11 MAC Pt. 5, R. 3.8
Certification
Cite as 11 Miss. Admin. Code Pt. 5, R. 3.8
Certification.
A.
The Department shall issue certification to applicants who meet all certification
requirements.
B.
Certifications for Installation Contractors, Permanent Closure Contractors, and UST
Technicians shall be issued for a period of two (2) years.
C.
Certifications for Certified Cathodic Protection Testers shall be issued for a period not to
exceed their corresponding Department approved third party Cathodic Protection
licensure.
D.
A certified individual who changes employers must submit a revised certification
application and meet the requirements in A.4, A.5,and A.6 in Rule 3.6, before a revised
certificate will be issued.
E. An individual certified to install alter UST systems will be considered to have met the
requirements for classification as a certified UST Technician.
F.
An individual certified to install, and alter UST systems before (date of implementation of
regulations), will be classified as a Certified Cathodic Protection Tester for a period of 2
years. After (two years from date of implementation of regulations), the individual
certified to install and alter UST systems must be certified by the Department as a
Cathodic Protection Tester to test Cathodic Protection.
G.
An individual certified by the Department as a “Certified Installation Contractor” or
“Certified UST Technician” must maintain any applicable manufacture required
certification and / or recertification of testing equipment, test procedure, installation
methods or installation procedures.