWSIRLF regulations must be submitted to the
Department. Prior to preparing these documents, the potential applicant and/or its
registered engineer must request and receive a DWSIRLF application and
guidance. It is recommended that they request a pre-application conference with
DWSIRLF staff as early in the application process as practical. This deadline also
applies to all projects competing for released funds during FFY-2017 and to be
able to qualify for the Previous Year Certified Projects Category in the FFY-2017
IUP.
3. By August 1, 2017, all approvable documents and responses to comments
necessary for loan award must be submitted to the Department for its review and
approval. This deadline also applies to all projects competing for released funds
during FFY-2017 and to be able to qualify for the Previous Year Certified
Projects Category in the FFY-2017 IUP.
VII.
FFY-2017 Priority List
FINAL
Fiscal Year - 2017 Mississippi Drinking Water Systems Improvements
Revolving Loan Fund Program Priority List
Category III: Primary Drinking Water Standards Projects
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
Jackson, City of
Treatment & Dist. Improvements
39201 37222
174382
$0
$0 $13,000,000
$13,000,000
Tunica County Utility District
Repair & Paint Elevated Storage Tanks
38676
10000
$0
$0
$702,000
$13,702,000
Yazoo City, City of
New Well/Storage Tank/Distrib. Lines and AMR
39194
16400
$0
$0
$3,854,669
$17,556,669
Category IV: One Well Projects
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
Homestead Water Association
Consolidate System/Rehab 2 Tanks/Booster
39648
$0
$0
$595,100
$18,151,769
Category V: Pressure Deficiencies Projects
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
Horn Lake, City of
Water Sys. Improvements/Install Larger Water
38637
16123
$0
$0
$719,682
$18,871,451
Troy Water Association
Const. of Approx. 29,300 6" & Sm. LF Distrib.
38863
$0
$0
$610,300
$19,481,751
Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
Bear Creek Water Assn.
2 New Wells
39046
40000
$0
$0
$4,100,000
$23,581,751
Jackson County Utility Authority
Distribution System Improvements
39567
43680
$0
$0
$6,250,000
$29,831,751
Lily Rose Water Assn
Install Master Meters/Well/Rehab Tank/Ext. 4"
39474
$0
$0
$891,658
$30,723,409
S E Greene Water Authority
Rehab Treatment Facility/Water Line Extension
39452
$0
$0
$670,519
$31,393,928
Category VIII: Back-up Water Supply Sources Projects
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
McComb, City of
1000 GPM Well/Generator/Fence/12" Main
39648
12790
$0
$0
$1,236,000
$32,629,928
Harland Creek Water Assn
New Storage Tank/Water Mains/SCADA System
39095
$0
$0
$1,259,600
$33,889,528
Burnsville, Town of
Surface Water Supply Facilities/meters/Booster St
38833
$0
$0
$2,871,179
$36,760,707
Wednesday, November 30, 2016
Page 1 of 2
Category IX: Existing Facilities Upgrade (Meeting Primary Standards)
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
Pearl River Central Water Assn.
Install/reconnect 32,800 LF PVC Water Main
39426
12800
$0
$0
$1,464,705
$38,225,412
Picayune, City of
Installation of New Water Mains
39466
12000
$0
$0
$3,500,000
$41,725,412
New Zion Utilities, Inc.
Install Approx. 18,700 LF PVC Main/Well Prot.
39577
$0
$0
$554,475
$42,279,887
-------------------------------------------------------------------------- Funding Line $43,433,167 --------------------------------------------------------------------------------- ---------
Wiggins, City of
1000 GPM Well/3,000 ft.8" Main/Seal Well
39577
$0
$0
$1,610,668
$43,890,555
Multi-Mart Waterworks Assn.
Replace Approx. 16,500 LF Water Main with
39451
$0
$0
$862,845
$44,753,400
Sumner, Town of
Rehab Original Distribution System
38957
$0
$0
$719,274
$45,472,674
Meridian, City of
Filter Underdrain & Media Replacement
39301
40000
$0
$0
$4,620,000
$50,092,674
Category XIII: Other
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
Central Yazoo Water Association
Upgrade Meters to Auto Read Meters
39194
$0
$0
$1,121,884
$51,214,558
*
The “Funding Line” indicates the funds which are anticipated to be available for loans in FFY-2017 based on the funds authorized and provided by the 2017
Legislature. The funding available in FFY-2017 should equal $43,433,167.
**
Currently, the requirements of additional subsidization are unknown. Once the final federal appropriation with related requirements is made, additional
modifications will be made to the priority system and ranking to integrate the federal requirements as necessary.
Funding Sources
PF – Principal Forgiveness – Method of Subsidization the state has elected to use.
CPF – Cumulative Principal Forgiveness
CGI – Cumulative Green Infrastructure
Green Infrastructure Project Codes
E – Energy Efficiency, W – Water Efficiency, G – Green Infrastructure, EI – Environmentally Innovative
Green projects are projects that provide benefits in the form of increased energy efficiency, increased water efficiency, added green infrastructure,
and/or are environmentally innovative. Projects currently listed as Green Infrastructure are based on information supplied in submitted facility plans.
This determination of Green Infrastructure will be based on guidelines supplied by the Environmental Protection Agency.
Wednesday, November 30, 2016
Page 2 of 2
FINAL
Fiscal Year - 2018 and After Planning List
Mississippi Drinking Water Systems Improvements Revolving Loan Fund Program
(Projects included on the Planning List did not meet the September 30, 2016, deadline for submission of a complete facilities plan, or had multiple requests and asked to be placed
on the Planning List. These projects have been ranked on the Planning List based on information provided on the Request for Ranking Form. A determination of project eligibility
cannot be completed until the facilities plan has been submitted and reviewed.)
Category III: Primary Drinking Water Standards Projects
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
Tunica County Utility District
Repair & Paint Elevated Storage Tanks
38676
10000
$0
$0
$586,000
$586,000
Tunica County Utility District
Repair & Paint Elevated Storage Tanks
38676
10000
$0
$0
$586,000
$1,172,000
Fayette, City of
Paint/Rehab Storage. Tanks/New Well/Rehabs/2
39069
$0
$0
$2,515,600
$3,687,600
Pearlington Water & Sewer District New Back-up Water Well
39572
$0
$0
$1,515,000
$5,202,600
Friars Point, Town of
Distribution System Improvements
38631
$0
$0
$1,473,600
$6,676,200
Category IV: One Well Projects
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
Collins, City of
Distribution System Improvements
39428
$0
$0
$651,325
$7,327,525
Bay Springs, City of
Distribution System Improvements
39422
$0
$0
$839,344
$8,166,869
Category V: Pressure Deficiencies Projects
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
Aberdeen, City of
400 GPM Well/100,000 Gal. Elev. Tank/Rehab
39730
$370,487
$1,481,949
$9,648,818
Cedar Grove-Harmony Water Assn
Water Distribution Improvements
39429
$0
$0
$1,008,000
$10,656,818
Category VII: System Capacity Expansion to Serve Existing Unserved Residences/Businesses
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
Batesville, City of
Installation of Water lines
38606 31582
$37,500
$125,000
$10,781,818
Batesville, City of
Installation of Water Lines
38606 26319
$37,500
$150,000
$10,931,818
Batesville, City of
Rehab/Replacement of Existing Facilities
38606 14356
$68,750
$275,000
$11,206,818
Batesville, City of
Rehab Existing Facilities
38606 11279
$87,500
$350,000
$11,556,818
Batesville, City of
500,000 Gallon Elevated Tank
38606
$187,500
$750,000
$12,306,818
Thursday, January 12, 2017
Page 1 of 2
Short Coleman Park Water Assn.
Repaint 2 Elevated Tanks/250,000/500,000 GAL
38852
$0
$0
$561,915
$12,868,733
McLain, Town of
New 8" Val on Existing Mains/Meters/1000 Ft.
39456
$0
$0
$142,111
$13,010,844
Southeast Rankin Water Assn., Inc.
New Water Well/Water Distribution System
39151
$0
$0
$1,154,000
$14,164,844
Category VIII: Back-up Water Supply Sources Projects
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
Batesville, City of
Rehab Existing Infrastructure
38606
$125,000
$500,000
$14,664,844
Batesville, City of
New 750 GPM Well
38606
$125,000
$500,000
$15,164,844
Madison, City of
Construction of 1Mil Gallon Storage Tank
39110
13986
$0
$0
$2,800,895
$17,965,739
Kokomo-Shiloh Water Assn.
New Well/Water Treatment Plant/Sys.
39643
$0
$0
$1,696,300
$19,662,039
Category IX: Existing Facilities Upgrade (Meeting Primary Standards)
Project
Project Description
Zip Priority Service Area Eligible
Green
Loan Amount Statewide Cum.
Code Points Population
PF
Project
Requested
$
Batesville, City of
Rehab Existing Facilities
38606
$102,500
$410,000
$20,072,039
Mount Olive, Town of
Replacement of Water Lines
39119
$80,962
$231,320
$20,303,359
Renshaw Water Assn., Inc.
New Generator
39194
$0
$0
$34,415
$20,337,774
Alcorn Co. Water Association
300,000 Gal Storage Tank/upgrade Facilities
38834
$190,965
$1,273,101
$21,610,875
Alcorn Co. Water Association
Renovate Elevated tanks/Replace Water Lines
38834
$130,938
$872,920
$22,483,795
Mendenhall, City of
New 500 GPM Well/250,000 Gal Tank/Treatment
39114
$138,750
$2,634,100
$25,117,895
*
The “Funding Line” indicates the funds which are anticipated to be available for loans in FFY-2017 based on the funds authorized and provided by the 2017 Legislature.
The funding available in FFY-2017 should equal $43,433,167.
**Currently, the requirements of additional subsidization are unknown. Once it has been determined by the final federal appropriation, additional modifications will be made to
the priority system and ranking to integrate the federal requirements as necessary.
Funding Sources
PF – Principal Forgiveness – Method of Subsidization the state has elected to use.
DW – Drinking Water System Improvement Revolving Loan Fund – includes repayments, interest and FFY-2016 Capitalization Grants.
Green Infrastructure Project Codes
E – Energy Efficiency,
W – Water Efficiency,
G – Green Infrastructure,
EI – Environmentally Innovative
Green projects are projects that provide benefits in the form of increased energy efficiency, increased water efficiency, added green infrastructure, and/or are environmentally innovative.
Projects currently listed as Green Infrastructure are based on information supplied in submitted facility plans. This determination of Green Infrastructure will be based on guidelines
supplied by the Environmental Protection Agency.
Thursday, January 12, 2017
Page 2 of 3
VIII. Expected Public Health Outcomes & Performance Measures
The objective of this program is to disperse all available loan and grant funds in a timely
manner in order to achieve the public health protection benefits resulting from the projects
identified in the FFY-2017 IUP, and to ensure compliance with loan agreements, as
required by state and federal laws and regulations.
By implementing the FFY-2017 IUP and funding projects shown on the FFY-2017
Priority List (Section VII), the Board will have the means to plan for and fund projects
that will address the most serious public health risks facing the public water supply
systems in the state. Funding of the system projects will be determined by the amount of
funding to be received for FFY-2017.
The success of the DWSIRLF Program will be defined by the ability of the MSDH to
successfully meet commitments in the FFY-2017 DWSRF Work Plan.
Additionally, the majority of the projects as proposed should have minimal impact on the
environment due to the nature of their design. Where necessary, appropriate
environmental reviews will occur and proper permitting through the Mississippi
Department of Environmental Quality will be required to ensure minimal impact on the
environment.
(Blank)
Appendices
Appendix A - Part 1A
FFY-2017 Beginning of the Year Anticipated Funds Report for the Mississippi Drinking
Water Improvements Revolving Loan Fund (DWSIRLF) Program
October 1, 2016
FFY-2017 National Title I DWSRF Appropriation (Estimate) (Using FFY-2016 Allotment)
$855,381,000
* Mississippi's Allotment [section 1452(m)] (Estimate) (Using FFY-2016 Amount)
$8,607,000
FFY-2017 State Match Required (20% of Mississippi's Allotment) (Estimated) (Using FFY-2016
Amount)
+
$1,721,400
Total FFY-2017 Federal Allotment and Required State match (Estimate):
$10,328,400
FFY-2017 Funding (Federal and State)
**2016 Legislated State match (Direct Appropriation from Legislature-$1,220,000 Reduced to
$1,200,166)
+
$1,200,166
**2015 Emergency Fund remainder (The reminder of the 2016 Emergency Fund transfer not used for
State match in FFY2016 = $94,340.20)
+
$94,340
**2016-2017 Emergency Fund transfer (Amount needed to supplement the State Match for the
FFY2016 Cap Grant $426,893.80)
+
$426,894
+
FFY-2016 Cap Grant (State Match = $1,721,400)
+
$8,607,000
Total 2016 Federal and State Funds available in FFY-2017 for Loan Obligations & Set-asides:
$10,328,400
Note: No FFY-2017 Cap Grant Funds or Set-asides are shown in this report in order to make
this projection more realistic. State match funds for Cap Grant funds normally will not be
available until QTR4 of FFY-2017; the first portion of the FFY-2017 Cap Grant funds will not
usually be received until QTR1 of FFY-2018.
FFY-2016 Cap Grant Set-Asides
DWSRF Administrative Expenses [section 1452(g)(2) - 4%] (Used reserved amount from 2008)
+
$325,840
Small Systems Technical Assistance [section 1452(g)(2) - 2%]
+
$172,140
Local Assistance and Other State Program [section 1452(g)(2) - 15%] (taking ~8.2%)
+
$750,000
State Program Management [section 1452(g)(2) -10%]
+
$860,700
Total FFY-2016 Cap Grant Set-Asides:
$2,108,680
Total Federal and State Funds available in FFY-2017:
+
$10,328,400
Less FFY-2016 Set-asides:
-
($2,108,680)
Total Federal & State Funds available for Loan Obligation in FFY-2017:
$8,219,720
FFY-2017 DWSRF Funds (Anticipated)
Total Federal & State Funds available for Loan Obligation in FFY-2017
+
$8,219,720
Unobligated Funds Carried Over from FFY-2016
+
$23,477,852
Loan Repayments To Be Deposited (Anticipated)
10/1/16 - 9/30/17
+
$12,011,246
Interest on Fund To Be Deposited (Anticipated)
10/1/16 - 9/30/17
+
$724,349
FFY-2017 Loan Increase Reserve ($1.0m)
-
($1,000,000)
Total Funds Available for Loan Awards in FFY-2017 (Anticipated)
$43,433,167
Appendix A - Part 2A
FFY-2016 End-of Year Funds Report
Mississippi Drinking Water Improvements Revolving Loan Fund (DWSIRLF) Program
October 1, 2016
FFY-2016 National Title I DWSRF Appropriation (Actual Amount)
$855,381,000
* Mississippi's Allotment [section 1452(m)] (FFY-2016 Grant – Actual Amount)
$8,607,000
FFY-2016 State Match Required (20% of Mississippi's Allotment) (Actual)
+
$1,721,400
Total FFY-2015 Federal Allotment and Required State Match (Actual):
$10,328,400
2016 Funding (Federal and State) (FFY-2015 Cap Grant Funds were used in 2016)
**2015 Legislated State Match (Direct Appropriation from Legislature-$1,200,000 reduced to
$1,176,820.00)
+
$1,176,820
**2014 Emergency Fund remaining (The remainder of the 2014 Emergency Fund transfer not used for State
Match in FFY2014)
+
$2,709
**2015 Emergency Funds transfer (Amount originally estimated to be needed to supplement the State match,
transferred from the Emergency Fund for the FFY2015 Cap Grant)
+
$734,611
**2015 Emergency Funds transfer (Only $1,819,800 is needed as match for the revised FFY2015 EPA Cap Grant
($9,099,000). The available State match is reduced to show only the amount needed for the FFY2015 State match;
$94,340 will remain as future State match funds.)
+
($94,340)
FFY-2015 Cap Grant (State Match = $1,819,800)
(EPA reduced the amount of the FFY-2015 Federal Cap Grant $9,159,000 to $9,099,000 at award to comply with Federal
debt reduction requirements so a State match of only $1,819,800 was needed.)
+
$9,099,000
Total FFY-2015 Federal and State Funds available in FFY-2016 for Loan Obligations & Set-asides:
$10,918,800
FFY-2015 Cap Grant Set-Asides
DWSRF Administrative Expenses [section 1452(g)(2) - 4%] (Used reserved amount from 2003)
+
$320,164
Small Systems Technical Assistance [section 1452(g)(2) - 2%]
+
$181,980
Local Assistance and Other State Program [section 1452(g)(2) - 15%] (taking ~5.2%)
+
$750,000
State Program Management [section 1452(g)(2) -10%]
+
$909,900
Total FFY-2015 Cap Grant Set-Asides:
$2,162,044
Total Federal & State Funds Available in FFY-2016 for Loan Obligation & Set-asides
$10,918,800
Less FFY-2015 Set-asides
-
($2,162,044)
Total Federal & State Funds Available in FFY-2016 for Loan Obligation
$8,756,756
FFY-2016 DWSRF Funds (Actual)
Federal & State Funds available in FFY-2016 for Loan Obligation
+
$8,756,756
Unobligated Funds Carried Over from FFY-2015
+
$21,573,730
Loan Repayments Deposited to the Fund (Actual)
10/1/15 - 9//30/16
+
$13,103,177
Interest Deposited to the Fund (Actual)
10/1/15 - 9//30/16
+
$790,199
FFY-2016 Loan Decreases (Actual)
10/1/15 - 9//30/16
+
$3,634,673
FFY-2016 Loan Increases (Actual)
10/1/15 - 9//30/16
-
($1,725,513)
Funds Available for Loan Awards in FFY-2016
$49,584,048
Loan Awards made during FFY-2016 (14 Initial Loans for $26,106,196)
($26,106,196)
FFY-2016 Carryover Funds to FFY-2017
$23,477,852
Appendix A - Reference Notes:
Part 1A - FFY-2017 Beginning of the Year Anticipated Funds Report for the Mississippi
Drinking Water Improvements Revolving Loan Fund (DWSIRLF) Program
&
Part 2A - FFY-2016 End-of Year Funds Report for the Mississippi Drinking Water
Improvements Revolving Loan Fund (DWSIRLF) Program
* Mississippi will apply for the entire FFY-2017 Cap Grant if State match funds are provided by
the Legislature. Cap Grant funds must be matched within 24 months of award.
* Mississippi applied for the entire FFY-2016 Cap Grant (All Cap Grant Funds were awarded).
During the 2015 Regular Legislative Session, the State Legislature (House Bill No. 1555)
authorized $1,200,000 in direct funding for the DWSRF program; however, in July 2015 due to a
shortfall in State funds the authorized $1,200,000 was reduced by $99,520.00 to $1,100,479.80.
In January 2016, due to a continuing shortfall in State revenue the Governor mandated an
additional $18,000 be reduced from the State match funds authorized by the 2015 Legislature, this
reduced the authorized State match to $1,082,479.80. In March 2016, $35,509.77 was returned to
the State match funds; in April 2016 an additional $5,180.00 was removed from the State match
funds; then in May 2016 $64,010.43 was returned to the State match funds. With all the removals
and returns the final amount provided by the 2015 State Legislature was $1,176,820.00.
In September 2015, EPA reduced the amount of the FFY-2015 Federal Cap Grant to $9,099,000
at the award of the FFY-2015 Cap Grant to comply with Federal debt reduction requirements;
therefore, a 2015 State match of only $1,819,800 was needed for the FFY-2015 Cap Grant. The
difference between the required 2015 State Match and the available 2015 State Match is $642,980.
To provide the remainder of the required 2015 State Match for the FFY-2015 Cap Grant, the
following amounts were available or transferred in 2015 from the Drinking Water Systems
Emergency Loan (DWSELF) Fund;
ď‚· $2,709 remaining from a DWSELF transfer for the FFY-2014 Cap Grant match.
ď‚· $728,611.20 transferred from the DWSELF Fund in August 2015 for the original FFY-2015
Cap Grant amount match.
ď‚· $6,000 transferred from the DWSELF Fund in February 2016 after the second reduction in
the FFY-2015 Cap Grant match by the State.
The transfers from the Drinking Water Systems Emergency Loan Fund (DWSELF) in 2015
provided an amount of $737,320.20; only $642,980.00 is required, therefore, an amount of
$94,340.20 remains to be used as match for the FFY-2016 Capitalization Grant.
During the 2016 Regular Legislative Session, the State Legislature (House Bill No. 1651
Amended) authorized $1,220,000 in direct funding for the DWSRF program. The FFY-2016 EPA
Cap Grant amount is $8,607,000; the required State match amount is $1,721,400. In September
2016 due to a continuing shortfall in State revenue the Governor mandated that the funds
authorized by the 2016 Legislature be reduced by $19,834 to $1,200,166. With the $94,340.20
remaining from the match funds for the FFY-2015 EPA Cap Grant, an additional $426,893.80 will
be needed as State match for the FFY-2016 Capitalization Grant; the Board will be requested to
authorize the use of additional funds from DWSELF as the State match.
It is anticipated that the State Legislature will continue to provide a direct appropriation for the
State’s 20% match portion of the FFY-2017 EPA Capitalization Grant. If this happens, the match
amount would be $1,721,400 for a grant amount of $8,607,000.
Appendix B
Part I
Projected Schedule of Outlays
for
Standard Capitalization Grant Set-Asides
FFY-2016 Set-asides
Federal
1Q FFY-17
2Q FFY-17
3Q FFY-17
4Q FFY-17
Total
Administrative
$81,460
$81,460
$81,460
$81,460
$325,840
Small Sys. Tech Assist.
$43,035
$43,035
$43,035
$43,035
$172,140
State Program Mgmt.
$215,175
$215,175
$215,175
$215,175
$860,700
Local Asst. & Other St.
Programs
$187,500
$187,500
$187,500
$187,500
$750,000
Total Set-asides
$527,170
$527,170
$527,170
$527,170
$2,108,680
FFY-2017 Set-asides
Federal
1Q FFY-18
2Q FFY-18
3Q FFY-18
4Q FFY-18
Total
Administrative
$70,625
$70,625
$70,625
$70,625
$282,500
Small Sys. Tech Assist.
$43,035
$43,035
$43,035
$43,035
$172,140
State Program Mgmt.
$215,175
$215,175
$215,175
$215,175
$860,700
Local Asst. & Other St.
Programs
$187,500
$187,500
$187,500
$187,500
$750,000
Total Set-asides
$516,335
$516,335
$516,335
$516,335
$2,065,340
FFY-2017 Set-asides will not be available for use until FFY-2018; in FFY-2017 the program will operate using the FFY 2016 Set-asides.
Appendix C
Projected Payment (Federal Letter of Credit) Schedule
(Schedule of Increases to ACH Ceiling)
Payment
(LOC)
Number
Payment
(LOC)
Date
Payment
(LOC)
Amount
Cumulative
(LOC)
Amount
FFY-2016
FFY-2016
Cap Grant
No. 1 of 4
1st Quarter
FFY-2017
$2,151,750
$2,151,750
FFY-2016
Cap Grant
No. 2 of 4
2nd Quarter
FFY-2017
$2,151,750
$4,303,500
FFY-2016
Cap Grant
No. 3 of 4
3rd Quarter
FFY-2017
$2,151,750
$6,455,250
FFY-2016
Cap Grant
No. 4 of 4
4th Quarter
FFY-2017
$2,151,750
$8,607,000
FFY-2017
FFY-2017
Cap Grant
No. 1 of 4
1st Quarter
FFY-2018
$2,151,750
$2,151,750
FFY-2017
Cap Grant
No. 2 of 4
2nd Quarter
FFY-2018
$2,151,750
$4,303,500
FFY-2017
Cap Grant
No. 3 of 4
3rd Quarter
FFY-2018
$2,151,750
$6,455,250
FFY-2017
Cap Grant
No. 4 of 4
4th Quarter
FFY-2018
$2,151,750
$8,607,000
Appendix D
Projected Schedule of Drawdowns Against Federal Letter of Credit
(ACH Draw Schedule)
Outlay
Quarter
Federal Outlay
Amount
Cumulative Outlay
Amount
FFY-2017
1st Quarter
FFY-2016
$2,151,750
$2,151,750
2nd Quarter
FFY-2016
$2,151,750
$4,303,500
3rd Quarter
FFY-2016
$2,151,750
$6,455,250
4th Quarter
FFY-2016
$2,151,750
$8,607,000
FFY-2018
Outlay
Quarter
Federal Outlay
Amount
Cumulative Outlay
Amount
1st Quarter
FFY-2017
$2,151,750
$2,151,750
2nd Quarter
FFY-2017
$2,151,750
$4,303,500
3rd Quarter
FFY-2017
$2,151,750
$6,455,250
4th Quarter
FFY-2017
$2,151,750
$8,607,000
Appendix E
Mississippi Small Systems Technical Assistance Set-Aside Work plan
INTRODUCTION
The Mississippi State Department of Health (MSDH), Bureau of Public Water Supply
(Department), proposes to use the Small Systems Technical Assistance Set-Aside of the
DWSRF in an assistance and training program directed at improving the technical,
managerial, and financial capabilities of small community public water systems in the state.
The goal of this program is to assure that assistance is provided to all small community
public water systems that require such assistance to maintain adequate technical, financial,
and managerial capabilities necessary to comply with requirements of the SDWA.
SELECTION PROCESS
The current technical assistance contracts expire on June 30, 2017.
Prior to the expiration of the existing contracts an Invitation for Bids (IFB) for the technical
assistance contracts will be sent out to potential contractors. All proposals will be evaluated
by the Department and recommendations for aware will be presented to the Board (at a
regularly scheduled Board meeting); all contracts will be awarded.
The contracts for technical assistance currently reside as following:
Small Systems Technical Assistance (long-term and intermediate technical assistance) -
Mississippi State University Extension Service;
Board Management Training Monitoring and Coordination for Water System Officials -
Mississippi State University Extension Service;
Hands-On Operator Training - Mississippi Rural Water Association, Inc.;
PEER Review Program for Public Water Supplies - Mississippi Rural Water Association,
Inc.
PROGRAM ACTIVITIES
The technical assistance program consists of four major categories of activities that will be
accomplished through contracts with qualified organizations that are experienced in
providing the type of support required by each activity. These categories may be updated
and/or revised as a result of work plan reviews that will be conducted annually during the life
of the program. Amendments will be submitted whenever activities or budgets change and
when required to extend the term of the work plan.
Small Systems Technical Assistance:
Comprehensive and Intermediate technical assistance shall be provided to an equivalent
of twelve (12) small public water systems annually.
1. - Long-term technical assistance:
Comprehensive assistance must be provided to a minimum of six (6) small public
water systems for the contract period. The MSDH – Bureau of Public Water Supply
will provide the contractor a list of systems that are to receive this assistance. Within
30 days of the start date for that contract year, the contractor will identify, with the
help of MSDH, systems that will receive comprehensive technical assistance,
complete an initial assessment of the needs of each system and develop a work plan
for each water system. The contractor shall submit an assessment and work plan for
each system to MSDH for approval prior to initiating technical assistance. MSDH
shall use its latest report of Capacity Ratings of Public Water Systems, along with the
recommendations of MSDH staff and the contractor, to identify those public water
systems that are to receive this assistance.
Activity Objective - provide long-term on-site comprehensive technical assistance to resolve
problems identified by contractor. A minimum of six (6) systems will be chosen from a
prepared list.
Reporting/Evaluation - written progress reports using a format approved by MSDH will be
furnished monthly to MSDH and members of the Board by the contractor. The reports shall
identify progress made on the work plan developed for each system. The contractor shall meet
with the Board on a quarterly basis to update the Board on accomplishments under this
contract and answer any questions the Board might have regarding the implementation of this
contract.
2. Intermediate technical assistance:
This assistance is selective in nature and consists of one or more additional contact or
non-contact hours for public water systems previously receiving short-term assistance
or systems not requiring comprehensive long-term assistance. Selection of systems
will be based on the list supplied by MSDH for the remaining public water systems
from the initially prepared list.
Intermediate technical assistance projects will be counted toward the minimum
twelve (12) required comprehensive projects at a ratio of 2:1 (two intermediate
projects will be the equivalent of one comprehensive project).
Activity Objective - provide intermediate on-site technical assistance to selected systems
covering the subject(s) determined by the contractor to be most needed.
Reporting/Evaluation - written progress reports using a format approved by MSDH will be
furnished monthly to MSDH and members of the Board by the contractor. The reports shall
identify the assistance provided to each system. The contractor shall meet with the Board on a
quarterly basis to update the Board on accomplishments under this contract and answer any
questions the Board might have regarding the implementation of this contract.
Coordination and Monitoring of Board Management Training for Water System Officials:
Section 41-26-101 of the Mississippi Code of 1972, Annotated, states “Each member elected
or reelected after June 30, 1998, to serve on a governing board of any community public
water system, except systems operated by municipalities with a population greater than ten
thousand (10,000), shall attend a minimum of eight (8) hours of management training within
two (2) years following the election of that board member. If a board member has undergone
training and is reelected to the board, that board member shall not be required to attend
training. The management training shall be organized by the MSDH. The management
training shall include information on water system management and financing, rate setting
and structures, operations and maintenance, applicable laws and regulations, ethics, the
duties and responsibilities of the association and other organizations. The Department shall
develop and provide all training materials. To avoid board members having to interfere with
their jobs or employment, management training sessions may be divided into segments and,
to the greatest extent possible, shall be scheduled for evening sessions. The Department shall
conduct management training on a regional basis.” The contractor shall: serve as the
coordinator for MSDH in regards to all activities related to the implementation of the training
program in the state; randomly attend training sessions to ensure the established curriculum
is being followed and that the curriculum is relevant and effective; manage the Board
Member Training Curriculum Review Committee; continue to update the established
computerized database to accurately track the most current status of each board member
attending the program; and other related duties.
Activity Objective - manage those activities related to the effective training of the members of
the governing boards of small community public water systems.
Reporting/Evaluation - Randomly attend at least two sessions/contract year/training
organization unannounced and furnish both MSDH and the Board members a written report
within 7 days of attendance including the following information: review of presentation by
trainer(s); any needed remedial action; attendee comments; attendance roster; and other related
items. Written and oral quarterly reports shall be furnished to MSDH and the Board members
that include: attendee evaluation of the trainers and training material; contractor evaluation of
trainer(s); attendee comments; attendance rosters; needed remedial action; curriculum review
committee meetings; itemized costs of training organization(s). Monthly reports containing
the above information shall be submitted to MSDH along with the invoices for work
performed under the contract. MSDH, affected board members, and affected entities shall be
provided with periodic reports listing those board members who have not completed the board
member training and the time remaining for completion of the training.
Hands-On Operator Training:
The Contractor will provide practical, applied, “hands-on” training for public water system
operators in the State of Mississippi. MSDH defines hands-on operator training for the
purposes of this contract as training that provides functional instruction in the necessary
skills and knowledge to be able to better fulfill the job requirements of a drinking water
system operator. The hands-on training will include a comprehensive approach (lecture plus
physical, hands-on sessions with equipment) for all operators attending the training.
Trainings are to include equipment/props pertinent to the training topic(s) as a part of the
training discussion.
Activity Objectives - Provide a minimum of fourteen (14) hands-on operator training sessions
within the year.
Reporting/Evaluation - written quarterly reports using a format approved by MSDH on Hands-
On Operator Training. The reports shall include but are not limited to: a) details of sessions
conducted; b) number of attendees and their comments; c) related problems that occurred
during or as a result of a training session and any solution(s); d) an itemized list of the costs
incurred by the training organization; and e) other related items. The contractor shall meet
with the Board on a quarterly basis to update the Board on accomplishments under this
contract and answer any questions the Board might have regarding the implementation of this
contract.
Peer Review Assistance:
Through the use of trained volunteers, this assistance will be conducted on-site with the
systems either selected from a list provided to the contractor by MSDH or with prior MSDH
approval. A cooperative agreement between the contractor and the Mississippi Water and
Pollution Control Operators’ Association will help provide qualified volunteers to serve as
peer review team members. There will be a goal of a minimum of fourteen (14) Peer reviews
per contract year with a minimum of three (3) peer reviews per quarter. Each volunteer shall
be paid $75 per day for each actual peer review in which the volunteer participates. The
contractor will maintain a directory of trained volunteers.
Activity Objectives - provide short-term (less 8 contact hours) on-site technical assistance to
selected systems covering the subject(s) determined by the contractor to be most needed.
Reporting/Evaluation - copies of all completed peer review reports will be provided to both
MSDH and the Board within 30 days of completion of each peer review. Written progress
reports using a format approved by MSDH will be furnished monthly to MSDH and members
of the Board by the contractor. The name of the system undergoing the peer review shall be
removed and be identified by a code only known to the contractor. The report shall include: an
assessment of which type of capacity was the worst at the time of the visit; a listing of all
suggested remedial action; officials present shall be listed by title; an evaluation form
(previously approved by MSDH) rating the assistance provided that was completed by the
system; any conditions currently or potentially endangering public health; and any other related
items. The contractor shall meet with the Board on a quarterly basis to update the Board on
accomplishments under this contract and answer any questions the Board might have regarding
the implementation of this contract.
AGENCY RESPONSIBILITIES
The MSDH will conduct Small Systems Technical Assistance Set-aside activities through
Board approved contracts with providers who will be selected following procedures of the
State of Mississippi Personal Services Contract Procurement Regulations. Contracts of a
regulatory nature will be handled solely by MSDH. All providers will report to and be
responsible to the MSDH for all contract activities. No additional FTE requirement is
anticipated for state agencies to implement the provisions of this set-aside.
Appendix F
Mississippi State Program Management Set-aside Annual Work plan
Section 1452(g)(2) - Safe Drinking Water Act Amendments of 1996
PUBLIC WATER SYSTEM MANAGEMENT PROGRAM
BACKGROUND
This work plan describes how the Drinking Water State Revolving Fund (DWSRF) State
Program Management set-aside funds will be expended to support the Public Water Systems
Supervision (PWSS) Program.
After review of the Draft FFY-2017 Intended Use Plan (IUP) by the Local Governments &
Rural Water Systems Improvements Board (Board), the Board will authorize the publication
of a legal notice in The Clarion-Ledger for the IUP. The notice will request the public to
provide comments on the Draft FFY-2017 Intended Use Plan (IUP). The IUP reserves 10%
of the state’s Drinking Water State Revolving Fund (DWSRF) capitalization grant for the
State Program Management activities to support the MSDH PWSS Program as allowed under
Section 1452(g)(2) of the SDWA Amendments of 1996.
After a public notice period of at least twenty-five (25) days, an oral proceeding will be held
to receive and consider comments from the public on the Draft IUP. After the resolution of
any comments from the public, the Final FFY-2017 IUP will be presented to the Board for
adoption at their next scheduled Board meeting. After adoption by the Board, a second filing
with the Secretary of State’s Office occurs. The Final FFY-2017 IUP will be effective thirty
(30) days from the date of the second filing with the Secretary of State’s Office.
FUNDING AMOUNT (Standard Capitalization Grant)
The state reserves 10% ($860,700) of the FFY-2017 DWSRF capitalization grant as a set-
aside for State Program Management activities of the PWSS Program. The reserved amount
will offset the salary, fringe and indirect cost expenses of 8.82 positions of the PWSS
Program.
Cost Breakdown:
Administrative/Staffing
$541,420
Fringe Benefits
$184,083
Travel
$0.00
Supplies
$253
Contractual
$0.00
Indirect Costs
$134,944
Total Funding Amount
$860,700
NUMBER OF FTE’s PROJECTED FOR IMPLEMENTING THIS SET-ASIDE
The state projects thirty-eight (38) FTEs will be required to implement the FFY-2017/2018
PWSS Program. A total of 8.82 FTEs will be funded by this set-aside. An estimated
$725,503 will be reserved from the FFY-2017 DWSRF Capitalization Grant for salaries and
fringe benefits for State Program Management activities.
This amount will fund salary and fringe benefits for the following positions:
Position
Quantity
(FTE)
Engineering Admin.
Supervisor
1.0
Engineer IV, Environmental
1.0
Engineer I, Environmental
1.0
Engineering (EIT)
3.0
Environmental Admin.
1.0
Division Director I
0.82
Special Projects Officer II
1.0
Total FTEs
8.82
Of the remainder, $134,944 will be used for indirect costs to accomplish the requirements of
the FFY-2017/2018 PWSS Program.
GOALS, OBJECTIVES, OUTPUT, AND DELIVERABLES
One of the set-asides authorized under the 1996 SDWA amendments is the management of
the state program, which can be funded by up to 10% of the federal allotment. These funds
will support public water system supervision program activities as required to maintain state
primacy and also to support the activities of the DWSIRLF. MSDH’s PWSS Work Plan
outlines in detail the aspects of the PWSS that are supported by this set-aside. Items covered
by the set-aside include: (1) State Primacy Requirements, (2) Non-Primacy Requirements,
and (3) Auxiliary Services.
Primacy Requirements
As required to maintain state primacy, MSDH maintains the PWSS programs on an ongoing
or as-needed basis. These programs include: revising current primacy programs by adopting
new Federal regulations as needed; coordinating for Mid-Year and End-of-Year review with
EPA Regional Office; maintaining a sanitary survey program with discrepancy follow-up;
participating in state data verification audits; ensuring public water systems (PWSs) are
utilizing approved laboratories and a certification program for those laboratories is in place;
participating in the EPA Regional oversight; operating in accordance with requirements of
the National Primary Drinking Water Regulations; maintaining an active water system design
and construction plan and specification review program; ensuring labs used by PWSs within
the state are capable of the workload created by regulations; participating in PWS and PWSS
training on rule requirements; informing EPA Region 4 of any special state initiatives under
the rules or provisions of the SDWA; maintaining records for all rule/policies, enforcing
reporting and record keeping as required; maintaining appropriate administrative penalty
authority; implementing the PWS definition; attending state/EPA planning and
implementation meetings; ensuring that newly permitted PWSs have design/construction
capable of compliance with the present and upcoming SDWA regulations; ensuring
analytical methods are being applied to demonstrate compliance with the regulations;
notifying (if necessary) EPA of intent not to adopt or implement any portion of the rules; and
responding to EPA requests for information or verification of state rules implementation.
Additionally, MSDH will provide annual summaries of the status of: each effective variance
and exemption to EPA; community PWSs that are allowed to monitor less frequently than
monthly; and non-community PWSs that are allowed to monitor less frequently than
quarterly to EPA. MSDH will also oversee and enforce requirements for rules and
regulations adopted with approved federal primacy. These regulations include the SDWA
and all applicable rules present and future, primacy packages, and extension agreements of
the SDWA.
Non-primacy Requirements
In addition to the requirements of the PWSS program, monies from this set-aside provide
support to activities that are of a non-primacy nature. Those activities are not required to
maintain state primacy. However, to run a highly effective, efficient program and most
importantly protect the public health, these activities are vital.
Capacity Development (CD) Program
As required by the SDWA, each state is required to develop and implement a Public
Water System Capacity Development Program in order to receive full funding annually
under the DWSRF Program. Public water system capacity assessment is a full evaluation
of the PWS’s technical, managerial, and financial ability to provide safe drinking water to
its customers by complying with all state and Federal regulations. In accordance with the
Federal requirements, MSDH has developed and implemented a CD program for both
new and existing PWSs. The MSDH CD program takes the form of a rating that each
community water system (CWS) and non-transient non-community water system
(NTNCWS) receives at their annual sanitary survey. The criteria used in the rating
system incorporate laws, regulations, and other valuable information to evaluate the areas
of technical, managerial, and financial capacity. The program is also designed to evolve
from year-to-year through an annual meeting of an advisory committee that will make
suggestions as to possible changes and/or additions to the rating criteria. As required by
regulation, an annual report is made to the Governor on the efficacy of the strategy and
progress towards improving the capacity of PWSs in the state. Additionally, annual
documentation of ongoing implementation of the CD strategy is to be provided with
DWSRF Capitalization Grant application.
Unregulated Contaminant Monitoring Rule
This particular aspect of the PWSS involves informing systems with populations greater
than 10,000 in the state monitoring plan of their responsibilities to monitor for
Unregulated Contaminant Monitoring Rule; assisting the EPA in sampling systems in the
state monitoring plan as determined by the state and EPA in the UCMR Partnership
Agreement; adding vulnerable systems to the plan for monitoring UCMR List 3
contaminants based on guidance; review UCMR data from public water systems to
ensure that it meets quality assurance and PWS reporting requirements necessary;
informing EPA of potential changes needed in the data and, with mutual agreement of the
state and EPA, make changes to the data; and responding as requested by the EPA for
information on verification of state UCMR implementation.
Operator Certification
As mandated by the SDWA to maintain full funding for the DWSIRLF, operator
certification is an essential part of the PWSS program. Activities required to maintain the
operator certification program include: providing documentation and evaluation of
ongoing program implementation for all annual program submittals subsequent to the
initial submittal; supply as required certification of changes and documentation of those
change that are made to the regulations of statutes; perform internal and external program
reviews as required by state law.
Source Water Assessment Program
On an annual basis, MSDH reports to EPA on Source Water Assessment Program
implementation activities. In FFY-1997, a set-aside for DWSIRLF allowed MSDH to
subcontract to the Mississippi Department of Environmental Quality to perform the
source water assessment. The assessment has been completed and a report has been
supplied to all of Mississippi’s PWSs.
Auxiliary Services
These services include various aspects related to data management, compliance, and
enforcement of the PWSS Program.
Information Management and the Safe Drinking Water Inspection System (SDWIS)
/Fed Reporting
These ongoing activities include: overseeing and enforcing requirements of data
management and the Safe Drinking Water Inspection System (SDWIS) /Fed reporting;
reporting the state’s PWSS inventory at least annually to SDWIS/Fed; reporting the
state’s violations and enforcement actions at least quarterly; participating in EPA/state
data managers conference calls; identifying the data manager and alternate for the
purpose of making secure transmissions of data intended for SDWIS/Fed through EPA’s
Central Data Exchange; establishing and following quality assurance procedures to
ensure that PWS data eventually entered in SDWIS/Fed is of the highest reliability and
maximum value to the public.
Inspection Strategy
This activity includes overseeing and enforcing requirements of the regulatory
requirements.
Management System for Non-compliant Systems
These activities include: overseeing and enforcing requirements of management systems
for non-compliant systems; provide current versions of its enforcement response guide;
assurances that the EPA has up-to-date information.
Rule Task Force
This requires participation in the Rule Writing Task Force and Rule Workshops.
Enforcement and Management of Significant Non-compliers (SNC’s)
Activities of this auxiliary service include: overseeing and complying with the
requirements of management significant non-compliers (SNC’s); and reporting the state’s
response to instances of significant noncompliance at public water systems.
The commitments as stated here and in the PWSS Work plan are adopted as
commitments of the State Program Management set-aside.
SCHEDULE FOR COMPLETING ACTIVITIES
The schedule for completing State Program activities under this work plan will be the
schedule established by dates entered in the “Date Due” column of the MSDH PWSS Work
plan.
AGENCY RESPONSIBILITIES
The MSDH is the agency responsible for implementing required activities under the State
Program Management set-aside.
EVALUATION PROCESS TO ASSESS THE SUCCESS OF SET-ASIDE ACTIVITIES
The success of State Program Activities will be defined by the ability of the MSDH to
successfully meet commitments in the PWSS Work Plan. Quarterly and annual
reports/submittals required by the PWSS program include documentation and evaluation of
ongoing program implementation and success in meeting stated commitments.
Appendix G
Local Assistance and Other State Programs Annual Work plan
Section 1452(g)(2) - Safe Drinking Water Act Amendments of 1996
INTRODUCTION
The Mississippi State Department of Health (MSDH), Bureau of Public Water Supply
(Department), will use the Local Assistance and Other State Programs Set-aside of the
DWSRF in a wellhead protection and assistance program. The program will be eliminating
inactive wells and/or open holes which pose a contamination risk to the state’s groundwater
aquifers, by properly abandoning them in accordance with state guidelines. Local
governments realize that the inactive wells/open holes pose a risk of contamination to the
groundwater which may be utilize via their active wells; however, funds to properly abandon
wells/holes are limited. The financial assistance provided through this set-aside will allow
the state, by way of contractual agreement(s), to identify and then properly abandon inactive
wells/open holes posing contamination risks to the state’s groundwater aquifers.
SELECTION PROCESS
The contract for coordination of the decommissioning/properly closing inactive water
wells/open holes was bid and awarded; the contract will run through June 30, 2017. A new
contract for the decommissioning/properly closing inactive water wells/open holes is
currently being developed in accordance with new State contracting requirements.
An Invitation For Bids (IFBs) for the coordination of the decommissioning/properly closing
inactive water wells/open holes was sent to qualified potential contractors. Bids received
were reviewed by the Department to select the lowest and best bid for the agency.
Recommendations for award of a contract were presented to the Board at their regularly
scheduled Board meeting; following authorization by the Board, the coordination contract
was awarded.
The contracts for the coordination and decommissioning/properly closing inactive water
wells/open holes currently reside as following:
The first contract (the coordination contract) - Mississippi Rural Water Association
(MsRWA).
The second contract (closure contract) – is currently being developed in accordance with
new State contracting requirements .
PROGRAM ACTIVITIES
The activities described herein will be accomplished through a four part process:
Identification of wells / holes needing proper abandonment for the protection of aquifers and
the overall public health; communication with public water supply that owns well/hole to
encourage proper abandonment; mobilization of well contractor to identified site to perform
the work; and confirmation that the work has been completed.
Identification – The contractor will use a list provided by the Department through a
cooperative effort with the Mississippi Department of Environmental Quality Office of
Groundwater Resources (MDEQ) to identify wells or open holes owned by particular water
systems to be abandoned. Wells/holes deemed high risk by MDEQ will be sought out first
for abandonment. Upon completion, wells/holes that are considered medium risk will be
addressed next, then low risk.
Communication – Staff from the contractor will meet with system officials to encourage
them to properly abandon existing inactive wells or open holes posing risk of contamination
to their water system and aquifer. This is considered essential to successfully achieving the
goal of abandoning those wells/holes posing risk.
Mobilization – Once the communication phase has been completed, staff of the MSW&MW,
the licensed well driller contractor and the well closure coordinator will mobilize to the
selected site and commence with the proper abandonment of the well/hole. This will be
accomplished in accordance with established guidelines set forth by the MDEQ Office of
Groundwater. When the abandonment is complete, the well contractor will contact the well
closure coordinator to inform them of project completion.
Confirmation – Staff of the well closure coordinator will perform site visits to confirm
proper abandonment of the wells/holes. When the abandonment is confirmed, the well
closure coordinator will notify the Department to ensure that each abandoned well matches
invoices submitted for payment.
SCHEDULE FOR COMPLETING ACTIVITIES
The schedule for completing Local Assistance and Other Program activities under this work
plan will be the schedule established by set contractual dates.
AGENCY RESPONSIBILITIES
The MSDH will be monitoring contractors throughout the process to ensure effective
completion of contractual assignments.
EVALUATION PROCESS TO ASSESS THE SUCCESS OF SET-ASIDE ACTIVITIES
The success of this set-aside will be defined by the ability of the MSDH through the solicited
contractor(s) to remove by proper abandonment wells or open holes that potentially pose a
risk to existing water supplies and the aquifers which supply the well water.
Appendix H
Mississippi State Program Management Set-Aside Match Requirements - Mississippi 1:1
Requirement
FFY-2017
PWSS Grant
$860,700
State Required Match for PWSS Grant
$860,700
Actual State PWSS Contribution
$3,264,627
State PWSS Overmatch
$2,403,927
State PWSS Expenditures Eligible for 1:1 SPM Match
$3,264,627
State PWSS Expenditures Claimed for 1:1 SPM Match
$860,700
Mississippi requests $860,700 of its FFY-2017 DWSRF Capitalization Grant be set-aside for
State Program Management (SPM) to support Public Water Supply Supervision (PWSS)
activities. To comply with the additional 1:1 match requirement for SPM set-asides, $860,700 in
additional state funds will be required. The state will provide an estimated $2,403,927 above the
state’s PWSS match requirement in FFY-2017. This contribution is provided through the
collection of Water Quality Analysis Fees by the MSDH Bureau of Public Water Supply. In
accordance with Section 1452(g)(2) of the SDWA of 1996, the state claims $860,700 from its
FFY-2017 PWSS overmatch as credit to satisfy the $860,700 additional state match required to
set-aside $860,700 of its FFY-2017 Capitalization Grant for SPM activities.
Appendix I
Coordination Schedules for Jointly Funded Projects
FFY-2017 DWSIRLF COORDINATION SCHEDULES FOR JOINTLY FUNDED PROJECTS
These schedules are designed to help assure coordination between the DWSIRLF Program and the Appalachian Regional Commission (ARC) Grant
Program, Community Development Block Grant (CDBG) Program, and Rural Utilities Service (RUS) Loan/ Grant Program. These schedules are,
however, subject to change due to the timing of federal appropriations or program changes.
Date(s)
Schedule Item(s)/Deadline(s)
ARC
CDBG
RUS*
May 1,
Mississippi Appalachian Regional Office
(MARO) notifies potential applicants & local
Planning & Development Districts of the
September 1, 2016, deadline for submitting
complete ARC grants applications.
(N/A)
(N/A)
Sept 1,
All FY-2017 ARC project applications due at
MARO in Tupelo, MS by 5:00 p.m.
Proposals received afterward will only be
considered as "back-up" projects.
(N/A)
(N/A)
Oct 1,
2016**
Deadline for loan applicant to submit a
complete DWSIRLF facilities plan to MS
State Department of Health (MSDH). The
plan must reflect anticipated ARC funding,
and must indicate if the loan applicant intends
to proceed with the project; 1) only if ARC
funds are received, or 2) regardless of ARC
funding.**
Deadline for loan applicant to submit a
complete DWSIRLF facilities plan to MS
State Department of Health (MSDH). The
plan must reflect anticipated CDBG funding,
and must indicate if the loan applicant
intends to proceed with the project; 1) only if
CDBG funds are received, or 2) regardless of
CDBG funding.**
Deadline for loan applicant to submit a
complete DWSIRLF facilities plan to MS
State Department of Health (MSDH). The
plan must reflect anticipated RUS funding,
and must indicate if the loan applicant intends
to proceed with the project; 1) only if RUS
funds are received, or 2) regardless of RUS
funding.**
Oct, 2016
MS State Dept. of Health (MSDH) notifies
MARO of loan applicants who have
submitted complete facilities plans which
indicate anticipated FY-2017 ARC funding.
MARO notifies MSDH of ARC grant
applicants who submitted pre-applications
which indicate anticipated FY-2017
DWSIRLF funding.
MS State Dept. of Health (MSDH) notifies
Mississippi Development Authority (MDA)
of loan applicants who have submitted
facilities plans which indicate anticipated
FY-2017 CDBG funding.
MS State Dept. of Health (MSDH) notifies U.
S. Department of Agriculture, Rural Utilities
Service (RUS) of loan applicants who have
submitted facilities plans which indicate
anticipated FY-2017 RUS funding
Nov 15,
MARO completes review of FY-2016 projects
and briefs Governor on proposed Priority 1
and Priority 2 project lists, as well as projects
not eligible to be funded.
(N/A)
(N/A)
ARC
CDBG
RUS
Nov 15-30,
MARO notifies local Planning &
Development Districts of projects that have
been selected for the P1 (fundable priority
list). MARO will copy MSDH on these
notification letters if grantee has indicated that
it is pursuing DWSIRLF loan funds for the
project. MSDH will not award a DWSIRLF
loan until this notification from MARO is
provided.
(N/A)
(N/A)
Oct 18,
(N/A)
CDBG program application workshops.***
(N/A)
Nov, 2016
MSDH advertises Draft DWSIRLF FFY-2017
Intended Use Plan for public comment.
MSDH advertises Draft DWSIRLF FFY-
2017 Intended Use Plan for public comment.
MSDH advertises Draft DWSIRLF FFY-2017
Intended Use Plan for public comment.
Dec 30,
Deadline for all FY-2017 Priority 1
documentation and forms to be submitted to
MARO.
(N/A)
(N/A)
Dec, 2016
Board adopts FFY-2017 DWSIRLF Intended
Use Plan accounting for anticipated ARC
award amounts if identified in facilities plan.
Board adopts FFY-2017 DWSIRLF Intended
Use Plan, accounting for anticipated CDBG
award amounts if identified in facilities plan.
CDBG public facilities applications, along
with one copy of the DWSRLF loan
application with maps and appropriate
attachments will be accepted from 12/7/2016
until 8/2017
Board adopts FFY-2017 DWSIRLF Intended
Use Plan, accounting for anticipated RUS
award amounts if identified in facilities plan.
Jan 20,
(N/A)
Deadline for a CDBG grant applicant to
submit a water viability review form to
MDA.
(N/A)
Jan, 2017
MSDH notifies MARO of projects included
on final FFY-2017 Priority List that anticipate
receiving FFY-2017 ARC funds.
MSDH notifies MDA of projects included on
the Final FFY-2017 Priority List that
anticipate receiving FFY-2017 CDBG funds.
MSDH notifies RUS of projects included on
the final FFY-2017 Priority List that
anticipate receiving FFY-2017 RUS funds.
ARC
CDBG
RUS
Feb 1,
MARO sends project applications to ARC-
Washington to start final funding approval
process.
(N/A)
(N/A)
Feb 16,
(N/A)
CDBG public facilities applications, along
with one copy of the DWSIRLF loan
application with maps and appropriate
attachments, will be accepted from
2/16/2017 until 4:00 p.m. on 2/17/2017.
(N/A)
Feb- Jun,
ARC-Washington starts the final funding
approval process and awards ARC grants
during the spring or summer of 2017.
(N/A)
(N/A)
Mar, 2017
(N/A)
MDA provides notification to MSDH that
complete CDBG applications have been
received.
(N/A)
May 1,
2017**
Deadline for loan applicants to submit a
completed DWSIRLF loan application to
MSDH for the total DWSIRLF eligible costs,
less the amount of anticipated ARC award to
be applied to DWSIRLF eligible costs.**
Deadline for loan applicants to submit a
completed DWSIRLF loan application to
MSDH for the total DWSIRLF eligible costs,
less amount of anticipated CDBG award to
be applied to the DWSIRLF eligible costs.**
(NOTE: If the loan recipient is pursuing a
CDBG grant to cover part of the cost of
construction, the loan recipient has the option
to include the anticipated CDBG grant
amount in the detailed cost breakdown in the
application, or may request 100% DWSIRLF
funding with the possibility of amending the
loan application later if the loan recipient is
awarded a CDBG grant prior to receipt of
bids for construction. However, the
DWSIRLF loan application must be
consistent with the DWSIRLF facilities plan
for the project.)
Deadline for loan applicants to submit
complete DWSIRLF loan applications to
MSDH for the total DWSIRLF eligible costs,
less amount of anticipated RUS award to be
applied to DWSIRLF eligible costs.**
(NOTE: If the loan recipient is pursuing an
RUS grant/loan to cover part of the cost of
construction, the loan recipient has the option
to include the anticipated RUS grant/loan
amount in the detailed cost breakdown in the
application, or may request 100% DWSIRLF
funding with the possibility of amending the
loan application later if the loan recipient is
awarded an RUS grant/loan prior to receipt of
bids for construction. However, the
DWSIRLF loan application must be
consistent with the DWSIRLF facilities plan
for the project)
ARC
CDBG
RUS
May, 2017
(N/A)
MDA provides notification to MSDH of
which projects fall within the funding range
for CDBG grants for construction contingent
upon matching funds being in place.
(NOTE: MSDH will not award a DWSIRLF
loan until this notification from MDA is
provided.)
(N/A)
Jun, 2017
MSDH provides notification to MARO that
complete DWSIRLF loan applications have
been received.
MSDH provides notification to MDA that
complete DWSIRLF loan applications have
been received. MDA provides conformation
to MSDH of which projects fall within the
funding range for CDBG grants for
construction contingent upon matching funds
being in place.
MSDH provides notification to RUS that
complete DWSIRLF loan applications have
been received.
(Upon
Grant
Award)
MARO provides notification to MSDH that
ARC awards have been made.
MDA provides notification to MSDH that
CDBG awards have been made.
RUS provides notification that RUS awards
have been made
Aug 1,
2017**
All approvable documents and responses to
comments necessary for loan award must be
submitted to MDEQ for review and
approval.**
All approvable documents and responses to
comments necessary for loan award must be
submitted to MDEQ for review and
approval.**
All approvable documents and responses to
comments necessary for loan award must be
submitted to MDEQ for review and
approval.**
May-Sep,
Loan applicants receive DWSIRLF loan
awards from MSDH. The amount of the loan
will be the total DWSIRLF eligible cost less
the ARC award amount to be applied to
DWSIRLF eligible costs.
Loan applicants receive DWSIRLF loan
awards from MSDH. The amount of the
loan will be the total DWSIRLF eligible cost
less the CDBG award amount to be applied
to DWSIRLF eligible costs.
Loan applicants receive DWSIRLF loan
awards from MSDH. The amount of the loan
will be the total DWSIRLF eligible cost less
the RUS award amount to be applied to
DWSIRLF eligible costs.
If loan applicant desires DWSIRLF loan
award prior to RUS award, loan applicant
must provide MSDH with a copy of letter
from RUS which states their project will be
funded only contingent upon receipt of
DWSIRLF matching funds. MSDH will not
award a DWSIRLF loan until that notification
from RUS is provided.
ARC
CDBG
RUS
(Upon
Loan
Award)
MSDH sends a copy of the award letter to
MARO.
MSDH sends a copy of the award letter to
MDA.
MSDH sends a copy of the award letter to
RUS.
*
General Guidance regarding DWSIRLF/RUS coordination: The RUS is an agency of the United States Department of Agriculture which provides
loans and grants for water and wastewater projects. Eligible applicants must be public entities, nonprofit organizations, or Indian tribes that serve
communities with populations under 10,000. RUS funds may be used in conjunction with other Federal, State, or local funds. Applications for RUS funds
will be accepted at any time during the year, and involve an environmental review that includes public notifications and comment periods. RUS projects
are funded at any time during the year as long as funds are available. RUS funds are allocated by Congress in October of each year, and are usually spent
as complete applications are received. Therefore, it is generally to the applicant’s advantage to file applications earlier in the year. To receive an
application package or other information, contact Rural Utilities Service, 100 West Capitol Street, Suite 831, Jackson, MS 39269; telephone: (601) 965-
5460; fax: 844-325-7034.
**
FFY-2017 DWSIRLF Priority System Deadline
***
“To Be Announced” (Date has not yet been set.)
Appendix J
Drinking Water Systems Emergency Loan Fund Program
Section 41-3-16, Mississippi Code of 1972, as amended, created the Drinking Water
Systems Emergency Loan Fund Program (DWSELF). This program provides loans
to counties, municipalities, districts, or other (tax exempt) water organizations for
emergency construction, repair, or replacement of drinking water facilities. This
entirely state-funded loan program provides a ready funding source for such
emergency projects without the federal cross-cutter requirements required in the
Drinking Water Systems Improvements Revolving Loan Fund (DWSIRLF) Program,
thereby saving valuable time and expense. This Program eliminates the need to
address emergency loans in the DWSIRLF. The Board encourages eligible water
organizations throughout the state to utilize this program whenever emergency
drinking water projects are needed.
The basic provisions of this program are: 1) a current interest rate of 2.0%; 2) a
maximum single loan amount as determined by the Board; 3) a maximum repayment
period of five (5) years; and 4) the project must meet the definition of an emergency
as established in the program regulations. It is also important to note that loan
recipients do not pay interest during the original construction period (capitalized
interest), and that loan repayments do not begin until after project completion.
Allowable costs for the project may not be incurred prior to the budget period
established in the loan agreement, which may not begin more than 30 days prior to
receipt of the loan application.
Costs for the project will be paid on a reimbursement basis, based upon the actual
allowable expenditures of the loan recipient.
Appendix K - Certifications
In addition to the ten (10) assurances included below, the state acknowledges that there are six
(6) additional assurances that the state has agreed to in either the Operating Agreement between
the State and EPA Region IV or the annual capitalization grants. These two documents are
hereby incorporated into this IUP by reference.
1.
The state certifies that all drinking water facility projects in this IUP identified in Section
VII as being subject to the federal cross-cutting requirements are or will be in compliance
with all such requirements prior to the state entering into an assistance agreement with
the recipient.
2.
The state certifies that it will make an annual report to the Regional Administrator on the
actual uses of the funds and how the state has met the goals and objectives for the
previous two fiscal years as identified in the IUPs; and to annually have conducted an
independent audit of the funds to be conducted in accordance with generally accepted
government accounting standards.
3.
The state certifies that this IUP will be subjected to public review and comment prior to
final submission to EPA. The state certifies that it will follow the “Mississippi
Administrative Procedures Law” in seeking public review and comments on this IUP. A
copy of the “Mississippi Administrative Procedures Law” can be obtained from the
Mississippi Secretary of State’s Office, and can also be found on the MSDH’s website at
www.msdh.state.ms.us/dwsrf.
An oral proceeding will be held to receive written and oral comments on this IUP. A
transcript of the public hearing recording the comments and recommended solutions will
be submitted to EPA along with the Final IUP. Anyone desiring to receive a copy of the
oral proceeding transcript should contact Ulysses Conley, Program Support Specialist, at
(601) 576-7518 to request copies.
4.
The state certifies that all drinking water facility projects in this IUP are on the project
Priority List developed pursuant to the requirements of Section 1452(b)(3)(B), SDWA.
5.
The state certifies that it will enter into binding commitments for 120% of the amount of
each payment (LOC) under the capitalization grant within one year after receipt of each
payment (LOC).
6.
The state certifies that it will commit and expend all Drinking Water Systems
Improvements Revolving Loan Fund (DWSIRLF) Program monies as efficiently as
possible, and to disburse the funds in a timely and expeditious manner.
7.
The state certifies that it will conduct environmental reviews on all DWSIRLF cross-
cutter equivalency projects in accordance with the State Environmental Review Process
(SERP).
8.
The state certifies that prior to adding any new projects to the “FFY-2018 and After
Planning List” for the purpose of funding such a project during FFY-2017 that the state
will follow the “Mississippi Administrative Procedures Law” in amending this IUP in
order to allow for public review and comments.
9.
The state certifies that it has developed and implemented a Capacity Development (CD)
strategy to assist public water systems in acquiring and maintaining technical,
managerial, and financial capacity as required in Section 1420(c) of the 1996
Amendments to the SDWA. This CD program is currently approved by EPA.
10.
The state certifies the State’s Operator Certification Program is currently approved by
EPA.