11 MAC Pt. 4, R. 1.7
Processing Facility Requirements
Cite as 11 Miss. Admin. Code Pt. 4, R. 1.7
Processing Facility Requirements.
A.
(1)
An individual permit or a certificate of coverage of a general permit is required
for the operation of a processing facility. An individual permit or certificate of
coverage under any applicable general permit must be issued prior to the receipt
of any waste.
(2)
An applicant for a new processing facility shall complete an application for
coverage under any applicable general permit or an individual permit on forms
provided by the Department. Such submittal shall demonstrate that the facility
will comply with all applicable requirements of Rules 1.2, 1.3, and 1.7 of these
regulations and the terms and conditions of a general permit or an individual
permit.
(3)
Owners of existing processing facilities, which have been issued an individual
permit, may request that their permit be revoked and that they be issued a
certificate of coverage under any applicable general permit. Likewise, owners of
existing processing facilities, which have been previously issued a certificate of
coverage under a general permit may request that their certificate of coverage be
revoked and that they be issued an individual permit.
B.
Processing facilities shall comply with all applicable federal and state air emission and
wastewater discharge laws and regulations.
C.
Surface drainage in and around the facility shall be controlled to minimize surface water
runoff onto, into, and off the treatment area.
D.
Any liquids accumulated at the facility, including leachate, washwater, or contaminated
rainfall runoff, shall be controlled in a manner that will prevent obnoxious odors and
pollution of waters of the State.
E.
Processing facilities shall be operated in manner that ensures the health, safety, and
aesthetic aspects of a community are not endangered by the location and operation of the
facility. Depending on the specific solid waste handling or processing operation
involved, several of the operational standards prescribed for solid waste landfill sites may
be applicable and shall be followed, if appropriate.
F.
The facility shall not accumulate solid waste in quantities that cannot be processed within
such times as will preclude the creation of objectionable off-site odors, fly-breeding, or
harborage of other vectors. If such accumulations occur, additional solid waste shall not
be received until the adverse conditions are abated.
G.
If a significant work stoppage should occur at a solid waste processing facility, due to a
mechanical breakdown or other cause and is anticipated to last long enough to create
objectionable odors, fly-breeding, or harborage of vectors, steps shall be taken to remove
the accumulated solid waste from the site to an approved alternate back-up processing or
disposal facility.
H.
When processing putrescible wastes, all working surfaces that come in contact with
wastes shall be washed down or otherwise cleaned as needed to prevent objectionable
odors, vector breeding and harborage, nuisance conditions, or other unsanitary
conditions.
I.
If a facility is not completely enclosed, wire or other type fencing or screening shall be
provided when necessary to minimize windblown materials. Litter resulting from the
operation shall be collected and returned to the processing area as frequently as necessary
to minimize unsightly conditions and fire hazards.
J.
Open burning of solid waste, except for land clearing debris generated on the site of the
facility, shall be prohibited. An adequate supply of water under pressure at the site or an
adequate stockpile of earth reasonably close to the processing area shall be provided, or
there shall be a nearby organized Fire Department providing service when called. The
Department may approve alternate methods of fire protection or waive this requirement
when there is no need for fire protection. Should an accidental fire occur, the owner shall
immediately take action to extinguish the fire and shall promptly notify the Department.