MAC Pt. 18, R. 4.2.2

Criteria

Year: 2026Length: 72 wordsOfficial source

Cite as Miss. Admin. Code Pt. 18, R. 4.2.2

Criteria. 1. Absence of Frequent Flooding. 2. Landscape position. 3. Drainage way. 4. Slope (topography). 5. Depth to seasonal high water table (chroma 2 or less) in inches. 6. Depth (inches) to restrictive Soil Horizon (i.e., bedrock, fragipan, plinthite, etc.). 7. Soil texture, Munsell Soil Color Chart, and depth (inches) of Soil Horizons. 8. Setbacks. 9. Residence, property line, or other external structures. 10. Water supply. 11. Sensitive Waters. 12. Available Space.
MAC Pt. 18, R. 4.2.2: Criteria | Justis AI