MAC Pt. 18, R. 1.6.12

Division Review and Follow-Up

Year: 2026Length: 98 wordsOfficial source

Cite as Miss. Admin. Code Pt. 18, R. 1.6.12

Division Review and Follow-Up. 1. The Division shall review all submitted Certified Installer connection-event inspections. 2. The Division shall determine whether: a. A Certificate of Acknowledgement may be issued. b. A full Division inspection is necessary or warranted. c. A system repair or system replacement is required after a Division inspection when a Certified Installer inspection issues a Failed Inspection or Non- Operational determination (as described in Rule 1.6.8). It is the responsibility of the Property Owner to contact the Division for system repair or system replacement options. 3. Enforcement actions may only be initiated by the Division.
MAC Pt. 18, R. 1.6.12: Division Review and Follow-Up | Justis AI