A.
Conceptual Exposure Model (SCEM)
(1) The SCEM is a graphical representation of actual and potential Site conditions
based on available data and an understanding of those Site conditions. A
BASELINE and a REMEDIAL SCEM must be completed and are provided in
forms prescribed by MDEQ. The BASELINE SCEM represents the risk and
exposure conditions that exist prior to the implementation of remediation. The
REMEDIAL SCEM represents the risk and exposure conditions that exist or are
expected to exist after the implementation of remediation. Items to be identified in
the SCEM include the following:
(a)
chemical of concern (CoC) sources;
(b)
CoC movement (migration/transport);
(c)
the actual or potential exposure pathways; and
(d)
the actual or potential receptor populations.
(2)
Based on the results of the completed BASELINE SCEM, exposure point
concentrations (EPCs) must be identified for CoC(s) with completed and
potentially completed exposure pathways. EPCs are the concentrations of site-
related compounds in a specific media that a human or environmental receptor
will contact (Complete) or may potentially contact (Potentially Complete) through
ingestion or inhalation at the point of exposure.
(3)
All four elements identified in the SCEM must be complete for exposure to occur.
It is important to note that the BASELINE SCEM should be developed early in
the process (i.e., Brownfield Application and/or work plan stage) and identified as
"draft" if additional information is pending. The BASELINE SCEM can be
updated and modified as the site investigation progresses and more site-specific
information becomes available. BASELINE SCEM should be identified as "final"
once the Site Characterization is complete.
(4)
If additional issues of concern pertaining to exposure at the site (additional
pathways, media, sources, transport mechanisms, receptors, etc.) are not
specifically addressed in the SCEMs, the Applicant should provide an
attachment(s) to the appropriate SCEM discussing the additional issues.
(5)
The BASELINE and REMEDIAL SCEM worksheets must be included as part of
the Site Characterization Report and the Corrective Action Report.
(6)
The procedures for completing the SCEMs follow:
(a)
Identify the Primary Sources (on-site and off-site) of contamination that
exist or are believed to have existed.
(b)
Identify the Secondary Sources. Mark the media (soils, groundwater,
sediments, or surface water) that have been impacted (Complete) or could
potentially be impacted (Potentially Complete) by a release from a
primary source.
(c)
Identify the Transport Mechanisms by which the contaminants may move
through the environment.
(d)
Identify the Exposure Pathway that is the medium (soil, groundwater, air,
sediments, or surface water) that a receptor will contact (Complete) or
may contact (Potentially Complete).
(e)
Identify the Actual (Complete) and the Future (Potentially Complete)
Receptors for restricted and unrestricted land-use.
B.
Criteria For Completing The SCEMs
(1)
BASELINE SCEM - The following sections describe the criteria for evaluating
the completeness and potential completeness of contaminant exposure for the
Site. All potential exposure pathways should be evaluated for completeness, as
identified in the SCEM worksheets. The Applicant should provide as much detail
as possible. Indicate all sources, transport mechanisms, pathways and receptors
that are complete or potentially complete. If information is not available to
support a pathway as incomplete then that pathway should be considered to be
potentially complete and should be identified for evaluation until such
information becomes available. A description of each of the BASELINE SCEM
criteria is provided in the following sections.
(a)
Sources can be defined as either Primary Sources or Secondary Sources.
Primary Sources are those present or past storage units (i.e., tanks,
impoundments, piles), distribution systems (i.e., piping, manifolds, lines,
pumps), operations (i.e., wash areas, repair bays, water treatment, blending
tanks, formulation areas), waste management units (i.e., burn pits, disposal
units, dumps) and other on-site and off-site sources of actual or potential
contamination that have or may have leaked, leached, spilled, or otherwise
been released and may have impacted the Site. Several categories of
potential primary sources are included on the SCEM worksheet and can be
identified by filling in the appropriate boxes on the worksheet. If the
sources listed do not pertain to the Site, then use "Other". The Applicant
should be as specific as possible about the source of contamination.
Supporting
documentation
(i.e.,
analytical
results,
product
storage/transmission information, tank information, etc.) of the primary
source of contamination should be provided in the appropriate section(s)
of the Work Plan and/or Site Characterization Report.
Secondary Sources are defined as transport media (i.e., surficial soils,
subsurface soils, groundwater, sediments, or surface water) that have been
impacted or potentially impacted by the primary (release) source. Identify
all media that may serve as secondary sources of contamination. For the
purposes of this Subchapter 2 surficial soil is defined as extending to 6
ft. below ground surface (bgs). The presence of CoCs that cannot be
attributed to background should be identified as "complete," and any
secondary source that is potentially affected by an on-site or off-site
primary source should be identified as potentially complete." The
Applicant must provide adequate documentation to demonstrate that a
secondary source has not been affected in order to remove that
medium from further consideration. If such documentation has not yet
been gathered to support the exclusion of a secondary source, then that
medium must be identified as "potentially complete" until such time as
such information becomes available. The BASELINE SCEM can be
updated as additional site-specific data are gathered.
(b)
Transport Mechanisms are means by which the CoC release can migrate
from the identified secondary sources and result in actual or potential
human exposure. A variety of potential transport mechanisms are
generally applicable to a site. Indicate on the BASELINE SCEM
Worksheet those transport mechanisms that are applicable or potentially
applicable to the site. Those transport mechanisms identified as applicable
or potentially applicable should be marked "complete" or "potentially
complete," respectively.
(1)
Surficial Soils - If surficial soil has been identified as a secondary
source, then the following transport mechanisms must be identified
as "complete" or "potentially complete":
(i)
Wind Erosion and Atmospheric Dispersion (For Non-
Volatile Compound Only)
(ii)
Volatilization and Atmospheric Dispersion (For Volatile
Compounds Only)
(iii)
Volatilization and Enclosed-Space Accumulation (For
Volatile Compounds Only)
(iv)
Leaching and Groundwater Transport
Note: The Soil Exposure Pathway must also be identified as
"complete" or "potentially complete" if surficial soil has been
identified as a secondary source.
(2)
Subsurface Soils - If subsurface soil has been identified as a
secondary source, then the following transport mechanisms must
be identified as "complete" or "potentially complete":
(i)
Volatilization and Enclosed-Space Accumulation (For
Volatile Compounds Only)
(ii)
Leaching and Groundwater Transport
(3)
Groundwater – If groundwater has been identified as a secondary
source, then the following transport mechanisms must be identified
as “complete” or “potentially complete”:
(i)
Volatilization and Enclosed-Space Accumulation (For
Volatile Compounds Only)
(ii)
Leaching and Groundwater Transport
(4)
Sediments or Surface Water - If sediment or surface water has
been identified as a secondary source, then Surface Water Runoff
or Surface Water Transport must be identified as "complete" or
"potentially complete."
(c)
Exposure Pathways are the processes by which human uptake or
exposure to site-related compounds may occur. Identify all
"complete" or potentially complete" exposure pathways at the Site
that may provide a means for human exposure. All exposure
pathways should be identified as potentially complete if supporting
information for the exclusion of the pathway is not currently
available.
(1)
Soil - If surficial soils are affected, then direct exposure through
incidental ingestion must be indicated as complete or potentially
complete. Contamination in surface and subsurface soils may be
available for exposure through direct contact during intrusive
activities, such as construction. The future use of the site and any
plans for construction should be considered when evaluating the
completeness of direct contact to subsurface soils.
(2)
Air - Contamination of surface soil provides the potential for
human uptake or exposure through inhalation of vapor from
volatile compounds and through inhalation of non-volatile
compounds that have adsorbed to surface soil particulates.
Contamination of subsurface soil provides the potential for human
uptake or exposure through inhalation of vapor from volatile
compounds (i.e., migration into basements or during intrusive
activities such as construction) and through inhalation of non-
volatile compounds that have adsorbed to subsurface soil
particulates during intrusive activities, such as construction. In
addition, the presence of volatile compounds in groundwater at the
site produces the potential for volatilization into air (i.e., migration
into basements, depth to groundwater is less than six (6) feet or
intrusive activities).
(3)
Groundwater - Contamination of groundwater requires that the
Groundwater Exposure Pathway be marked as "complete" in the
BASELINE SCEM. Surface and subsurface soils capable of
leaching into groundwater at levels above the Groundwater TRG
require that the Groundwater Exposure Pathway be marked as
"complete" in the BASELINE SCEM. The presence of CoCs in
surface and subsurface soils requires that the Groundwater
Exposure Pathway be marked as "potentially complete" in the
BASELINE SCEM. The Applicant must provide adequate
documentation to demonstrate that CoCs in surface and
subsurface soils will not leach into groundwater in order to remove
that medium from further consideration. If documentation has not
been gathered to support the exclusion of exposure pathway, that
pathway must be identified as "potentially complete." The
BASELINE SCEM can be updated as additional site-specific data
are gathered.
(4)
Surface Water - The exposure pathways applicable to surface
water are included in the SCEM Worksheet in order to protect
surface water bodies that may be used for domestic or recreational
purposes. The presence of site-related compounds in soils,
sediments, surface water, or groundwater provides the potential for
migration or discharge to either on-site or off-site surface water
bodies that may be used for recreational purposes, for a potable
water supply, or for livestock watering. If contaminants are present
in onsite media and such a surface water body is present within
500 ft. of the Site boundary, the pathway should indicate
"potentially complete." Provide documentation in the Work Plan
and/or the Site Characterization Report that a water body is not
associated with or affected by the Site.
(d)
The identification of Potential Receptor populations at the site is an
important part of the completion of the BASELINE SCEM. It is important
to know as much about the current and potential future use of the site and
receptor populations, as possible. The receptor populations and the
planned future use of the site are integral in supporting the remedial
options at the site. Any and all potential receptor populations that could be
exposed to site-related compounds should be identified on the BASELINE
SCEM.
(2)
REMEDIAL SCEM - Once the BASELINE SCEM has been completed,
remedial options (i.e., institutional controls, engineering controls, or active
cleanup) for the Site that can "shut off" or eliminate exposure to contamination
should be evaluated. Those complete and potentially complete exposure routes
linking sources to receptor populations must be remediated using one or a
combination of options. Free product must be remediated in a manner consistent
with Rule 2.2.6(A)(4)(d). The REMEDIAL SCEM includes shut-off valves to
graphically depict "open" or "closed" pathways between contaminated media and
the receptor population. Shut-off valves are marked (shut) to indicate the remedial
action that has been taken or proposed for the Site. A description of the types of
remedial actions follow:
(a)
Institutional Controls - The use of institutional controls (land use
restrictions and agreed order with MDEQ) can serve as barriers in
preventing future contact with subsurface soils and groundwater. Site
land-use may be "unrestricted" or "restricted" that relates generally to
residential and industrial/commercial, respectively. The potential to
restrict the future use of the site (example: use of the site to a defined
industrial use only, or the limitations of future construction activities,
prohibiting groundwater use) can be considered in the remediation of
the Site. If no restrictions for future use will be placed on the property by
the Applicant, the identified remediation goals will be based on the
future unrestricted (residential) use of the Site. Documentation of the
institutional controls must be provided to support the proposed site
remediation. A land use restriction and agreed order with MDEQ
shall be used for "restricting" the Site. Institutional controls are to be used
to "shut off" exposure to contamination. The Site Characterization
Report and/or Corrective Action Plan must document the appropriate
restrictions to be implemented. The Institutional Control Shut-off Valve
on the REMEDIAL SCEM should be marked to reflect this option. An
institutional control by itself cannot be used if there is further migration
and/or Expansion of the contamination.
(b)
Engineering Controls - The use of engineering controls can reduce or
eliminate the potential for exposure to contaminants through containment.
Engineering Controls may include, but are not limited to, physical or
hydraulic control measures (such as groundwater recovery trenches and
leachate collection systems), groundwater treatment systems, engineered
caps, liner systems, slurry walls or permanent structures, but shall not
include the exclusive use of security fencing. Ingestion and dermal contact
of soil contamination that exists under a building may be considered "shut
off" provided the institutional control restricts contamination via
ingestion or dermal contact. If an engineering control is used to "shut-
off" exposure to contamination, the Site Characterization Report and/or
Corrective Action Plan must document the appropriate engineering control
and/or institutional control to be implemented. The Engineering Control
Shut-off Valve on the REMEDIAL SCEM should be marked to
reflect this option. An institutional control must be coupled with
the engineering control to ensure the engineering control is maintained
until the site is remediated to an unrestricted level.
(c)
Active Cleanup - The active cleanup (i.e., removal, treatment) of
contamination to levels that are protective of human health and the
environment can reduce or eliminate the potential for exposure to
contaminants. If active cleanup is used to "shut off" exposure to
contamination, the Site Characterization Report and/or Corrective Action
Plan must document the active cleanup activities and/or institutional
control to be implemented. The Active Cleanup Shut-off Valve on the
REMEDIAL SCEM should be marked to reflect this option. An
institutional control may be necessary, depending upon the projected
length of the cleanup, particularly if groundwater has been impacted (e.g.,
pump and treat system has been installed and projected to continue for 30
years).
C.
Site Characterization
(1)
A Site Characterization must be conducted to delineate the nature and extent
(vertically and horizontally) of contamination on and under the Site. Site
characterization data should be collected and presented in accordance with the
Quality Assurance Project Plan (QAPP) and Site Characterization Report formats.
In general, the Applicant must demonstrate that the data are representative of the
actual and/or potential contamination conditions at the Site. Collected data must
include information describing and delineating the contaminant source area.
Information pertaining to the characteristics of the CoCs, including the chemical
and physical properties as well as the potential of the CoCs to migrate and
transport to receptor locations through or in the affected media, must also be
provided.
(2)
The degree of contamination in surface and subsurface soil should be determined
by performing soil boring(s) down to the depth of groundwater in the saturated
zone. Surface soil is defined as the soil located at the surface and extending to a
depth of six (6) feet below the ground surface. The subsurface soil depth is any
depth beyond six feet. The Applicant must address ingestion, potential dermal
contact, and inhalation (through volatilization and particulates) of hazardous
chemicals present in the surface soil. In addition, CoCs in the surface soil may be
transported off-site through precipitation runoff.
(3)
The Applicant must demonstrate that groundwater is not impacted by the site-
related contaminant; or that if groundwater is impacted, the impacted groundwater
is confined and will remain confined within the Site. Groundwater contaminant
concentrations should be determined by collecting groundwater samples.
(4)
Measured data are those data collected from temporary or permanent (monitoring)
wells. The Applicant should install wells, as necessary, to delineate the vertical
and horizontal extent of groundwater impact and to determine flow direction and
groundwater quality. Wells must be installed, developed, purged, and sampled in
a manner consistent with EPA Region IV, Science and Ecological Support
Division, Environmental Investigations Standard Operating Procedures and
Quality Assurance Manual, May 1996, as amended, or other procedures approved
by MDEQ. Measured groundwater data must be based on unfiltered groundwater
samples.
(5)
The site characterization data should be collected in accordance with data quality
objectives (DQOs) stipulated in the QAPP. The DQOs shall, at a minimum,
identify the number of field and quality control samples, quantitation limits,
analytical methods, and sample collection, preservation, and handling methods.
Matrix interferences shall be minimized to the extent feasible by modified sample
extraction and preparation methods in accordance with EPA or MDEQ approved
analytical methodologies.
(6)
The data collection strategy should be based on the Site Conceptual Exposure
Model (SCEM) that hypothesizes or describes how the source chemicals or CoCs
are released, transported, and exposed to the receptors.
(7)
The Applicant must demonstrate that the analytical laboratory data have been
reviewed for compliance with the DQOs. In the Site Characterization Report, the
Applicant shall data that meet DQOs.
(8)
To establish background chemical concentrations, the Applicant may collect
samples from locations, as approved by MDEQ, outside of the influence of known
contaminated areas and regionally prevalent chemicals and must analyze these
samples using the same analytical methods as the CoC analyses.
(9)
To establish regionally prevalent chemical concentrations, the Applicant may
collect samples from locations, as approved by MDEQ, throughout a substantial
geographic region and outside the influence of known contaminated areas and
must analyze these samples using the same analytical methods as the CoC
analyses.
(10)
Historical data approved by MDEQ may be submitted in lieu of collecting new
data provided that:
(a)
the Site characterization data requirements are summarized and presented
in accordance with the Quality Assurance Project Plan and Site
Characterization Report Formats; and
(b)
the data was collected in a manner consistent with appropriate sampling
protocols, as approved by MDEQ.
All detailed information must be referenced in the reports including sampling
protocols. In any event, relevant previous site characterization reports should be
submitted along with the application. Deviations from the required methodologies
in the Quality Assurance Project Plan, Site Characterization Report, for
Corrective Action Plan formats must be presented to and approved by MDEQ.
D.
Site Ecological Checklist
The Ecological Checklist is used to determine if ecological receptors of concern are
present and potentially impacted (See Appendix D). If such receptors are present, MDEQ
will make a determination as to whether a Tier 3 assessment of ecological risk should be
performed to assess the potential ecological impact. Tier 1 and Tier 2 Evaluations are
applicable for Sites with no known ecological receptors of concern.