MAC Pt. 18, R. 5.5.10
Distribution of Effluent: Aggregate Replacement Pipe Systems
Cite as Miss. Admin. Code Pt. 18, R. 5.5.10
Distribution of Effluent: Aggregate Replacement Pipe Systems.
1.
Aggregate Replacement Pipe Systems:
a.
When a change in elevation of the disposal trench is required, a distribution box,
connecting lateral or crossover must be used. At the point where a crossover line
leaves a lateral, the trench for the crossover line shall be dug no deeper than the
top of the aggregate replacement pipe in the preceding trench so that an
undisturbed block of earth will remain in place for the full depth of the aggregate
replacement pipe. The distribution box shall be level and supply all lines equally.
Field lines must be equal lengths when served by one distribution box.
b.
Distribution boxes may be used to connect the effluent line to the effluent
distribution lines. Non-perforated rigid pipe shall exit the distribution box for a
minimum of five feet at level grade before the effluent distribution line
(perforations) begins.
c.
Crossover lines shall be laid on undisturbed earth. The invert of the crossover
must be at least four inches lower than the invert of the septic tank outlet line.
Crossovers shall be constructed as shown in Figure 13.