MAC Pt. 18, R. 2.1.30
Certified Installer Responsibilities
Cite as Miss. Admin. Code Pt. 18, R. 2.1.30
Certified Installer Responsibilities.
1.
May not design, construct or install, or cause to be designed, constructed or installed an
Individual On-site Wastewater Disposal System that does not comply with this chapter
and rules and regulations of the Board.
2.
Provide documentation and certification from the Manufacturer that a Certified Installer
of alternative systems or products has been factory-trained and listed as an authorized
representative.
3.
Furnish proof of certification to a property owner, lessee, the owner’s representative or
occupant of the property on which an Individual On-Site Wastewater Disposal System is
to be designed, constructed, repaired or installed by that Certified Installer and to the
Department or its authorized representative, if requested.
4.
Notify the Department at least 24 hours before beginning construction of an Individual
On-site Wastewater Disposal System and, at that time, schedule a time for inspection of
the system with the appropriate county Department.
5.
Shall be present on the jobsite at the time of the scheduled inspection.
6.
Shall not cover his/her work with soil or other surface material unless the installer has
received authorization to cover the system after an inspection by a county Department of
Health inspector.
7.
Provide a signed affidavit from the Certified Installer, Certified Professional Evaluator or
registered Professional Engineer and any additional required documentation that the
system was installed in compliance with all requirements, regulations and permit
conditions applicable to the system installed. The Affidavit must be given to the
Applicant of the Notice of Intent.
8.
Notify the Division within 10 working days of any change in address, business
partnership or affiliation, or any other status that affects his/her standing as a Certified
Installer. Such notice must be in writing or by fax and must be delivered to the Division
as soon as practicable after the effective date of the change.
9.
Pay the required re-inspection fee.
10.
Comply with National Sanitation Foundation/American National Standard Institute
Standard 40 and Rule 2.1.30(11) if providing maintenance.
11.
Maintenance Provider Responsibilities:
a.
Provide on all Advanced Treatment Systems an affidavit from the property owner
agreeing to a continuing maintenance agreement on the installed system at the end
of the required manufacturer’s maintenance agreement.
b.
Provide the property owner with a continuing maintenance agreement on all
Advanced Treatment Systems in perpetuity.
c.
Furnish proof of certification to an individual before entering a contract with that
individual for the continuing maintenance of an individual on-site wastewater
disposal system.
d.
Provide 2 inspections annually to the homeowner. Each must include the
homeowner name/address, date, time and list of components repaired or replaced.
This report must be submitted to the Division on a yearly basis.
e.
Provide a sample contract and/or list of services to the Division, when requested.
f.
Submittal Reports:
i.
Inspecting and evaluating Individual On-Site Wastewater Disposal
Systems to determine if they are compliant with state law and being
properly maintained.
ii.
Keeping accurate records of systems inspected and repaired.
iii.
Issuing inspection reports to property owners and the Division on a
biannual basis from date of contract.