6 MAC Pt. 4, R. 4.5
Application Requirements
Cite as 6 Miss. Admin. Code Pt. 4, R. 4.5
Application Requirements. The application must include the following:
A. A detailed description of the project and narrative explaining how the specific
improvements will affect economic development and/or job creation in the area,
together with supporting documentation.
B. Engineering/Architects Report: This should include a cost estimate and timeline.
Cost estimate must be submitted by an engineer or architect on their letterhead as a
signed and stamped original. The timeline should outline the project construction
from implementation to the completion of construction.
C. Budget Sheet
D. Memorandum of Agreement.
E. Executed copy of the Resolution of Authorization for DIP funds
F. Copy of building title and lease (applicable if the project includes a building
purchase construction, or rehabilitation)
G. E-Verification for the applicant and benefitting business
H. Detailed Map showing location of proposed project. Maps must explicitly
correspond to the proposed scope of activities within this project.
I. The applicant must submit one original of the application to MDA. Complete
application must be submitted with bottom tabbed dividers in between each
attachment. All documentation should have original signatures.
J. Applications can be mailed to: Mississippi Development Infrastructure Program,
Mississippi Development Authority, Community Services Division, Post Office Box
849, Jackson, Mississippi. MDA will evaluate the application to determine if the
project meets program criteria.