11 MAC Pt. 2, R. 2.14
CAFOs
Cite as 11 Miss. Admin. Code Pt. 2, R. 2.14
CAFOs. Concentrated animal feeding operations (CAFOs) are not excluded from the
requirements for a permit or any other provisions of these regulations. CAFOs issued a National
Pollutant Discharge Elimination System permit or a state water pollution control permit prior to
January 18, 2000, are required to submit an application for a permit to construct and/or operate
or a multimedia permit in compliance with the provisions of these regulations at least 180 days
prior to the expiration of the facility's NPDES permit or state water pollution control permit that
was issued prior to the effective date of these regulations. Multimedia permits may be issued by
the Permit Board as new permits or as a modification of an existing National Pollutant Discharge
Elimination System or state water pollution control permit but all provisions and procedures of
these regulations are applicable. The Permit Board on its own initiative or at the request of
DEQ, may require any existing or new animal feeding operation or concentrated animal feeding
operation to obtain a multimedia permit, including provisions regarding air emissions and/or
odor control.