11 MAC Pt. 2, R. 8.1
Requirements for Control Technology Determinations for Major Sources in Accordance
Cite as 11 Miss. Admin. Code Pt. 2, R. 8.1
Requirements for Control Technology Determinations for Major Sources in Accordance
with Clean Air Act Section 112(g).
A.
Regulations for case-by-case maximum achievable control technology (MACT)
applicable to facilities affected by the requirements of Section 112(g) of the Federal
Clean Air Act are those regulations duly promulgated by the United States Environmental
Protection Agency in (or to be printed in) Subpart B of Part 63 of Title 40 of the Code of
Federal Regulations (C.F.R.). All such regulations promulgated by United States
Environmental Protection Agency are incorporated herein and adopted by reference by
the Mississippi Commission on Environmental Quality as official regulations of the State
of Mississippi and shall hereafter be enforceable as such except as follows:
(1)
The "effective date of Section 112(g)(2)(b)" as defined in 40 C.F.R. 63.41 shall be
the effective date of this regulation.
(2)
The "permitting authority" as defined in 40 C.F.R. 63.41 shall be the "Mississippi
Environmental Quality Permit Board" (Permit Board).
(3)
The "Notice of MACT Approval" as defined in 40 C.F.R. 63.41 shall be the
"Permit to Construct" pursuant to Commission Regulation, Miss. Admin. Code,
Title 11, Part 2, Chapter 2, Permit Regulations for the Construction and/or
Operation of Air Emissions Equipment, as adopted by the Mississippi
Commission on Environmental Quality (Commission) and said Permit to
Construct shall include the case-by-case MACT determination.
(4)
In lieu of the administrative procedures for review of the Notice of MACT
Approval as set forth in 40 C.F.R. 63.43(f)(1) through (5), the Permit Board will
follow Commission Regulation, Miss. Admin. Code, Title 11, Part 2, Chapter 2,
Permit Regulations for the Construction and/or Operation of Air Emissions
Equipment, as adopted by the Commission.
(5)
In lieu of the opportunity for public comment on the Notice of MACT Approval
as set forth in 40 C.F.R. 63.43(h), the Permit Board will provide opportunity for
public comment on information submitted by the owner or operator. The public
information will include the Mississippi Department of Environmental Quality's
(MDEQ’s) analysis of the case-by-case MACT determination, including the
MDEQ's recommendation for permit issuance or denial. The public information
and opportunity for comment shall also include the following:
(a)
availability for public inspection in at least one location in the area
affected of the information submitted by the owner or operator and of
MDEQ's recommendation and the draft permit;
(b)
a 30-day period for submittal of public comment; and
(c)
a notice, by prominent advertisement in the area affected, of the location
of the source information.
B.
Applicability.
(1)
Overall requirements. The requirements of the regulations referenced in Rule
8.1.A. apply to any owner or operator who constructs or reconstructs a major
source of hazardous air pollutants after the effective date of this regulation unless
the major source in question has been specifically regulated or exempted from
regulation under a MACT standard issued pursuant to Section 112(d), a work
practice standard or other requirement pursuant to Section 112(h), or an
equivalent emission limitation by permit pursuant to Section 112(j) and
incorporated in another Subpart of Part 63, or the owner or operator of such major
source has received all necessary air quality permits for such construction or
reconstruction project before the effective date of the regulations referenced in